Laserfiche WebLink
McPherson Engineering By: T.C. <br />Date: 3/1/23 <br />Gravity Loads: <br />DEMAND DECREASED BY 11.82% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 5.61% < 10% = OK! <br />Anchorage: <br />DEMAND OF 474.4LB. < CAPACITY OF 851.2LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />3/1/2023 9:19 AM <br />7 of 7 <br />©McPherson Engineering <br />1915 W 18th St <br />03/28/23