SHEET TITLE
<br />SHEET NUMBER
<br />PROJECT TITLE
<br />JOBSITE ADDRESS
<br />LUNA
<br />RESIDENCE
<br />1 0.000 DC KW
<br />9.1 95 KW CEC-AC RATING
<br />STRING INVERTER SYSTEM
<br />2045
<br />S GARNSEY ST
<br />SANTA ANA, CA
<br />92707
<br />CONTRACTOR
<br />TITAN SOLAR POWER CA INC
<br />525 W BASELINE ROAD
<br />MESA, AZ 85210
<br />(855) 729-7652
<br />WWW.TITANSOLARPOWER.COM
<br />PROJECT ID# TSP1 43470
<br />DATE DESCRIPTION
<br />REVISION
<br />DATE
<br />DRAWN09-28-22
<br />DESIGN BY: RD
<br />CAD
<br />F O R C A L I I N C .
<br />SHELLEY V CALUAG
<br />cadforcali@gmail.com
<br />323-698-4207
<br />SP: Ascend Energy
<br />PROJECT NAME
<br />A0
<br />PROJECT INFO
<br />VICINITY MAP
<br />PV NOTES
<br />VICINITY MAP
<br />PROJECT SITE
<br />OWNER: IZAR LUNA
<br />ADDRESS:2045 SOUTH GARNSEY ST
<br />SANTA ANA, CA 92707
<br />PHONE: (949) 596-6474
<br />EMAIL: Viveros2135@gmail.com
<br />APN:01512306
<br />(ORANGE COUNTY)
<br />AHJ: CITY OF SANTA ANA
<br />UTILITY: SCE
<br />AERIAL VIEW
<br />1 0.000 DC kW SOLAR PV STRING INVERTER SYSTEM - ROOF MOUNT
<br />LUNA RESIDENCE
<br />2045 SOUTH GARNSEY ST SANTA ANA, CA 92707
<br />ARRAY AREA: 21.14 SQFT x 25 = 528.39 SQFT
<br />PROJECT SCOPE
<br />INSTALLATION OF ROOF MOUNT SOLAR PV SYSTEM
<br />PV EQUIPMENT QTY MODEL NO AND MANUFACTURER
<br />MODULES: 25 Q.PEAK DUO BLK ML-G10+ 400
<br />HANWHA Q CELL MODULES
<br />OPTIMIZERS: 25 P401 SOLAREDGE OPTIMIZERS
<br />INVERTER:1 SE7600H-US (240V)
<br />SOLAREDGE HD INVERTER
<br />SYSTEM SIZE: 10.000 DC kW RATING
<br />9.195 CEC AC RATING
<br />OCCUPANCY: R3-SFD CONSTRUCTION TYPE: VB
<br /># OF STORIES: 1 BLDG AREA (SQFT):1446
<br />SPRINKLERS: NONE ROOF AREA (SQFT): 2296
<br />ENGINEERING CRITERIA FOR RACKING
<br />DESIGN WIND SPEED: 110 MPH
<br />WIND EXPOSURE CATEGORY: B
<br />GROUND SNOW LOAD: 0 PSF
<br />SOLAR PHOTOVOLTAIC SYSTEM NOTES
<br />1. ALL EQUIPMENT SHALL BE LISTED AND LABELED BY A RECOGNIZED TESTING LABORATORY AND INSTALLED PER THE
<br />LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS, CEC 110.2, 110.3, 690.4(B) AND 690.12(D).
<br />2. ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED, INCLUDING ALL ROOF MOUNTED TRANSITION BOXES AND
<br />SWITCHES.
<br />3. ALL EQUIPMENT SHALL BE PROPERLY GROUNDED AND BONDED IN ACCORDANCE WITH CEC ARTICLE 250.
<br />4. ALL PV CIRCUITS CONNECTED TO MORE THAN ONE SOURCE SHALL HAVE PROTECTION AGAINST OVERCURRENT PER
<br />CEC 690.9.
<br />5. DISCONNECTING MEANS OF THE PV SYSTEM (INCLUDING RAPID SHUTDOWN INITIATION) SHALL BE LOCATED IN
<br />READILY ACCESSIBLE LOCATION NEAR THE EQUIPMENT, CEC 690.13, 690.15.
