My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2529 N Valencia St - Plan
PBA
>
Building
>
ProjectDox
>
V
>
Valencia St
>
2529 N Valencia St
>
2529 N Valencia St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 1:23:14 PM
Creation date
6/6/2025 1:22:47 PM
Metadata
Fields
Template:
Plan
Permit Number
20179483
20179889
101114904
101116798
Full Address
2529 N Valencia St
Document Relationships
101114904 - Permit
(Permit - Plan)
Path:
\Building\Permits\V\Valencia St\2529 N Valencia St
101116798 - Permit
(Permit - Plan)
Path:
\Building\Permits\V\Valencia St\2529 N Valencia St
20179483 - Permit
(Permit - Plan)
Path:
\Building\Permits\V\Valencia St\2529 N Valencia St
20179889 - Permit
(Permit - Plan)
Path:
\Building\Permits\V\Valencia St\2529 N Valencia St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Name: <br />Zetulio Jimenez <br />Property address: <br />2529 Valencia St N, <br />Santa Ana, CA 92706 <br />APN:39642203 <br />DATE:04/07/2023 <br />CONTRACTOR <br />Vibe Solar <br />Lic #: 1036012 <br />Lic class: C-10 <br />Address: 1206 Commerce Center Dr <br />#103 Lancaster, CA 93534 <br />Phone number: (661) 485-5000 <br />E-mail: xiomara@vibesolar.com <br />VICINITY MAP <br />SCALE: NTS <br />PV SOLAR SYSTEM DETAILS <br />ELECTRICAL INFORMATION: <br />EXISTING <br />MAIN SERVICE PANEL BUS SIZE: A <br />MAIN SERVICE BREAKER : A <br />MOUNTING SYSTEM: <br />BUILDING INFORMATION: <br />CONSTRUCTION TYPE: V-B <br />OCCUPANCY: R3 <br />ROOF: <br />SYSTEM SIZE: DC STC: <br />SYSTEM SIZE: AC CEC: <br />SOLAR MODULES: ( ) <br />SATELLITE VIEW <br />SCALE: NTS <br />MAIN <br />3. ALL METALLIC EQUIPMENT SHALL BE GROUNDED <br />4. CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS PRIOR TO <br />INSTALLATION AND SHALL COORDINATE ALL INSPECTIONS, TESTING <br />COMMISSIONING AND ACCEPTANCE WITH THE CLIENT, <br />UTILITY CO. AND CITY INSPECTORS AS NEEDED. <br />5. THE ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF <br />SERVICE POINTS AND SERVICE SIZES WITH THE SERVING UTILITY COMPANY <br />AND COMPLY WITH ALL UTILITY COMPANIES REQUIREMENTS. <br />6. DRAWINGS ARE DIAGRAMMATIC ONLY, ROUTING OF RACEWAYS SHALL <br />BE OPTION OF THE CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL <br />BE COORDINATED WITH OTHER TRADES. <br />7. IF THE ROOF MATERIAL OR ROOF STRUCTURE NOT ADEQUATE FOR PV <br />INSTALLATION, CALL ENGINEER PRIOR TO INSTALL. THE CONTRACTOR IS <br />RESPONSIBLE TO VERIFY THAT THE ROOF IS CAPABLE OF WITHSTANDING <br />THE EXTRA WEIGHT. <br />8. IF THE DISTANCES FOR CABLE RUNS ARE DIFFERENT THAN SHOWN, THE <br />CONTRACTOR SHALL NOTIFY THE ELECTRICAL ENGINEER TO VALIDATE THE <br />WIRE SIZE. FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS <br />APPROPRIATE. <br />9. WHENEVER A DISCREPANCY IN QUALITY OF EQUIPMENT ARISES ON THE <br />DRAWING OR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REQUIRED <br />BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN THE <br />SPECIFICATIONS TO ENSURE COMPLETE COMPLIANCE AND LONGEVITY OF <br />THE OPERABLE SYSTEM REQUIRED BY THE ARCHITECT/ENGINEERS. <br />10. ALL BROCHURES, OPERATION MANUALS, CATALOGS, SHOP DRAWINGS, <br />ETC. SHALL BE HANDED OVER TO OWNER'S REPRESENTATIVE AT THE <br />COMPLETION OF WORK <br />PHOTOVOLTAIC NOTES: <br />1. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES SHALL <br />BE TESTED, LISTED AND IDENTIFIED BY RECOGNIZED ELECTRICAL <br />TESTING LABORATORY <br />2. SOLAR SYSTEM SHALL NOT COVER ANY PLUMBING OR MECHANICAL <br />VENTS <br />3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED. <br />5. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL <br />NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE GROUNDING <br />ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE AND/OR <br />OUTPUT CIRCUIT GROUNDED CONDUCTORS. <br />4. SOLAR INVERTER SHALL BE LISTED TO UL1741. <br />6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND <br />WIRING SHALL BE PROTECTED FROM PHYSICAL DAMAGE. <br />7. LIVE PARTS OF PV SOURCE CIRCUITS AND PV OUTPUT <br />CIRCUITS OVER 150V TO GROUND SHALL NOT BE <br />ACCESSIBLE TO OTHER THAN QUALIFIED PERSONS WHILE <br />ENERGIZED. <br />8. INVERTER IS EQUIPED WITH INTEGRATED GFDI, THUS <br />PROVIDING GROUND FAULT PROTECTION <br />9. ALL CONDUCTORS SHALL BE COPPER AND 90 DEG <br />RATED <br />10. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A <br />RECOGNIZED ELECTRICAL TESTING LABORATORY. <br />11. A SINGLE CONDUCTOR SHALL BE PERMITTED TO BE <br />USED TO PERFORM THE MULTIPLE FUNCTIONS OF DC <br />GROUNDING, AC GROUNDING AND BONDING BETWEEN <br />AC AND DC SYSTEMS. <br />12. NON-CURRENT CARRYING METAL PARTS OF <br />EQUIPMENT SHALL BE EFFECTIVELY BONDED TOGETHER. <br />BOND BOTH ENDS OF RACEWAYS. <br />GENERAL NOTES <br />1. ALL ELECTRICAL MATERIALS SHALL BE NEW AND LISTED BY RECOGNIZED <br />ELECTRICAL TESTING LABORATORY <br />CUSTOM MADE EQUIPMENT SHALL HAVE COMPLETE TEST DATA SUBMITTED <br />BY THE MANUFACTURER ATTESTING TO ITS SAFETY <br />2. OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED OR BETTER <br />19 <br />: 2 X 4 @ 24" O.C. <br />COMP SHINGLE <br />INVERTERS: ( ) <br />ROOF PLAN <br />SINGLE LINE DIAGRAM <br /> ATTACHMENT LAYOUT <br />SIGNAGE <br />RSD DATA SHEET <br />INVERTER DATA SHEET <br />1 <br />INDEX <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />SITE PLAN <br />MODULE DATA SHEET <br />RACKING DATA SHEET <br />ATTACHMENT DATA SHEET11 <br />ECB DATA SHEET <br />THE INSTALLATION OF SOLAR ARRAYS AND <br />PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH <br />THE FOLLOWING CODES: <br />2020 National Electrical Code <br />2022 California Building Code <br />2022 California Residential Code <br />2022 California Green Building Standard Code <br />2022 California Plumbing Code <br />2022 California Mechanical Code <br />2022 California Electrical Code <br />2022 California Fire Code <br />2022 California Energy Code <br />2016 International Property Maintenance Code <br />ALL OTHER ORDINANCE ADOPTED BY THE LOCAL <br />GOVERNING AGENCIES <br />12 <br />13 RACKING CLASSIFICATION <br />MONITORING PAGE <br />19 <br />7.60 KW <br />6.91 KW <br />225 <br />200 <br />TRUSS <br />Hanwha 400 watt <br />Enphase IQ8+ Microinverters <br />IRONRIDGE <br />Date Certified and <br />Exp. Date : 3/31/2024 <br />Signed: 05/02/2023 <br />Engineerinc.io, <br />303 N Glenoaks Blvd <br />Burbank, CA 91502 <br />(747)333-5991 <br />Professional Certification. I hereby certify that these documents <br />were prepared or approved by me, and that I am a duly licensed <br />professional engineer under the laws of the State of California. <br />License No. ____________, Expiration Date: _______________ 88083 03/31/2024 <br />PV-0 <br />Cover <br />Page <br />The scope of the plans is for the installation of the solar photovoltaic <br />system only and the approval is subject to compliance with all <br />applicable city and state codes and regulations regarding construction. <br />The approval of the plans does not constitute any certification of the <br />accuracy, completeness, or building permit status of the existing <br />buildings and structures as shown. <br />REVISED <br />20179483 <br />Issued 05/30/23 <br />20179889 <br />Issued 06/13/23 <br />2529 N Valencia St <br />06/13/23
The URL can be used to link to this page
Your browser does not support the video tag.