My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1312 E Warner Ave - Plan
PBA
>
Building
>
ProjectDox
>
W
>
Warner Ave
>
1312 E Warner Ave
>
1312 E Warner Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 1:22:47 PM
Creation date
6/6/2025 1:22:23 PM
Metadata
Fields
Template:
Plan
Permit Number
20181504
Full Address
1312 E Warner Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Tesla, Inc. <br />3500 Deer Creek Road <br />Palo Alto, CA 94304, U.S.A. <br />February 12th, 2024 <br />Subject: Tesla Megapack Augmentation <br /> <br />To whom it may concern, <br /> <br />Tesla energy products: Megapack 1 Battery Energy Storage System, BESS (Model #: <br />1462965*), Megapack 2 BESS (Model #: 1748844*), Megapack 2XL BESS (Model #: <br />1848844*) and Powerpack 3 BESS (Model #: 1930712*) have been evaluated to the UL <br />1741:2021, ANSI/CAN/UL 9540:2020 and ANSI/CAN/UL 9540A:2019 product safety <br />standards. <br /> <br />The power supply used with our Powerpack 3 BESS is certified and being documented in the <br />product construction report. TUV Rheinland of North America, Inc., an OSHA's Nationally <br />Recognized Testing Laboratory (NRTL), has issued us a positive Statement of Opinion based <br />on the test report no. US23Q4JP.001. <br /> <br />Tesla’s commitment to product safety informs every design decision and has guided 15+ <br />years of experience in battery system designing and manufacturing of our electrical vehicles <br />and energy storage products. Tesla’s approach to product safety involves comprehensive <br />design and tests to cover the entire product lifecycle, the cell, the battery module, the <br />inverter, the thermal system, and the overall system-level assemblies which are closely <br />linked and worked together. <br /> <br />The safety of the electrical connections between the Megapacks, the Powerpacks, and the <br />external power supplies will be ensured in the installation site, which is to be done by the <br />Tesla trained and qualified personnels according to the specified installation instructions. <br /> <br />Products must be installed and operated with reference to the instructions in the Product <br />Manual. <br /> <br />*Model number may be preceded by further alphanumeric character(s) <br /> <br /> <br /> <br />___________________________________________ <br />Viraj Andrabadu K. P. <br />Sr. Manager, Compliance Engineering <br />vandrabadukurundu@tesla.com <br />1312 E Warner Ave - <br />101117461 & 201815044/29/2024
The URL can be used to link to this page
Your browser does not support the video tag.