My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1441 W 17th St - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Seventeenth St
>
1441 W Seventeenth St
>
1441 W 17th St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 1:22:49 PM
Creation date
6/6/2025 1:22:19 PM
Metadata
Fields
Template:
Plan
Permit Number
20180369
101115926
Full Address
1441 W Seventeenth St
Document Relationships
101115926 - Permit
(Permit - Plan)
Path:
\Building\Permits\S\Seventeenth St\1441 W Seventeenth St
20180369 - Permit
(Permit - Plan)
Path:
\Building\Permits\S\Seventeenth St\1441 W Seventeenth St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> www.icc-es.org | (800) 423-6587 | (562) 699-0543 A Subsidiary of the International Code Council ® <br /> <br /> <br /> <br />ACCEPTANCE CRITERIA FOR PROPRIETARY ATTACHMENT SYSTEMS <br />OF PHOTOVOLTAIC (PV) ARRAYS TO ROOF ASSEMBLIES <br /> <br /> <br />AC467 <br /> <br /> <br />Approved June 2016 <br /> <br />(Editorially revised October 2022) <br /> <br />Previously editorially revised July 2019 <br /> <br /> <br />PREFACE <br /> <br />Evaluation reports issued by ICC Evaluation Service, LLC (ICC-ES), are based upon performance features of the International family <br />of codes. (Some reports may also reference older code families such as the BOCA National Codes, the Standard Codes, and the <br />Uniform Codes.) Section 104.11 of the International Building Code® reads as follows: <br />The provisions of this code are not intended to prevent the installation of any materials or to prohibit any design <br />or method of construction not specifically prescribed by this code, provided that any such alternative has been <br />approved. An alternative material, design or method of construction shall be approved where the building official <br />finds that the proposed design is satisfactory and complies with the intent of the provisions of this code, and that <br />the material, method or work offered is, for the purpose intended, at least the equivalent of that prescribed in this <br />code in quality, strength, effectiveness, fire resistance, durability and safety. <br />This acceptance criteria has been issued to provide interested parties with guidelines for demonstrating compliance with <br />performance features of the codes referenced in the criteria. The criteria was developed through a transparent process involv ing <br />public hearings of the ICC-ES Evaluation Committee, and/or on-line postings where public comment was solicited. <br />New acceptance criteria will only have an “approved” date, which is the date the document was approved by the Evaluation <br />Committee. When existing acceptance criteria are revised, the Evaluation Committee will decide whether the revised document should <br />carry only an “approved” date, or an “approved” date combined with a “compliance” date. The compliance date is the date by which <br />relevant evaluation reports must comply with the requirements of the criteria. See the ICC-ES web site for more information on <br />compliance dates. <br />If this criteria is a revised edition, a solid vertical line (│) in the margin within the criteria indicates a change from th e previous <br />edition. A deletion indicator (→) is provided in the margin where any significant wording has been deleted. <br />ICC-ES may consider alternate criteria for report approval, provided the report applicant submits data demonstrating that the <br />alternate criteria are at least equivalent to the criteria set forth in this document, and otherwise demonstrate compliance with the <br />performance features of the codes. ICC-ES retains the right to refuse to issue or renew any evaluation report, if the applicable product, <br />material, or method of construction is such that either unusual care with its installation or use must be exercised for satisfactory <br />performance, or if malfunctioning is apt to cause injury or unreasonable damage. <br />Acceptance criteria are developed for use solely by ICC-ES for purposes of issuing ICC-ES evaluation reports. <br />ICC EVALUATION SERVICE® and ICC-ES® (and their associated logos) are registered trademarks and service marks of ICC Evaluation <br />Service, LLC, and INTERNATIONAL CODE COUNCIL®, ICC®, INTERNATIONAL BUILDING CODE® and IBC® (and their associated logos) <br />are registered trademarks and service marks of its parent company, International Code Council, Inc. <br />No portion of this document (AC467) may be copied, reproduced, reprinted, republished, distributed, transmitted, or modified in any form or <br />manner without the express prior written permission of ICC-ES. Any request for such permission should be addressed to ICC-ES at 3060 <br />Saturn Street, Suite 100, Brea, California 92821. Any of the foregoing expressly authorized by ICC-ES must include all the copyright, <br />trademark, service mark and other proprietary rights notices contained herein. <br />Copyright © 2022 ICC Evaluation Service, LLC. All rights reserved. <br />1441 W 17th St - 101115926 & <br />20180369 <br />11/16/2023
The URL can be used to link to this page
Your browser does not support the video tag.