My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2352 N Riverside Dr - Plan
PBA
>
Building
>
ProjectDox
>
R
>
Riverside Dr
>
2352 N Riverside Dr
>
2352 N Riverside Dr - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2025 8:04:45 AM
Creation date
6/9/2025 8:04:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20183779
Full Address
2352 N Riverside Dr
Stamp
ID:
1
Creator:
Import Agent
Created:
6/9/2025 8:04 AM
Modified:
6/9/2025 7:34 AM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MSP <br />EDS <br />FR <br />O <br />N <br />T <br /> <br />O <br />F <br />RE <br />S <br />I <br />D <br />E <br />N <br />C <br />E <br />EX <br />I <br />S <br />T <br />I <br />N <br />G <br />HO <br />U <br />S <br />E <br />3' W <br />O <br />R <br />K <br /> <br />C <br />L <br />E <br />A <br />R <br />A <br />N <br />C <br />E <br />ESS <br />ACC <br />BLC <br />MID <br />ACD <br />ESS <br />3' W <br />O <br />R <br />K <br /> <br />C <br />L <br />E <br />A <br />R <br />A <br />N <br />C <br />E <br />E2 <br />SHEET NUMBER: <br />SE <br />M <br />P <br />E <br />R <br /> <br />S <br />O <br />L <br />A <br />R <br />I <br />S <br />18 <br />0 <br />5 <br /> <br />J <br />O <br />H <br />N <br /> <br />T <br />O <br />W <br />E <br />R <br />S <br /> <br />A <br />V <br />E <br />EL <br /> <br />C <br />A <br />J <br />O <br />N <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />0 <br />2 <br />0 <br />C- <br />1 <br />0 <br /> <br />L <br />I <br />C <br /> <br /># <br /> <br />9 <br />7 <br />8 <br />1 <br />5 <br />2 <br />Li <br />c <br />. <br /> <br />H <br />o <br />l <br />d <br />e <br />r <br /> <br />D <br />i <br />g <br />i <br />t <br />a <br />l <br />l <br />y <br /> <br />S <br />t <br />a <br />m <br />p <br />e <br />d <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />F <br />O <br />R <br />: <br />PR <br />O <br />P <br />O <br />S <br />E <br />D <br />DRAWN BY: <br />DATE: <br />(DC) kW: <br />PROJECT #: <br />Jo <br />h <br />n <br /> <br />A <br />l <br />m <br />o <br />n <br />d <br />ENERQUAL <br />6/28/2024 <br />97567 <br />12.090 <br />CH <br />R <br />I <br />S <br />T <br />O <br />P <br />H <br />E <br />R <br /> <br />W <br /> <br />R <br />O <br />S <br />A <br />S <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />6 <br />23 <br />5 <br />2 <br /> <br />N <br /> <br />R <br />I <br />V <br />E <br />R <br />S <br />I <br />D <br />E <br /> <br />D <br />R <br />PH <br />O <br />N <br />E <br /> <br />: <br /> <br />( <br />5 <br />3 <br />0 <br />) <br /> <br />8 <br />1 <br />3 <br />- <br />1 <br />7 <br />0 <br />9 <br />AP <br />N <br /> <br />: <br /> <br />0 <br />0 <br />2 <br />- <br />1 <br />3 <br />3 <br />- <br />0 <br />5 <br />12 <br />. <br />0 <br />9 <br />0 <br /> <br />k <br />W <br /> <br />D <br />C <br /> <br />P <br />V <br />10 <br /> <br />k <br />W <br />h <br /> <br />E <br />S <br />S <br />SO <br />L <br />A <br />R <br /> <br />P <br />H <br />O <br />T <br />O <br />V <br />O <br />L <br />T <br />A <br />I <br />C <br /> <br />& <br />EN <br />E <br />R <br />G <br />Y <br /> <br />S <br />T <br />O <br />R <br />A <br />G <br />E <br />SY <br />S <br />T <br />E <br />M <br /> <br />S <br />I <br />Z <br />E <br />: <br />SCALE: <br />SITE PLAN <br />N <br />3/16" = 1'-0" <br />MSP <br />LEGEND <br />(E) 200A BUS NCF <br />(E) 200A MAIN BREAKER <br />SERVICE POINT & UTILITY METERING <br />ACC <br />(N) 125A ENPHASE IQ COMBINER 5C <br />WITH ENVOY IQ, CELL MODEM, & <br />WIRELESS COMMUNICATIONS KIT <br />(N) ENPHASE IQ SYSTEM CONTROLLER 3 <br />MICRO-GRID INTERCONNECTION DEVICE <br />240V NEMA-3R <br />MID <br />(N) ESS DISCONNECT SWITCH <br />2X(N) ENPHASE IQ BATTERY 5P <br />ENERGY STORAGE SYSTEM, 240V NEMA-3RESS <br />BLC <br />(N) 125A BACKUP LOAD CENTER <br />(N) 90A MAIN BREAKER <br />31 (N) CSI SOLAR CO. CS6R-390MS-HL <br />(BLK) SOLAR MODULES EACH WITH A (N) <br />ENPHASE IQ8PLUS-72-2-US(240V) <br />MICRO-INVERTER <br />EDS <br />(N) 60A AC DISCONNECT <br />240V NEMA-3R <br />(SINGLE VISIBLE OPEN, LOCKABLE) <br />ACD <br />(E)200A BUS NCF <br />(E)200A MAIN BREAKER <br />SERVICE POINT & UTILITY METERING <br />(LOCATED ON NORTH-WEST WALL) <br />POINT OF CONNECTION <br />(N)60A VISIBLY OPEN, <br />LOCKABLE, AC DISCONNECT <br />240V NEMA-3R <br />(LOCATED ON NORTH-WEST WALL) <br />ALL MODULES ARE TILTED AT 5° <br />2352 N Riverside <br />Dr1/23/2025
The URL can be used to link to this page
Your browser does not support the video tag.