<br />6. ENERGY STORAGE SYSTEMS TERMINALS LOCATED MORE THAN 5 FEET AWAY OR ON OPPOSITE SIDE OF WALL FROM
<br />CONNECTED EQUIPMENT MUST HAVE DISCONNECTING MEANS IN ACCORDANCE WITH CEC 706.7(E) AND LABELED
<br />PER 706.7(D). A SECOND DISCONNECTING MEANS LOCATED AT THE CONNECTED EQUIPMENT SHALL BE INSTALLED
<br />WHERE THE DISCONNECTING MEANS AT THE ESS END OF THE CIRCUIT IS NOT WITHIN SIGHT.
<br />7. RAPID SHUTDOWN EQUIPMENT TO COMPLY WITH CEC 690.12.
<br />8. THE UTILITY-INTERACTIVE INVERTERS SHALL AUTOMATICALLY DE-ENERGIZE ITS OUTPUT TO THE CONNECTED
<br />ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN THE SYSTEM AND SHALL REMAIN
<br />IN THAT STATE UNTIL THE ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED,
<br />CEC 705.40.
<br />9. ALL CONDUCTORS IN EXPOSED OUTDOOR LOCATIONS SHALL BE LISTED AND IDENTIFIED FOR USE IN DIRECT
<br />SUNLIGHT AND FOR THE APPLICATION. CEC310.10(D) AND 690.31(C) THROUGH (F).
<br />10. INSULATION OF EXPOSED CONDUCTORS UNDER THE MODULES SHALL BE USE-2 OR PV-WIRE TYPE FOR PV SYSTEMS,
<br />CEC 690.31(C).
<br />11. FINE-STRANDED CABLE CONNECTIONS MUST BE MADE IN LUGS AND TERMINALS LISTED AND MARKED FOR THE USE,
<br />CEC 110.14.
<br />12. ALL PV CIRCUIT CONDUCTORS SHALL BE MARKED ON EACH END AND GROUPED FOR UNIQUE IDENTIFICATION, CEC
<br />690.31(B).
<br />13. ALL GROUNDED, (NEUTRAL), CONDUCTORS' INSULATION SHALL BE SOLID WHITE, GRAY, OR WITH 3-WHITE STRIPES,
<br />CEC 200.6, 200.7, & 400.22; AND ALL GROUNDING CONDUCTORS SHALL BE OF BARE WIRE WITHOUT COVERING, OR
<br />WITH INSULATION OF GREEN OR GREEN WITH YELLOW STRIPES, CEC 250.119 & 400.23. THE COLOR OF UNGROUNDED
<br />CONDUCTORS SHALL BE OTHER THAN FOR GROUNDED, (NEUTRAL), AND GROUNDING CONDUCTORS, CEC 310.110(C).
<br />14. MAXIMUM CONDUCTOR LENGTH BETWEEN SUPPLY SIDE CONNECTION AND OVERCURRENT PROTECTION IS 10 FEET,
<br />CEC 705.31.
<br />15. CONNECTIONS ON THE LOAD SIDE OF THE SERVICE DISCONNECTING MEANS OF THE OTHER SOURCE(S) AT ANY
<br />DISTRIBUTION EQUIPMENT ON THE PREMISES SHALL MEET THE FOLLOWING, CEC 705.12(B).
<br />16. DC WIRING INSIDE A BUILDING MUST BE IN METALLIC TYPE RACEWAYS, CONDUITS, ENCLOSURES, OR CABLE
<br />SHEATHINGS, CEC 690.31(G).
<br />17. METALLIC TYPE RACEWAYS, CONDUITS, ENCLOSURES, AND CABLE SHEATHS CONTAINING CIRCUITS OVER 250-VOLTS
<br />TO GROUND MUST BE BONDED IN ACCORDANCE WITH CEC 250.97.
<br />18. ALL EXTERIOR CONDUIT, FITTINGS AND BOXES SHALL BE RAIN TIGHT AND APPROVED FOR USE IN WET LOCATIONS,
<br />CEC 314.15
<br />19. FLEXIBLE, FINE-STRANDED CABLES SHALL BE TERMINATED ONLY WITH TERMINALS, LUGS, DEVICES OR CONNECTOR
<br />THAT ARE IDENTIFIED AND LISTED FOR SUCH USE, CEC 690.31(H) & 110.14.
<br />20. CONNECTORS SHALL BE OF LATCHING OR LOCKING TYPE. CONNECTORS THAT ARE READILY ACCESSIBLE AND
<br />OPERATING AT OVER 30 VOLTS SHALL REQUIRE TOOL TO OPEN AND MARKED “DO NOT DISCONNECT UNDER
<br />LOAD” OR “NOT FOR CURRENT INTERRUPTING”, CEC 690.33(C) & (E)(2).
