Laserfiche WebLink
FIN. FLR. LEV. <br />WHERE REQUIRED) <br />(USE REDUCING TYPE <br />COMB. "Y" & 1/8" BEND <br />6" Thk. CONCRETE PAD <br />SEWER MATERIAL AND <br />SIZE AS SPECIFIED <br />DUTY REQUIRED <br />w/ COVER FOR <br />GRADE OR PAVING <br />CAST IRON CLEANOUT <br />(V <br />E <br />R <br />I <br />F <br />Y <br /> <br />@ <br /> <br />S <br />I <br />T <br />E <br />) <br />VA <br />R <br />I <br />E <br />S <br />6" DIA. <br />SEWER UP TO <br />SAME SIZE AS <br />EXTENSION <br />CAST IRON <br />CENTER PIPE <br />SLEEVE. <br />INSULATION <br />LATION) IN <br />(AND INSU- <br />IF WALL IS PRE- <br />THRU SLEEVE: <br />DO NOT BUTT <br />AGAINST WALL. <br />CONTINUES <br />WILL NOT HAVE <br />OMIT SLEEVE. <br />CONCEALED PIPE <br />ESCUTCHEON TO <br />CAST CONCRETE, <br />CORE DRILL AND <br />COVER PENETRATION. <br />REFER TO SPECIFICATIONS FOR ALTERNATIVE INSTALLATIONS. <br />REFER TO ARCHITECTURAL DRAWINGS FOR WALL LOCATIONS. <br />PROVIDE GALVANIZED <br />STEEL PIPE SLEEVE <br />EXPOSED PIPE SHALL <br />HAVE ESCUTCHEON TO <br />COVER PENETRATION. <br />GROUTED INTO WALL. <br />PIPE OR CONDUIT <br />UNIT CONSTRUCTION <br />IF WALL IS MASONRY <br />OR POURED CONCRETE, <br />INSULATED <br />PIPE <br />UNINSULATED <br />PIPE <br />GLASS INSULATION <br />SPACE BETWEEN <br />SLEEVE AND PIPE <br />SOLID WITH FIBER- <br />PACK ANNULAR <br />(FOR ACOUSTICS). <br />CAST IRON LONG SWEEP <br />1/4" BEND OR CAST IRON <br />SLEEVE FLUSH <br />WITH WALL <br />PIPE OR MINIMUM 18 GA <br />GALVANIZED STEEL <br />WALLBOARD, PROVIDE <br />PLACE AS REQUIRED. <br />OR GROUT SLEEVE IN <br />METAL SLEEVE. CAULK <br />GALVANIZED SHEET <br />ROOFING <br />CONSTRUCTION <br />VENT STACK <br />ROOF CONSTRUCTION <br />LEAD FLASHING <br />MOP IN WITH ROOFING MATERIAL <br />INCREASER WHEN REQUIRED <br />SHEET LEAD FLASHING <br />MI <br />N <br />. <br />1 <br />2 <br />" <br />AS REQUIRED <br />SLEEVE ROOF <br />MIN.12" <br />TURN LEAD <br />DOWN INTO <br />STACK <br />WOOD STRUCTURE <br />4"=5/8". LOCATE HANGERS WITHIN 1'-0" OF VALVES AND FITTINGS. <br />DO NOT SUSPEND PIPE FROM JOIST BRACING MEMBERS. REFER TO CODES <br />AND SPECIFICATIONS FOR FURTHER INFORMATION. PROVIDE SEISMIC <br />CHAINS AND PERFORATED STRAP IRON AND STEEL ARE NOT ACCEPTABLE. <br />WATER PIPE AGAINST SWAYING DUE TO CHANGES IN WATER VELOCITY. <br />LOCATE HANGERS WITHIN 1'-0" OF EQUIPMENT CONNECTIONS. ANCHOR <br />PROVIDE SUPPLEMENTAL STEEL STRUTS BETWEEN JOISTS IF REQUIRED. <br />BRACING IF/AS REQUIRED BY LOCAL AUTHORITIES. <br />PENETRATE VAPOR BARRIER. DO NOT HANG ONE PIPE FROM ANOTHER <br />ROD SIZES FOR PIPE SIZE: 2" AND SMALLER=3/8", 