My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1901 N Fairview St & Bldg A, B, C, F & 1919 N Fairview St Bldg E - Plan
PBA
>
Building
>
ProjectDox
>
F
>
Fairview St
>
1901 N Fairview St Bldg# B
>
1901 N Fairview St & Bldg A, B, C, F & 1919 N Fairview St Bldg E - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 2:00:13 AM
Creation date
6/6/2025 1:22:19 PM
Metadata
Fields
Template:
Plan
Permit Number
20180424
20180427
20180439
20180441
20180444
101116031
101119651
Full Address
1901 N Fairview St Bldg# B
1901 N Fairview St Bldg# C
1919 N Fairview St Bldg# E
1901 N Fairview St Bldg# F
1901 N Fairview St
Street Number
1901
1901
1919
1901
1901
Street Direction
N
N
N
N
N
Street Name
Fairview
Fairview
Fairview
Fairview
Fairview
Street Suffix
St
St
St
St
St
Building Number
B
C
E
F
Permit Number (Not in SAPIN)
2018049
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
694
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
127'-11" <br />75'-2" <br />60'-4" <br />22' <br />5 <br />128'-7" <br />4' <br /> <br />F <br />I <br />R <br />E <br /> <br />L <br />A <br />N <br />E <br />4' <br /> <br />F <br />I <br />R <br />E <br /> <br />L <br />A <br />N <br />E <br />4' FIRE LANE <br />4' <br /> <br />F <br />I <br />R <br />E <br /> <br />L <br />A <br />N <br />E <br />4' FIRE LANE4' FIRE LANE <br />4' <br /> <br />F <br />I <br />R <br />E <br /> <br />L <br />A <br />N <br />E <br />4' <br /> <br />F <br />I <br />R <br />E <br /> <br />L <br />A <br />N <br />E <br />4' <br /> <br />F <br />I <br />R <br />E <br /> <br />L <br />A <br />N <br />E <br />4' <br /> <br />F <br />I <br />R <br />E <br /> <br />L <br />A <br />N <br />E <br />266'-8" <br />110'-10" <br />+7.02 <br />+27 <br />+32.73 <br />+5.63 <br />+9.26 <br />+32.61 <br />+32.52 <br />+2.69 <br />+50.04 <br />+2.33 <br />+50.17 <br />+1.37 <br />+4.26 <br />+49.96 <br />+11.37 <br />+11.66 <br />+10.02 <br />+10.24 <br />+10.99 <br />+10.88 <br />+49.7 <br />+3.80 <br />+10.65 <br />+28.04 <br />+4.03 <br />+19.69 <br />15' <br />108'-11" <br />125'-3" <br />75'-4" <br />4' FIRE LANE <br />4' <br /> <br />F <br />I <br />R <br />E <br /> <br />L <br />A <br />N <br />E <br />4' <br /> <br />F <br />I <br />R <br />E <br /> <br />L <br />A <br />N <br />E <br />4' FIRE LANE <br />+40.74 <br />+9.97 <br />+32.68 <br />+3.17 <br />+3.20 <br />+32.46 <br />+3.68 <br />+32.52 <br />+10.05 <br />+41.59 <br />+41.63 <br />+9.61 <br />+11.18 <br />+11.39 <br />+11.30 <br />+11.30 <br />99'-1" <br />96'-1" <br />138'-6" <br />162'-7" <br />109'-4" <br />85'-7" <br />10' <br />4' <br /> <br />F <br />I <br />R <br />E <br /> <br />L <br />A <br />N <br />E <br />4' FIRE LANE <br />4' <br /> <br />F <br />I <br />R <br />E <br /> <br />L <br />A <br />N <br />E <br />4' <br /> <br />F <br />I <br />R <br />E <br /> <br />L <br />A <br />N <br />E <br />4' <br /> <br />F <br />I <br />R <br />E <br /> <br />L <br />A <br />N <br />E <br />4' <br /> <br />F <br />I <br />R <br />E <br /> <br />L <br />A <br />N <br />E <br />4' FIRE LANE <br />4' FIRE LANE 4' FIRE LANE4' FIRE LANE 4' FIRE LANE <br />+0.90 <br />+34.09 <br />+34.78 <br />+1.00 <br />+1.71 <br />+6.88 <br />+1.54 <br />+35.16 <br />63'-4" <br />116'-6" <br />111'-10" <br />33'-2" <br />4' FIRE L <br />A <br />N <br />E <br />4' <br /> <br />F <br />I <br />R <br />E <br /> <br />L <br />A <br />N <br />E <br />4' <br /> <br />F <br />I <br />R <br />E <br /> <br />L <br />A <br />N <br />E <br />4' FIRE LANE 4' FIRE LANE <br />4' FIRE L <br />A <br />N <br />E <br />4' FIRE L <br />A <br />N <br />E <br />4' <br /> <br />F <br />I <br />R <br />E <br /> <br />L <br />A <br />N <br />E <br />H <br />+24.25 <br />+11.20 <br />+11.15 <br />+17.65 <br />+21.25 <br />+21.25 <br />98'-10" <br />81' <br />CUSTOMER <br />DATE: <br />SCALE: <br />SHEET # <br />CUSTOMER <br />E-1.3 <br />APN <br />PLAN SET REVISIONS <br />399-031-24 / 399-031-23 <br />6/8/2023 <br />SAMUELI ACADEMY <br />1901/1919 N. FAIRVIEW ST. <br />SANTA ANA, CA. 92705 <br />CONTRACTOR SIGNATURE: <br />DAVID CLEVELAND <br />CO <br />N <br />T <br />R <br />A <br />C <br />T <br />O <br />R <br />' <br />S <br /> <br />L <br />I <br />C <br />E <br />N <br />S <br />E <br /> <br /># <br /> <br />1 <br />0 <br />8 <br />9 <br />1 <br />1 <br />7 <br />CO <br />N <br />T <br />R <br />A <br />C <br />T <br />O <br />R <br />' <br />S <br /> <br />L <br />I <br />C <br />E <br />N <br />S <br />E <br /> <br /># <br /> <br />1 <br />0 <br />8 <br />9 <br />1 <br />1 <br />7 <br />DRAWN BY: <br />CHECKED BY: <br />APPROVED BY: <br />ENGINEER STAMP <br /> NEW EQUIPMENT & ROOF MOUNT LOCATED ON <br />BUILDING E <br />N <br />E <br />S <br />W <br />45° <br />135°225° <br />315° <br />NEW ROOF MOUNT LOCATION BUILDING A13 <br />ROOF MOUNT & EQUIPMENT <br />LOCATION DETAILS <br />SCALE: 1" = 15'-0"SCALE: 1" = 15'-0" <br /> NEW EQUIPMENT & ROOF MOUNT LOCATED ON BUILDING B NEW EQUIPMENT & ROOF MOUNT LOCATED ON BUILDING F 52SCALE: 1" = 16'-0" <br />AS INDICATED <br />J.D. 12-01-22 <br />S.M. 05-02-23 <br />B.B. 05-02-23 <br /> NEW ROOF MOUNT LOCATION BUILDING C4 SCALE: 1" = 16'-0" <br />N <br />E <br />S <br />W <br />45° <br />135°225° <br />315° <br />N <br />E <br />S <br />W <br />45° <br />135°225° <br />315° <br />N <br />E <br />S <br />W <br />45° <br />135°225° <br />315° <br />BUILDING F <br />(N) ROOF MOUNT <br />ARRAY #1 <br />(N) PV MODULES (TYP.) <br />(N) ROOF MOUNT <br />ARRAY #2 <br />(N) ROOF MOUNT <br />ARRAY #3BUILDING E <br />BUILDING A <br />(N) ROOF MOUNT <br />ARRAY #4 <br />BUILDING C <br />(N) INVERTER #8 SE80K <br />LOWER ROOF <br />WALL BUILDING F <br />(N) AC DISCONNECT <br />(N) INVERTER #9 SE80K <br />(N) INVERTER #10 SE100K <br />(N) PANELBOARD DP-PV2 <br />BUILDING E <br />(N) ROOF MOUNT <br />ARRAY #5 <br />SCALE: 1" = 16'-0" <br />(N) ROOF MOUNT <br />ARRAY #6 <br />BUILDING B <br />1901 N Fairview St & Bldg A, B, <br />C, F & 1919 N Fairview St Bldg E <br />4/11/2024
The URL can be used to link to this page
Your browser does not support the video tag.