<br />21. EQUIPMENT GROUNDING CONDUCTOR FOR PV MODULES SMALLER THAN 6 AWG SHALL BE PROTECTED FROM
<br />PHYSICAL DAMAGE BY A RACEWAY OR CABLE ARMOR, CEC 690.46 & 250.120(C).
<br />22. THE INTERCONNECTION POINT SHALL BE ON THE SUPPLY SIDE OF ALL GROUND-FAULT PROTECTION EQUIPMENT, CEC
<br />705.32.
<br />23. CABLES/WIRES THAT ARE SUBJECT TO PHYSICAL DAMAGE, SUCH AS THOSE NOT LOCATED UNDER THE MODULES,
<br />MUST BE PROTECTED, CEC 300.4.
<br />24. PROPOSED LOCATIONS OF ELECTRICAL SERVICE REPLACEMENTS MUST ALSO BE APPROVED BY THE ELECTRICAL
<br />UTILITY COMPANY.
<br />25. FOR ELECTRICAL SERVICE REPLACEMENTS, BONDING TO THE METAL PIPES OF NATURAL GAS, HOT WATER, AND COLD
<br />WATER MUST BE PROVIDE, CEC 250.104.
<br />26. GROUNDING ROD ELECTRODES SHALL BE MINIMUM 5/8’’ IN DIAMETER AND INSTALLED 8’ MINIMUM IN CONTACT WITH
<br />SOIL, CEC 250.52(A)(5), 250.53(G).
<br />27. MINIMUM 7/8’’ CLEARANCE FROM ROOF TO BOTTOM OF CONDUIT OR USE A TEMPERATURE ADDER OF 33 DEGREES
<br />C. CEC 310.15(B)(3)(C)
<br />28. EXISTING PLUMBING VENTS, SKYLIGHTS, EXHAUST OUTLETS, & VENTILATIONS INTAKE AIR OPENINGS SHALL NOT BE
<br />COVERED OR BLOCKED BY THE SOLAR PHOTOVOLTAIC SYSTEM.
<br />29. EXISTING DWV PLUMBING VENT TERMINATIONS THAT ARE HORIZONTALLY LOCATED CLOSER THAN 12" FROM THE
<br />PROPOSED MODULES, MUST BE REROUTED, OR MUST BE EXTENDED A MINIMUM OF 6" ABOVE THE SURFACE OF THE
<br />MODULES, CPC 906.1.
<br />30. EXISTING B-VENT TERMINATIONS, FOR FUEL BURNING APPLIANCES, WHERE ADJACENT TO THE PROPOSED MODULES,
<br />MUST BE EXTENDED 12" ABOVE THE MODULES' TOP SURFACE, CMC 802.6.1(1) & CPC 509.6.1(1).
<br />31. THE MARKINGS, "WARNING: PHOTOVOLTAIC POWER SOURCE", FOR DC RACEWAYS AND CABLE ASSEMBLIES MUST BE
<br />AT 10' O.C.; AND BENDS, ABOVE OR BELOW PENETRATIONS OF ROOFS, CEILINGS, WALLS, OR BARRIERS, CEC
<br />690.31(G)(4).
<br />32. PV COMBINER PANELBOARDS MUST HAVE PERMANENT MARKINGS INDICATING THAT THEY ARE DEDICATED FOR PV
<br />CIRCUITS ONLY NO LOADS ARE TO BE CONNECTED.
<br />33. WORKING CLEARANCES TO BE PROVIDED AT NEW AND EXISTING ELECTRICAL EQUIPMENT, CEC 110.26.
<br />34. A LADDER MUST BE PROVIDED FOR INSPECTIONS IN ACCORDANCE WITH CAL-OSHA REGULATIONS, SECURED AND
<br />EXTENDING 3' ABOVE THE ROOF.
<br />35. ALL OF THE REQUIRED MARKINGS, SIGNS, AND LABELS MUST BE INSTALLED ON ALL EQUIPMENT PRIOR TO ANY
<br />INSPECTIONS.
<br />36. LABELS SHALL BE REFLECTIVE, AND ALL LETTERS SHALL BE CAPITALIZED AND SHALL BE A MINIMUM HEIGHT OF 3/8''
<br />IN WHITE ON A RED BACKGROUND. CEC 690.31(G)(4)
<br />37. IDENTIFICATION OF POWER SOURCE RAPID SHUTDOWN AND LABELING SHALL BE IN ACCORDANCE WITH CEC
<br />690.56(C).
<br />38. WHEN THE MAIN CIRCUIT BREAKER IS DERATED, A PERMANENT MARKING MUST BE PROVIDED ON THE PANELBOARD TO
<br />INDICATE THAT THE MAIN CIRCUIT BREAKER HAS BEEN DOWNSIZED TO _______ AMPS, DO NOT UPSIZE IT.