2 1/2" TO 3"=1/2", <br />INDICATED IN TABLE. CAST IRON: 10' AND WITHIN 1'-0" OF ALL JOINTS. <br />DRAINABLE LOCATIONS. HANGER SPACING FOR PIPE SIZES: AS <br />EXCEPT IN CHASES. SLOPE ALL WATER PIPING SLIGHTLY TOWARD <br />THICKNESS WHEN SIZING HANGERS AND SHIELDS. <br />HERE. DO NOT INSTALL HANGER INSIDE INSULATION OR OTHERWISE <br />PROVIDE UPPER ATTACHMENT AS REQUIRED FOR CASES NOT SHOWN <br />ALL INSULATED PIPE. VERIFY INSULATION <br />PROVIDE GALVANIZED STEEL SHEILD FOR <br />8'6'1" <br />3" <br />4"10' <br />10'10' <br />10' <br />1-1/2" <br />2" <br />2-1/2" <br />1-1/4" <br />10'6' <br />10' <br />10'10' <br />10' <br />6'10' <br />AND SMALLER <br />HA <br />N <br />G <br />E <br />R <br /> <br />S <br />P <br />A <br />C <br />I <br />N <br />G <br />ST <br />E <br />E <br />L <br /> <br />P <br />I <br />P <br />E <br />HA <br />N <br />G <br />E <br />R <br /> <br />S <br />P <br />A <br />C <br />I <br />N <br />G <br />PI <br />P <br />E <br /> <br />S <br />I <br />Z <br />E <br />CO <br />P <br />P <br />E <br />R <br /> <br />P <br />I <br />P <br />E <br />1/2"1/2" <br />3/4" <br />6'6' <br />6'6' <br />HANG PIPE LARGER THAN <br />4" FROM TOP OF JOISTS <br />AND CAST IRON PIPE 2" <br />ADJUSTABLE BAND HANGER <br />FOR PIPE 3-1/2" AND SMALLER <br />SIDE BEAM CONNECTOR <br />CHORD OF WOOD TRUSS <br />ATTACHED TO TOP <br />ONLY AT PANEL POINT <br />CONTACT BARE <br />COPPER PIPE <br />PROVIDE COPPER <br />WHERE HANGERS <br />COATED HANGERS <br />ALL-THREAD ROD <br />WALL <br />CONDENSATE DRAIN <br />VENT <br />FLEX. HOSE <br />CONNECTION <br />DRAIN <br />FIN. FLOOR <br />LAVATORY <br />OR SINK <br />TAILPIECE <br />SLIP JOINT <br />P-TRAP <br />ROOF <br />HVAC UNIT <br />ON ROOF <br />3" HIGH,RUNNING <br />TRAP. <br />HANGER ROD <br />HEAVY DUTY <br />SUPPORT NUT <br />LOCKING NUT <br />8" LONG MINIMUM <br />WITH VAPOR BARRIER INSULATION <br />INSULATION <br />VAPOR BARRIER <br />SHEET STEEL SADDLE <br />16 GA. ZINC COATED <br />CLEVIS HANGER <br />PIPEHEAVY DUTY <br />NO VAPOR BARRIER INSULATION <br />SINGLE HORIZONTAL RUNS <br />CLEVIS HANGER <br />CLEVIS HANGER <br />PIPE <br />SINGLE HORIZONTAL RUNS <br />CLEVIS HANGER <br />HANGER ROD <br />LOCKING NUT <br />SUPPORT NUT <br />MAX.4"-0" <br />MAX.12" <br />H <br />NOTES: <br />1.DETAIL PROVIDED FOR UTILITY REQUIREMENTS. <br />REFER TO MANUFACTURER'S INSTALLATION GUIDE <br />FOR ADDITIONAL INFORMATION. HENRY SCHEIN <br />DENTAL REP WILL PROVIDE INSTALLATION TEMPLATE <br />UPON REQUEST. <br />2.INSTALLATION MUST CONFORM TO ALL LOCAL <br />ELECTRICAL AND PLUMBING CODES. <br />3.ALL UTILITIES HEREIN TO BE SUPPLIED & INSTALLED