My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1901 N Fairview St & Bldg A, B, C, F & 1919 N Fairview St Bldg E - Plan
PBA
>
Building
>
ProjectDox
>
F
>
Fairview St
>
1901 N Fairview St Bldg# B
>
1901 N Fairview St & Bldg A, B, C, F & 1919 N Fairview St Bldg E - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 2:00:13 AM
Creation date
6/6/2025 1:22:19 PM
Metadata
Fields
Template:
Plan
Permit Number
20180424
20180427
20180439
20180441
20180444
101116031
101119651
Full Address
1901 N Fairview St Bldg# B
1901 N Fairview St Bldg# C
1919 N Fairview St Bldg# E
1901 N Fairview St Bldg# F
1901 N Fairview St
Street Number
1901
1901
1919
1901
1901
Street Direction
N
N
N
N
N
Street Name
Fairview
Fairview
Fairview
Fairview
Fairview
Street Suffix
St
St
St
St
St
Building Number
B
C
E
F
Permit Number (Not in SAPIN)
2018049
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
694
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Name:Samueli Academy Engineer:Elie Sayegh, PE <br />Project No.:1074220072 Date: 2/16/2024 <br />Proposed Screw:#12 wood or metal screws <br />Factor of Safety:5.0 (FS) <br />Cd:1.6 <br />Allow. Shear:590 Per APA E830 E, Table 1 - Va Shear Capacity, min 1/2" depth of thread penetration, Unfactored <br />Capacity * Cd/ FS:188.8 lbs <br />Allow. Withdrawal:315 Per APA E830 E, Table 3 - Ta Withdrawal Capacity, min 1/2" depth of thread penetration, Unfactored <br />Capacity * Cd/ FS:100.8 lbs <br />Qty of Screws:8 <br />Total Shear Capacity:1510 lbs <br />Total Uplift Capacity:806 lbs <br />Wind <br />(Ib) <br />Seismic <br />(Ib) <br />Wind <br />(Ib-in) <br />Seismic <br />(Ib-in)Wind Seismic Wind Seismic <br />A 148 189 641 182 10% 13% 80% 23% <br />E_Upper 131 52 651 50 9% 3% 81% 6% <br />E_Lower 32 231 516 222 2% 15% 64% 28% <br />B 89 42 472 40 6% 3% 58% 5% <br />F 0 85 441 82 0% 6% 55% 10% <br />Racking - Screw Attachement <br />Racking - Required Qty of Screws <br />Building <br />Horizontal (H) Total Vertical (V) Uplift DCRShear DCR <br />Therefore, 8 - #12 wood or metal screws are adequate to resist horizontal and <br />uplift loads <br />PCC2.3.2 <br />1901 N Fairview St & Bldg A, B, <br />C, F & 1919 N Fairview St Bldg E <br />4/11/2024
The URL can be used to link to this page
Your browser does not support the video tag.