<br />39. PANELS AND MODULES NOT TO BE INSTALLED ON ROOF BELOW AN EMERGENCY ESCAPE AND RESCUE OPENING. CRC
<br />R324.6.2.2
<br />40. GROUND-MOUNTED PV SYSTEMS MUST HAVE A CLEAR, BRUSH-FREE AREA OF 10-FEET AND A FIRE SEPARATION
<br />DISTANCE OF 5-FEET MINIMUM TO OTHER STRUCTURES AND PROPERTY LINES, CRC R324.7 & R302.1.
<br />41. PLAN CHECK AND PERMIT FOR PV SYSTEM AND ASSOCIATED EQUIPMENT ONLY.
<br />42. ALL PROJECTS SUBJECT TO FIELD VERIFICATION FOR CODE COMPLIANCE.
<br />43. APPROVED SMOKE AND CARBON MONOXIDE ALARMS ARE REQUIRED WITHIN THE DWELLING UNIT AND SHALL
<br />BE FIELD VERIFIED EITHER THROUGH FINAL BUILDING INSPECTION. SMOKE ALARMS ARE REQUIRED TO BE
<br />INSTALLED IN ALL BEDROOMS, OUTSIDE EACH BEDROOM, AND AT LEAST ONE ON EACH FLOOR OF THE HOUSE.
<br />CARBON MONOXIDE ALARMS ARE REQUIRED OUTSIDE EACH BEDROOM AND AT LEAST ONE ON EACH FLOOR
<br />OF THE HOUSE. R31 4.1 , R31 5.1
<br />44. NOTIFY SERVING UTILITY BEFORE ACTIVATION OF PV SYSTEM.
<br />APPLICABLE CODES
<br />ALL MATERIALS, EQUIPMENT, INSTALLATION AND WORK
<br />SHALL COMPLY WITH THE FOLLOWING APPLICABLE CODES
<br />2019 CA BUILDING CODES (CBC)
<br />2019 CA RESIDENTIAL CODES (CRC)
<br />2019 CA MECHANICAL CODES (CMC)
<br />2019 CA PLUMBING CODES (CPC)
<br />2019 CA FIRE CODES (CFC)
<br />2019 CA ELECTRICAL CODES (CEC)
<br />2019 CA ENERGY CODES (CEnC)
<br />2019 CALIFORNIA GREEN BUILDING STANDARDS CODE
<br />(CALGreen)
<br />SHEET INDEX
<br />A0 PROJECT INFO, VICINITY MAP, PV NOTES
<br />A1 SITE PLAN
<br />A2 MOUNTING ROOF PLAN
<br />E1 SINGLE LINE DIAGRAM
<br />E2 ELECTRICAL CALCULATIONS
<br />E3 REQUIRED SIGNAGE
<br />E4 - E4.1 MODULE DATA SHEET & CERTIFICATION
<br />E5 - E5.1 INVERTER DATA SHEET & CERTIFICATION
<br />E6 OPTIMIZER DATA SHEET
<br />S1-S1.2 STANCHION DATA SHEET
<br />S2 RACKING DATA SHEET
<br />S3 - S3.3 RACKING ENGINEERING
<br />S4 RACKING GROUNDING
<br />S5 RACKING CERTIFICATION
<br />MAIN SERVICE PANEL INFORMATION
<br />EXISTING: YES UPGRADE: NO
<br />BUS RATING: (E)1 25A MAIN BREAKER SIZE: (E) 1 00A
<br />PHASE: 1PH MB POSITION: CENTER
<br /># OF WIRES: 3 DERATE?: NO
<br />VOLTAGE: 240V DERATE SIZE: N/A
<br />UTILITY FED: OH
<br />METER#: 22201 3-1 65308
<br />PROJECT SITE
<br />STRUCTURAL ONLY
<br />www.vincise.com
<br />S T R U C T U R A L E N G I N E E R S
<br />11.7.2022
<br />Bldg permit #101113643
<br />Elect permit #20178569
<br />Issued on 1/27/23
<br />***The scope of the plans is for the installation
<br />of the solar photovoltaic system only and the
<br />approval is subject to compliance with all
<br />applicable city and state codes and regulations
<br />regarding construction. The approval of the
<br />plans does not constitute any certification of
<br />the accuracy, completeness, or building permit
<br />status of the existing buildings and structures
<br />as shown.***
<br />2045 S Garnsey St
<br />01/30/23
|