My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2218 S Evergreen St - Plan
PBA
>
Building
>
ProjectDox
>
E
>
Evergreen St
>
2218 S Evergreen St
>
2218 S Evergreen St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2025 8:00:17 AM
Creation date
6/9/2025 7:59:50 AM
Metadata
Fields
Template:
Plan
Permit Number
20179210
20179578
20179854
101114500
Full Address
2218 S Evergreen St
Document Relationships
101114500 - Permit
(Permit - Plan)
Path:
\Building\Permits\E\Evergreen St\2218 S Evergreen St
20179210 - Permit
(Permit - Plan)
Path:
\Building\Permits\E\Evergreen St\2218 S Evergreen St
20179578 - Permit
(Permit - Plan)
Path:
\Building\Permits\E\Evergreen St\2218 S Evergreen St
20179854 - Permit
(Permit - Plan)
Path:
\Building\Permits\E\Evergreen St\2218 S Evergreen St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MM INVACLINVAC <br />BETTER EARTH ELECTRIC INC. <br />16720 MARQUARDT AVE CERRITOS <br />CERRITOS, CA 90703 <br />PHONE #: (888) 373-9379 <br />LIC #: C10-1024460 <br />Nathan Draeger <br />DESIGNER: <br />DESIGN MGR: <br />Natalia Timoshkina <br />NEW PV SYSTEM: 4,290 DC / 3000 AC <br />Antonio Alonso <br />2218 S Evergreen St, Santa Ana, CA 92707 <br />APN: 01621218 <br />3/26/2023 <br />DATE:TIME: <br />09:03 PM <br />REVISION:DATE:DESCRIPTION: <br />DRAWING TITLE: <br />DRAWING PAGE: <br />SCALE: <br />ASBUILT 3/26/2023 UPDATED LAYOUT AND MODULE TYPE <br />3/32" = 1' <br />N <br />ARRAY 1: <br />MODULE QTY: 11 <br />TILT: 23° <br />AZIMUTH: 360° <br />MATERIAL: Comp Asphalt Shingles <br />REQUIRED ROOF ACCESS POINT PER <br />CRC 2022 SECTION R324. <br />LADDER ACCESS SHALL BE AT <br />STRONG POINT OF ROOF AND NOT <br />OVER REQUIRED WINDOW <br />OPENINGS. <br />ROOF PLAN <br />P4 <br />ROOF DETAILS:JURISDICTION STAMPS: <br /> FIRE CODE PATHWAY <br />BACKUP INTERFACE <br />BACKUP GATEWAYBG <br />BI <br />MODULE STRINGING <br />3 <br />4" EMT CONDUIT <br />OPTIMIZER <br />JB JUNCTION BOX <br />LEGEND CALLOUTS: <br />1 1 <br />4" PVC TRENCH <br />COMBO METER/MAINMM <br />UTILITY METERUM <br />MAIN SERVICE PANEL <br />PV METER <br />MSP <br />PV <br />INVERTER <br />SUB PANEL <br />INV <br />SUB <br />AC DISCONNECT <br />AC COMBINER PANELACL <br />AC <br />EV CHARGER <br />BATTERY BACKUP <br />EV <br />BB <br />CONDUIT RUN TO BE DETERMINED IN FIELD <br />3'-0"6'-11" <br />3' <br />- <br />0 <br />" <br />3'-6" <br />13'-11" <br />11 <br />' <br />- <br />10 <br />" <br />2218 S Evergreen <br />St04/04/23
The URL can be used to link to this page
Your browser does not support the video tag.