My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5216 W Crystal Ln- DL - 101115957 & 20180389 & 101116730 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Crystal Ln
>
5216 W Crystal Ln
>
5216 W Crystal Ln- DL - 101115957 & 20180389 & 101116730 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 9:37:10 AM
Creation date
6/9/2025 8:50:38 AM
Metadata
Fields
Template:
Plan
Permit Number
20180389
101115957
101116730
Full Address
5216 W Crystal Ln
Document Relationships
101115957 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Crystal Ln\5216 W Crystal Ln
101116730 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Crystal Ln\5216 W Crystal Ln
20180389 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Crystal Ln\5216 W Crystal Ln
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Limits of Scope of Work and Liability: <br />The calculations produced are only for the roof framing supporting the proposed PV installation <br />referenced in the stamped planset and were completed according to generally recognized structural <br />analysis standards and procedures, professional engineering and design experience, opinions and <br />judgments. Existing deficiencies which are unknown or were not observable during time of inspection <br />are not included in this scope of work. This analysis is not stamped for water leakage. Prior to <br />commencement of work, the contractor shall verify the framing sizes, spacings, and spans noted in the <br />stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any <br />discrepancies prior to starting construction. Contractor shall also verify that there is no damaged framing <br />that was not addressed in stamped plans, calculations, and cert letter (where applicable) and notify the <br />Engineer of Record of any concerns prior to starting construction. <br />Page 8 of 8 <br />Kim Quoc Le <br />1760 Chicago Ave Suite J13, Riverside, CA 92507 (951) 405-1733info@currentrenewableseng.com <br />5216 W Crystal Ln <br />07/28/23
The URL can be used to link to this page
Your browser does not support the video tag.