Laserfiche WebLink
Romex (NM Cable) may be run <br />in the attic when origination and <br />termination is made within <br />NEMA 3R junction boxes. <br />MAS(19) <br />New Service Meter Panel must have <br />underground (Lateral) future ability per <br />SAMC. Some models require a "tunnel <br />kit" for this purpose. <br />This service panel is shown to have a <br />PV line-side connection with a 100A <br />Main and 100A loads bus. <br />MAS(19) <br />1314 N McLean Dr <br />2/9/2024