Laserfiche WebLink
STRUCTURAL CRITERIA FOR RESIDENTIAL FLUSH-MOUNTED SOLAR ARRAYS <br />1.ROOF CHECKS <br />A. Visual Review/Contractor’s Site Audit of Existing Conditions: <br />1)Is the roof a single roof without a reroof overlay? Y N <br />2)Does the roof structure appear structurally sound, without signs of alterations <br />or significant structural deterioration or sagging, as illustrated in Figure 1? Y N <br />B. Roof Structure Data: <br />1) Measured roof slope (e.g. 6:12):________:12 <br />2) Measured rafter spacing (center-to-center):_______ inch <br />3) Type of roof framing (rafter or manufactured truss): Rafter Truss <br />2.SOLAR ARRAY CHECKS <br />A. Flush-mounted Solar Array: <br />1)Is the plane of the modules (panels) parallel to the plane of the roof? Y N <br />2)Is there a 2” to 10” gap between underside of module and the roof surface? Y N <br />3)Modules do not overhang any roof edges (ridges, hops, gable ends, eaves)? Y N <br />B. Do the modules plus support componenets weigh no more than: <br /> 4 psf for photovoltaic arrays or 5 psf for solar thermal arrays? Y N <br />C. Does the array cover no more than half of the toal roof area (all roof planes)? Y N <br />D. Are solar support component manufacturer’s project-specific completed worksheets, <br />tables with relevant cells circled, or web-based calculator results attached? Y N <br />E. Is a roof plan of the module and anchor layout attached? (see Figure 2) Y N <br />F. Downward Load Check (Anchor Layout Check): <br />1)Proposed anchor horizontal spacing (see Figure 2):____’ - ____”ft-in <br />2)Horizontal anchor spacing per Table 1:____’ - ____”ft-in <br />3)Is proposed anchor horizontal spacing less than Table 1 spacing? Y N <br />G. Wind Uplift Check (Anchor Fastener Check): <br />1)Anchor fastener data (see Figure 3): <br />a.Diameter of lag screw, hanger bolt or self-drilling screw:_______ inch <br />b.Embedment depth of rafter:_______ inch <br />c.Number of screws per anchor (typically one):_______ <br />d.Are 5/16” diameter lag screws with 2.5” embedment into the rafter <br />used, OR does the anchor fastener meet the manufacturer’s guidelines? Y N <br />3.SUMMARY <br /> A. All items above are checked YES. No additional calculations are required. <br /> B. One or more items are checked NO. Attach project-specific drawings and calculations stamped and signed by a <br />California-licensed Civil or Structural Engineer. <br />Job Address: ___________________________________________ Permit #: ________________________ <br />Contractor/Installer: _____________________________________ License # & Class: _________________ <br />Signature: ____________________________ Date: ____________ Phone #: ________________________ <br />Optional Additional Rafter Span Check Criteria <br />[ At option of CBO, insert rows (4) to (7) below into table above after row 1.B.(3) ] <br />1.ROOF CHECKS <br />B. Roof Structure Data: <br />4)Measured rafter size (e.g. 13/4 x 33/4, not 2x4):____ x ____ inch <br />5)Measured rafter horizontal span (see Figure 4):____’ - ____”ft-in <br />6)Horizontal rafter span per Table 2:____’ - ____”ft-in <br />7)Is measured horizontal rafter span less than Table 2 span? Y N Truss <br />(Jurisdictions may delete “Optional Additional Rafter Span Check” at bottom of this page, or incorporate into main list of Structural Criteria above) <br />1206 W 18th St <br />09/18/23