Laserfiche WebLink
McPherson Engineering By: J.R. <br />Date: 7/6/23 <br />Project Info 3 <br />Gravity Loads 4 <br />Lateral Loads 5 <br />Wind Uplift Design 6 <br />Summary 7 <br />Table Of Contents <br />*Note:  This engineering report is limited to the information presented to Engineer via plans, site <br />information, photos, and written correspondence as provided by Client.  On‐site structural <br />observations and verification of site conditions are not included herein.  Engineering for <br />manufactured products such as photovoltaic modules or racking systems is excluded from this <br />report.  Please refer to the manufacturer's specifications, certifications, and pre‐engineered <br />packages for product engineering.  Installations of solar modules and related equipment must be <br />performed in accordance with manufacturer recommendations, local codes, local regulations, <br />industry best practices, and applicable safety standards.  Owner and/or Contractor shall notify <br />Engineer should any damage, deterioration, or descrepancies between current condition of the <br />structure or otherwise as this letter describes before proceding with construction.  This letter <br />applies only to regions of the structure where solar modules will be supported and the <br />supporting elements. <br />7/6/2023  12:01 PM <br />2 of 7 <br />©McPherson Engineering <br />501 S Broadway <br />07/19/23