BY <br />LICENSED CONTRACTORS. FINAL CONNECTIONS <br />TO EQUIPMENT BY HENRY SCHEIN DENTAL. <br />4.ALL VALVES, BOXES AND PIPES FROM FLOOR MUST <br />BE NO HIGHER THAN 5 1/4" A.F.F. <br />5.ALL PLUMBED SYSTEMS MUST BE FLUSHED CLEAN OF <br />ANY DEBRIS PRIOR TO EQUIPMENT INSTALLATION. <br />3 DCI EDGE SERIES 5 CABINET UTILITIES <br />TOP VIEW <br />COMPRESSED AIR: 1/2" SUPPLY LINE FROM COMPRESSOR BY PLUMBER. STUB-UP FROM FLOOR 1”-2”. <br />TERMINATE WITH 3/8” ANGLE VALVE. PRESSURE 100 PSI MAX. <br />WATER: 1/2" COLD WATER SUPPLY LINE BY PLUMBER. STUB-UP FROM FLOOR 1”-2”. TERMINATE <br />WITH 3/8" ANGLE VALVE. PRESSURE 40 PSI MAX. <br />ELECTRICAL: 16" FLEX CONDUIT WITH TWO GANG BOX & 115V QUAD OUTLET BY ELECTRICIAN. MAX <br />DRAW: 15A <br />CENTRAL VACUUM: 5/8" RISER BY PLUMBER (SCH. 40 PVC OR TYPE M COPPER). TERMINATE 1"-2" A.F.F. <br />A <br />W <br />E <br />V <br />UTILITIES TO BE RUN IN <br />FLOOR OR WALL BASED <br />ON SITE CONDITIONS <br />CL <br />W C <br />A V <br />3-3/8" SUPPORT WALL FOR <br />FREESTANDING CABINET <br />CONDUIT: PVC CONDUIT WITH PULL-STRING BY ELECTRICIAN. 6" MIN. RADIUS FOR ALL BENDS. <br />STUB-UP FLUSH WITH SUB-FLOOR, MARK LOCATION AT FINISH. QUANTITY OF CONDUIT TERMINATIONS WILL <br />VARY, SEE SHEET SE.1 FOR SIZES & LOCATIONS. <br />C <br />ELEVATION VIEW <br />CL <br />AVAILABLE SPACE FOR PLACEMENT OF <br />UTILITIES (LOCATE AS NEEDED) <br />W A <br />E <br />CABINET <br />TOE KICK <br />UTILITIES TO STUB-OUT <br />FROM WALL 6" (MIN.) <br />FINISHED <br />FLOOR <br />ALLOW 16" ELECTRICAL <br />WHIP TO EXTEND FROM <br />STUB-OUT FOR HOOK-UPS <br />V <br />CABINET BASE <br />CUT-OUTS WITHIN <br />CABINET BASE <br />DWV WYE FITTING <br />VACUUM LINE GUIDELINES <br />SUB FLOOR <br />BRANCH <br />EXAMPLES <br />THE VACUUM PIPING LAYOUT HAS A LARGE EFFECT ON THE EFFICIENCY AND <br />RELIABILITY OF THE DENTAL VACUUM SYSTEM. REFER TO MANUFACTURER'S <br />PRE-INSTALLATION GUIDE PROVIDED BY HENRY SCHEIN EQUIPMENT SPECIALIST <br />(FOR SPECIFIC SIZING OF STUB-UP, TRUNK, AND BRANCH LINES. <br />IT IS HIGHLY RECOMMENDED THAT VACUUM LINES RUN UNDERNEATH DENTAL <br />EQUIPMENT BY MEANS OF TRENCHING/CORING (CONCRETE SLAB) OR SUB-FLOOR <br />(BASEMENT/CRAWL SPACE). ALL LINES ARE TO BE DESIGNED WITH PVC PIPING <br />UNLESS DICTATED BY LOCAL CODES TO USE COPPER OR CAST IRON. <br />I. STUB-UP <br />TERMINATE VACUUM TRUNK LINE IN MECHANICAL ROOM. PLUMBER TO PROVIDE <br />FPT ADAPTOR ON END OF STUB-OUT FROM FLOOR OR WALL, SIZE PER <br />MANUFACTURER SPECIFICATIONS. SEE DETAILS (THIS SET) & MANUFACTURER <br />TEMPLATES PROVIDED BY HENRY SCHEIN EQUIPMENT REP. IN THE CASE OF