Laserfiche WebLink
MECHANICAL ATTACHMENT <br />AT INDICATED LOCATION <br />NOTE: <br />EXAMPLE BALLAST AND <br />ATTACHMENTS SHOWN ON THIS <br />PAGE ARE FOR REFERENCE <br />ONLY. REFER TO BALLAST MAP <br />SHEETS FOR ARRAY SPECIFIC <br />BALLAST/ATTACHMENT <br />REQUIREMENTS. <br />BALLAST QUANTITY: <br />"#"=QUANTITY OF BALLAST BLOCK INSTALLED CENTEREDUNDER MODULE <br />IF NO BALLAST QUANTITY SHOWN, DO NOT PLACE BALLAST <br />SEE INSTALLATION MANUAL FOR NOTES ON INSTALLING <br />MORE THAN FOUR BALLAST BLOCKS PER MODULE <br />DO NOT INSTALL ADDITIONAL RAIL TO HOLDBALLAST ON MODULES WITH NO BALLASTSHOWN. <br />4 3 3 5 <br />252 <br />2 2 4 <br />5 BALLAST BLOCKS REQUIRE TWO (2) RAILS. <br />RE <br />V <br />DE <br />S <br />C <br />R <br />I <br />P <br />T <br />I <br />O <br />N <br />PR <br />E <br />P <br />CH <br />E <br />C <br />K <br />DA <br />T <br />E <br />PANELCLAW, INCALL INFORMATION CONTAINED WITHIN THISDOCUMENT IS PROPERTY OF PANELCLAW, INC.THE PURPOSE OF THIS DOCUMENT IS TOFACILITATE THE INSTALLATION OF PANELCLAWSOLAR PHOTOVOLTAIC MOUNTING SYSTEMS. DONOT COPY OR DISTRIBUTE WITHOUT PERMISSION. <br /> C <br />SCALE: <br />0"1/2"1"2" <br />ORIGINAL SIZE 36"X24" <br />SHEET SIZE ARCH "D" <br />1600 OSGOOD ST. SUITE 2023 <br />NORTH ANDOVER, MA 01845 <br />TEL: 978.688.4900 <br />www.panelclaw.com <br />STAMP: <br />PREPARED FOR: <br />PROJECT: <br />LOCATION: <br />REVISION:SHEET: <br />8 7 6 5 4 3 2 1 <br />8 7 6 5 4 3 2 1 <br />SHEET TITLE: <br />A <br />B <br />C <br />D <br />A <br />B <br />C <br />D <br />RACKING CONSTRUCTION SET <br />SCALE: <br />B <br />NTSSCALE: <br />A <br />NTS <br />RACKING CONSTRUCTION SET <br />Messi <br />Samueli Academy Bldg B <br />1909 North Fairview Street, Santa <br />Ana, CA, USA <br />1 PC-7 <br />BALLAST LEGEND <br />APPROVED FOR CONSTRUCTION <br />23.05.22.1 v3.0.9404.6.1 <br />PC-7 PC-7 <br />1 <br />AF <br />C <br /> <br />s <br />e <br />t <br />SM <br />20 <br />2 <br />3 <br />- <br />0 <br />6 <br />- <br />2 <br />6 <br />0 <br />Re <br />v <br />0 <br />SM <br />20 <br />2 <br />3 <br />- <br />0 <br />6 <br />- <br />2 <br />1 <br />_________________________ <br />nature <br />_________________________________________________ <br />_____________________________________________________________ <br />_________________________ <br />nature <br />________________________________________________ <br />_____________________________________________________________ <br />DRAWINGS ARE PREPARED BY OTHERS & REVIEWED <br />ONLY FOR ADEQUATE STRUCTURAL ELEMETNS BY <br />ELIE SAYEGH, PE AT MOTIVE ENERGY. <br />02/15/2024 <br />2 <br />1901 N Fairview St & Bldg A, B, <br />C, F & 1919 N Fairview St Bldg E <br />4/11/2024