My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2045 S Garnsey St - Plan
PBA
>
Building
>
ProjectDox
>
G
>
Garnsey St
>
2045 S Garnsey St
>
2045 S Garnsey St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2025 7:55:05 AM
Creation date
6/9/2025 7:54:30 AM
Metadata
Fields
Template:
Plan
Permit Number
20178569
101113643
101114098
Full Address
2045 S Garnsey St
Document Relationships
101113643 - Permit
(Permit - Plan)
Path:
\Building\Permits\G\Garnsey St\2045 S Garnsey St
101114098 - Permit
(Permit - Plan)
Path:
\Building\Permits\G\Garnsey St\2045 S Garnsey St
20178569 - Permit
(Permit - Plan)
Path:
\Building\Permits\G\Garnsey St\2045 S Garnsey St
Text box
ID:
1
Creator:
Import Agent
Created:
6/9/2025 7:54 AM
Modified:
5/30/2025 2:51 PM
Text:
WWW.TITANSOLARPOWER.COM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E2 <br />ELECTRICAL <br />CALCULATIONS <br />SHEET TITLE <br />SHEET NUMBER <br />PROJECT TITLE <br />JOBSITE ADDRESS <br />LUNA <br />RESIDENCE <br />1 0.000 DC KW <br />9.1 95 KW CEC-AC RATING <br />STRING INVERTER SYSTEM <br />2045 <br />S GARNSEY ST <br />SANTA ANA, CA <br />92707 <br />CONTRACTOR <br />TITAN SOLAR POWER CA INC <br />525 W BASELINE ROAD <br />MESA, AZ 85210 <br />(855) 729-7652 <br />WWW.TITANSOLARPOWER.COM <br />PROJECT ID# TSP1 43470 <br />DATE DESCRIPTION <br />REVISION <br />DATE <br />DRAWN09-28-22 <br />DESIGN BY: RD <br />CAD <br />F O R C A L I I N C . <br />SHELLEY V CALUAG <br />cadforcali@gmail.com <br />323-698-4207 <br />SP: Ascend Energy <br />PROJECT NAME <br />OPTIMIZERS SPECIFICATION <br />MAKE SOLAREDGE P401 <br />MAXIMUM INPUT DC POWER 430 <br />ABSOLUTE MAX INPUT VOLTAGE (VOC)60 VDC <br />MAX SHORT CIRCUIT CURRENT (ISC)12.5 ADC <br />MAX OUTPUT CURRENT 15 ADC <br />MAX OUTPUT VOLTAGE 60 ADC <br />INVERTER SPECIFICATION <br />INVERTER MAKE SOLAREDGE <br />INVERTER MODEL NO.SE7600H-US (240V) <br />MAX INPUT VOLTAGE 480 V <br />MAX INPUT CURRENT 20 A <br />NOMIMAL AC VOLTAGE 240 V <br />MAX AC CURRENT 32 A <br />MODULE SPECIFICATION <br />MANUFACTURER HANHWA Q CELL <br />MODEL NO.Q.PEAK DUO BLK ML-G10+ 400 <br />PEAK POWER 400W <br />RATED VOLTAGE (Vmp)37.13 V <br />RATED CURRENT (Imp)10.77 A <br />OPEN CIRCUIT VOLTAGE (Voc) 45.30 V <br />SHORT CIRCUIT CURRENT (Isc) 11.14 A <br />DC CONDUCTOR AMPACITY CALCULATIONS <br />ARRAY TO JBOX (CEC