Laserfiche WebLink
RO <br />OF <br />TO <br />P <br />GRO <br />U <br />N <br />D LE <br />V <br />E <br />L <br /> <br />- <br />HO <br />U <br />S <br />E <br /> <br />EX <br />T <br />E <br />R <br />I <br />OR <br />20A <br />20A <br />N <br />2 (N) JUNCTION BOX <br />WITH IRREVERSIBLE <br />GROUND SPLICE <br />NOTE: IN BETWEEN EACH ARRAY THE EMT IS USED AS THE <br />GROUNDING / BONDING, GROUND CLAMPS ARE AT EACH <br />END OF THE EMT CONDUIT WITH THE WIRE THEN FREE <br />AIR'D TO THE GROUND CLAMP ON THE RACKING RAIL <br />(N) 100A PV LOAD <br />CENTER <br />M <br />POINT OF <br /> DELIVERY AND <br />INTERCONNECTION <br />100A <br />100A <br />N <br />3 (E) GROUNDING <br />ELECTRODE OR <br />(UFER) <br />(N) VISIBLE <br />LOCKABLE <br />2 POLE 30A <br />'KNIFE' AC <br />DISCONNECT <br />4 <br />AC <br />DISCONNECT <br />TO BE LOCATED <br />WITHIN 10' OF <br />METER <br />EXISTING <br />240V/100A <br />MAIN SERVICE PANEL <br />SINGLE PHASE <br />12 5 6 <br />PV CIRCUIT 1: 6 MODULES/PARALLEL [ (3) AP SYSTEMS DS3-L 2 IN 1] <br />1 <br />12 3 4 <br />PV CIRCUIT 2: 5 MODULES/PARALLEL [ (3) AP SYSTEMS DS3-L 2 IN 1] <br />15 <br />(N) (11 ) SOLAREVER SE-166*83-455M-144(455W) MODULES <br /> WITH (6) AP SYSTEM DS3-L 2 IN 1 MICRO-INVERTERS <br />ATTACHED TO THE BACK OF MODULES . <br />3 <br />30A <br />BACKFEED <br />BREAKER <br />ALL EXISTING LOADS <br />RELOCATE FROM MAIN <br />SERVICE PANEL TO NEW <br />SUB SERVICE PANEL <br />(N) 240V/125A <br />SUB SERVICE PANEL <br />SINGLE PHASE <br />N <br />SHEET <br />CONTRACTOR <br />SOLGEN CONSTRUCTION LLC. <br />1703 W 12TH ST, <br /> SANTA ANA, <br /> CA 92703 <br />APN:40515143 <br />DATE:12/14/2022 <br /> RUIZ <br />RESIDENCE <br />License#: C-10 1053344 <br />ADDRESS: 2072 N MAIN ST <br /> FL 2, LOGAN <br /> UT 84341-1993 <br /> CSLB#: 1053344 <br />DESIGNER: OKB <br />CORE ENERGY GROUP. <br />E-1 <br />Conduit and Conductor Schedule(75° Copper Column) <br />Tag Description Wire Gauge # of Conductors Conduit Type Conduit Size <br />1 PV WIRES 10 AWG 2 N/A - Free Air N/A - Free Air <br />1 Bare Copper Ground (EGC/GEC) 6 AWG 1 N/A - Free Air N/A - Free Air <br />2 THWN-2 10 AWG 4 EMT 3/4" <br />2 THWN-2 - Ground 8 AWG 1 EMT 3/4" <br />METER # 222013165071 <br />Inverter Ratings <br />Inverter Make/Model AP SYSTEM DS3-L <br />Max DC Volt Rating 60V <br />Max Continuous Output <br />Power 768W <br />Max Nominal Voltage 240V <br />Max AC Current 3.20A <br />Max OCPD Rating 20A <br />DESIGN TEMPERATURES <br />ASHRAE EXTREME LOW 2°C <br />ASHRAE 2% HIGH 31 °C <br />PV Module Ratings @ STC <br />Module Make/Model <br />SOLAREVER <br />SE-166*83-455M-144(455W) <br />MODULE <br />Max Power-Point Current (Imp)10.96A <br />Max Power-Point Voltage (Vmp)41.51 V <br />Open-Circuit Voltage (Voc)49.35V <br />Short-Circuit Current (Isc)11.41 A <br />Max Series Fuse (OCPD)20A <br />Nominal Maximum Power at STC <br />(Pmax)455W <br />Maximum System Voltage 1500V <br />Voc Temperature Coefficient -0.29%/°C <br />SYSTEM SUMMARY <br />BRANCH #1 <br />INVERTERS PER BRANCH 3 <br />MAX AC CURRENT 9.6A <br />MAX AC OUTPUT POWER 2304W <br />ARRAY STC POWER 5005W <br />ARRAY PTC POWER 4671.7W <br />MAX AC CURRENT 19.20A <br />MAX AC POWER <br />DERATED (CEC) AC POWER 4508.19W <br />BRANCH #2 <br />3 <br />9.6A <br />2304W <br />4608W <br />NOTE:TOTAL AMPERAGE RATING OF <br />ALL OVERCURRENT DEVICES SUMMED <br />UP IN THE MAIN PANEL EXCLUDING <br />MAIN SUPPLY OVERCURRENT DEVICE, <br />SHALL NOT EXCEED AMPACITY OF BUS <br />BAR NEC 2017 705.12(D)(2)(3)(c) <br />SUB SERVICE PANEL <br />240/120V 1Ø, 3W <br />MAIN BUSS: 125A <br />MAX BREAKER SIZE: <br />(125A X 1.2) - 100A = 50A <br />3 THWN-2 10 AWG 3 EMT 3/4" <br />3 THWN-2 - Ground 8 AWG 1 EMT 3/4" <br />4 THWN-2 3 AWG 3 EMT 1-1/4" <br />4 THWN-2 - Ground 6 AWG 1 EMT 1-1/4" <br />1703 W 12th St <br />02/22/23