My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1838 W 19th St - Plan
PBA
>
Building
>
ProjectDox
>
N
>
Nineteenth St
>
1838 W Nineteenth St
>
1838 W 19th St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 1:23:49 PM
Creation date
6/6/2025 1:23:09 PM
Metadata
Fields
Template:
Plan
Permit Number
20177891
20178448
101112679
101113497
Full Address
1838 W Nineteenth St
Document Relationships
101112679 - Permit
(Permit - Plan)
Path:
\Building\Permits\N\Nineteenth St\1838 W Nineteenth St
101113497 - Permit
(Permit - Plan)
Path:
\Building\Permits\N\Nineteenth St\1838 W Nineteenth St
20177891 - Permit
(Permit - Plan)
Path:
\Building\Permits\N\Nineteenth St\1838 W Nineteenth St
20178448 - Permit
(Permit - Plan)
Path:
\Building\Permits\N\Nineteenth St\1838 W Nineteenth St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FASTER INSTALLATION. 25-YEAR WARRANTY. <br />FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702 <br />FLASH LOC <br />INSTALLATION GUIDE <br />STEP 1: SECURE <br />Place FLASHLOC over pilot hole with lag on down-slope side. Align indicator marks on sides of <br />mount with chalk line. Pass included lag bolt and sealing washer through FLASHLOC into pilot <br />hole. Drive lag bolt until mount is held firmly in place. <br />NOTE: The EPDM in the sealing washer will expand beyond the edge of the metal washer when <br />proper torque is applied. <br />PRE-INSTALL <br />Snap chalk lines for attachment rows. On shingle roofs, snap lines 1-3/4” below upslope edge <br />of shingle course. Locate rafters and mark attachment locations. <br />At each location, drill a 7/32” pilot hole. Clean roof surface of dirt, debris, snow, and ice. <br />Next, BACKFILL ALL PILOT HOLES WITH SEALANT. <br />NOTE: Space mounts per racking system install specifications. <br />STEP 2: SEAL <br />Insert tip of UNIRAC provided sealant into port. Inject until sealant exits both vents. <br />Continue array installation, attaching rails to mounts with provided T-bolts. <br />NOTE: When FLASHLOC is installed over gap between shingle tabs or vertical joints, <br />fill gap/joint with sealant between mount and upslope edge of shingle course. <br />NOTE: When installing included rail attachment hardware, torque nut to 30 ft/lbs. <br />USE ONLY UNIRAC APPROVED SEALANTS: Chemlink Duralink 50 (included in kit) or Chemlink M-1 <br />SEALANT <br />GAP <br />1.75" <br />1838 W 19th St <br />11/09/22
The URL can be used to link to this page
Your browser does not support the video tag.