ART 310.15) <br />A EXPECTED WIRE TEMPERATURE (FREE AIR) 39 CELSIUS <br />B ADD 33°C FOR CONDUITS EXPOSED TO SUNLIGHT <br />ON OR ABOVE ROOF 72 CELSIUS <br />310.15(B)(3)(C) RACEWAYS AND CABLES EXPOSED TO SUNLIGHT ON ROOFTOPS. WHERE RACEWAYS OR CABLES ARE <br />EXPOSED TO DIRECT SUNLIGHT ON OR ABOVE ROOFTOPS, RACEWAYS OR CABLES SHALL BE INSTALLED A MINIMUM <br />DISTANCE ABOVE THE ROOF TO THE BOTTOM OF THE RACEWAY OR CABLE OF 23 MM (7∕8 IN.). <br />TEMPERATURE CORRECTION FACTOR <br />CEC TABLE 310.15 (B)(2)(A)0.91 WIRING/CONDUIT RACEWAY WILL BE EQUAL TO 7/8'' OR MORE ABOVE THE ROOFTOP PER CEC 310.15(B)(3)(c) <br />C # OF CURRENT CARRYING CONDUCTORS 4 (UP TO 8 CONDUCTORS IN ROOF MOUNTED CONDUITS EXPOSED TO SUNLIGHT) <br />D CONDUIT FILL CORRECTION 0.80 .80 (FOR 4 TO 6 CONDUCTORS IN CONDUIT) OR 1.00 (FOR 3 OR LESS CONDUCTORS IN CONDUIT) <br />CEC TABLE 310.15 (B)(3)(A) <br />E CIRCUIT CONDUCTOR SIZE #10 AWG MINIMUM #10 AWG CU, 90°C WET (USE-2, PV WIRE, THWN-2, RHW-2) <br />F CIRCUIT CONDUCTOR AMPACITY@75°35 AMPS CEC TABLE 310.15 (B)(16) <br />G REQUIRED CIRCUIT CONDUCTOR AMPACITY 15 AMPS REQUIRED CIRCUIT CONDUCTOR AMPACITY = MAXIMUM OPTIMIZER OUTPUT CURRENT (AMPS) (FROM OPTIMIZERS <br />SPECIFICATIONS) <br />H DERATED AMPACITY OF CIRCUIT CONDUCTOR 25.48 AMPS TEMPERATURE CORRECTION X CONDUIT FILL CORRECTION X CIRCUIT CONDUCTOR AMPACITY <br />CEC TABLE 310.15 (B)(2)(A) <br />NOTE: "H" MUST BE LARGER THAN "G" 25.48A > 15A = OK <br />DC CONDUCTOR AMPACITY CALCULATIONS <br />FROM JUNCTION BOX TO INVERTER <br />A AMBIENT TEMPERATURE ADJUSTMENT <br />EXPOSED CONDUIT 39 CELSIUS <br />310.15(B)(3)(C) RACEWAYS AND CABLES EXPOSED TO SUNLIGHT ON ROOFTOPS. WHERE RACEWAYS OR CABLES ARE EXPOSED <br />TO DIRECT SUNLIGHT ON OR ABOVE ROOFTOPS, RACEWAYS OR CABLES SHALL BE INSTALLED A MINIMUM DISTANCE ABOVE <br />THE ROOF TO THE BOTTOM OF THE RACEWAY OR CABLE OF 23 MM (7∕8 IN.). <br />TEMPERATURE CORRECTION FACTOR 0.91 WIRING/CONDUIT RACEWAY WILL BE EQUAL TO 7/8'' OR MORE ABOVE THE ROOFTOP PER CEC 310.15(B)(3)(c) <br /># OF CURRENT CARRYING CONDUCTORS 4 (UP TO 8 CONDUCTORS IN ROOF MOUNTED CONDUITS EXPOSED TO SUNLIGHT) <br />CONDUIT FILL CORRECTION 0.80 .80 (FOR 4 TO 6 CONDUCTORS IN CONDUIT) OR 1.00 (FOR 3 OR LESS CONDUCTORS IN CONDUIT) <br />CEC TABLE 310.15 (B)(3)(A) <br />CIRCUIT CONDUCTOR SIZE #10 AWG MINIMUM #10 AWG CU, 90°C WET (USE-2, PV WIRE, THWN-2, RHW-2) <br />CIRCUIT CONDUCTOR AMPACITY@75°35 AMPS CEC TABLE 310.15 (B)(16) <br />B REQUIRED CIRCUIT CONDUCTOR AMPACITY 15 AMPS REQUIRED CIRCUIT CONDUCTOR AMPACITY = MAXIMUM OPTIMIZER OUTPUT CURRENT (AMPS) (FROM OPTIMIZERS <br />SPECIFICATIONS) <br />C DERATED AMPACITY OF CIRCUIT CONDUCTOR 25.48 AMPS TEMPERATURE CORRECTION X CONDUIT FILL CORRECTION X CIRCUIT CONDUCTOR AMPACITY <br />CEC TABLE 310.15 (B)(2)(A) <br />NOTE: "C" MUST BE LARGER THAN "B" 25.48A > 15.00A = OK <br />AC CONDUCTOR AMPACITY CALCULATIONS <br />BETWEEN INVERTER TO MAIN ELECTRICAL PANEL <br />A AMBIENT TEMPERATURE ADJUSTMENT <br />EXPOSED CONDUIT 39 CELSIUS <br />(ADD 22° OR 4O° FOR CONDUITS EXPOSED TO SUNLIGHT ON OR ABOVE ROOF) <br />CEC TABLE 310.15 (B)(2)(A) & CEC TABLE 310.15 (B)(2)(C) <br />EXPECTED WIRE TEMPERATURE <br />TEMPERATURE CORRECTION FACTOR 0.91 CEC TABLE 310.15 (B)(2)(A) <br /># OF CURRENT CARRYING CONDUCTORS 2 (UP TO 8 CONDUCTORS IN ROOF MOUNTED CONDUITS EXPOSED TO SUNLIGHT) <br />CONDUIT FILL CORRECTION 1.00 .80 (FOR 4 TO 6 CONDUCTORS IN CONDUIT) OR 1.00 (FOR 3 OR LESS CONDUCTORS IN CONDUIT) <br />CEC TABLE 310.15 (B)(3)(A) <br />CIRCUIT CONDUCTOR SIZE #8 AWG MINIMUM #10 AWG CU, 90°C WET (USE-2, PV WIRE, THWN-2, RHW-2) <br />CIRCUIT CONDUCTOR AMPACITY @ 90° 55 AMPS CEC TABLE 310.15 (B)(16) <br />INVERTER'S MAXIMUM AC OUPUT CURRENT 32 AMPS INVERTER MANUFACTURER SPECIFICATIONS <br />B REQUIRED AC CONDUCTOR AMPACITY 40.00 AMPS REQUIRED AC CONDUCTOR AMPACITY =1.25 X MAXIMUM INVERTER'S OUTPUT CURRENT (AMPS) <br />C DERATED AMPACITY OF CIRCUIT CONDUCTORS 50.05 AMPS TEMPERATURE CORRECTION X CONDUIT FILL CORRECTION X CIRCUIT CONDUCTOR AMPACITY <br />CEC TABLE 310.15 (B)(2)(A) <br />NOTE: "C" MUST BE GREATER THAN "B" 50.05A > 40.00A = OK <br />LOCATION INFORMATION <br />SOLAR ABC ASHRAE <br />NEC TABLE 310.15 (B)(2)(a)-TEMP CORRECTION FACTORS <br />WIRE TERMINATIONS AT 75° AMPACITY <br />HIGH TEMP 39 °C <br />LOW TEMP -7 °C <br />VOLTAGE CORRECTION FACTOR -TABLE 690.7(A)1.12 <br />ROOF TEMP + 33°-IF RACEWAY CONDUIT IS LESS <br />THAN 7/8" ABOVE ROOF 72 °C <br />TEMP CORRECTION FACTOR (ABOVE ROOF)0.65 <br />TEMP CORRECTION FACTOR (INSIDE CONDUIT)0.91 <br />2045 S Garnsey St <br />01/30/23
The URL can be used to link to this page
Your browser does not support the video tag.