Laserfiche WebLink
1 EXISTING SECOND FLOOR PLAN <br />DWN <br />ONLY REFERENCE <br />A2.1 <br />EXISTING <br />SECOND <br />FLOOR PLAN <br />- <br />ONLY <br />REFERENCE <br />SHEET NUMBER <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />A <br />D <br />D <br />R <br />E <br />S <br />S <br />: <br />SHEETSOF <br />REVISIONS <br />DRAWN : <br />CHECKED : <br />DATE : <br />JOB NO. <br />MARK DATE <br />23-10273 <br />HG <br />HG <br />21 OCT 24 <br />. . <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />TITLE <br />NE <br />W <br /> <br /> <br />A <br />D <br />U <br />CO <br />N <br />C <br />O <br />R <br />D <br /> <br />R <br />E <br />S <br />I <br />D <br />E <br />N <br />C <br />E <br />Margarito Castillo, S.E. <br />22 <br />2 <br />4 <br /> <br />C <br />O <br />N <br />C <br />O <br />R <br />D <br /> <br />S <br />T <br />, <br /> <br />U <br />N <br />I <br />T <br /> <br />2 <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />CONSTRUCTION SHALL CONFORM <br />TO THE ENGINEER. ALL <br />WORK. REPORT DISCREPANCIES <br />BEFORE PROCEEDING WITH THE <br />CHECK AND VERIFY ALL DIMENSIONS <br />TO THE C.B.C. <br />PROJECT: <br />ENGINEER: <br />CASTILLO ENGINEERING <br />324 E SOUTH AVE. LONG BEACH, CA 90805 <br />T: 562-961-5600 <br />WWW.CASTILLOENGINEERING.COM <br />2224 N Concord St #2- <br />ADU4/2/2025