DUAL <br />TRUNK LINE SYSTEM, PROVIDE ENOUGH SPACE BETWEEN STUB-UPS TO INSTALL <br />BYPASS OR TANDEM COMPONENTS. <br />2. TRUNK LINE(S) <br />DO NOT PIPE TRUNK LINE IN A SERIES MANNER FROM J-BOX TO J-BOX. A <br />CONTINUOUS TRUNK LINE MUST BE MAINTAINED FROM THE PUMP TO THE FURTHEST <br />J-BOX USING BRANCH LINES OFF OF THE TRUNK LINE TO PICK UP EACH VACUUM <br />OUTLET. TRUNK LINE MAY FOLLOW DRAIN LINE TRENCHES WITHIN REASON. <br />3. BRANCH LINE(S) <br />BRANCH LINES ARE TO HAVE "SWEEPING" 90 DEGREE TURNS TO AVOID VACUUM <br />LOSS. "WYE" FITTINGS SHOULD BE USED TO JOIN BRANCH LINES TO THE TRUNK <br />LINE. <br />4. PLUMBING AROUND FOOTINGS: <br />IF VACUUM LINES ENCROACH ON EITHER A WALL OR COLUMN FOOTING, USE 45 <br />DEGREE ELBOWS TO PIPE AROUND FOOTING TO FINAL LOCATION. DO NOT PIPE <br />UNDER FOOTINGS. <br />TURNS/INTERSECTIONS) <br />VACUUM NOTES <br />DWV WYE <br />45° ELBOW <br />DWV OFFSET WYE <br />DWV LONG <br />SWEEP ELBOW <br />FLOW <br />TO <br />PUMP <br />FLOW <br />TO <br />PUMP <br />DWV 45° ELBOWS <br />REDUCER BUSHING <br />TRUNK LINE <br />BRANCH LINE <br />STUB-UP IN TREATMENT <br />FLOW <br />VACUUM LINES MUST BE SUPPORTED <br />EVERY 6'-0" TO PREVENT SAGGING. <br />ENTIRE SYSTEM MUST MAINTAIN A <br />MINIMUM OF 1/4" PER 10'-0" TOWARD <br />THE VACUUM PUMP. <br />DO NOT USE ANY 90° SHORT ELBOWS <br />SCH 40 PVC TURNS/ <br />INTERSECTIONS ARE TO BE PLUMBED <br />USING ALLOWED DWV FITTINGS. DO <br />NOT CREATE TRAPS IN TRUNK/BRANCH <br />LINES. <br />Scale <br />Date <br />Drawn By <br />Checked By <br />Project Number <br />REVISIONS <br />JOB SITE: <br />PLAN: <br />PHONE: <br />PLAN CHECK / JOB NO. <br />50 S DE LACEY AVE. STE. 210 <br />Pasadena, CA 91105 <br />THESE PLANS ARE FOR REVIEW ONLY AND NOT FOR CONSTRUCTION UNLESS THEY <br />INCLUDE THE STAMP AND SIGNATURE OF ARCHITECT/ENGINEER AND THE <br />APPROVAL OF THE APPROPRIATE GOVERNMENT AGENCY <br />C-38176 <br />MARC A. <br />ABDELSAYED <br />RENEWAL <br />DATE <br />LICENSED A R CHITECT <br />STATE OF C ALIFORNIA <br />07/31/2025 <br />369 <br />ARCHITECTS <br />As Noted <br />CA <br />N <br />A <br />M <br /> <br />D <br />E <br />N <br />T <br />A <br />L <br /> <br />- <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />MARS <br />NASRIN.P. <br />07/29/2024 <br />MISC._24065 <br />No.Description Date <br />1414 W. EDINGER AVE, <br />SANTA ANA, CA. 92704 <br />.PERMIT 09/04/2024 <br />09 <br />/ <br />0 <br />4 <br />/ <br />2 <br />0 <br />2 <br />4 <br />_ <br />G <br />C <br /> <br />C <br />o <br />m <br />m <br />e <br />n <br />t <br />1 P.C.COMMENTS 02/01/2025 <br />P-5.0 <br />PLUMBING DETAILS