Laserfiche WebLink
McPherson Engineering By: F.A. <br />Date: 3/6/23 <br />Gravity Loads: <br />DEMAND DECREASED BY 17.98% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 8.07% < 10% = OK! <br />Anchorage: <br />DEMAND OF 323.1LB. < CAPACITY OF 2213.1LB. = OK! <br />USE (2) 5/16IN. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/ 3.3IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />3/6/2023 11:32 AM <br />7 of 7 <br />©McPherson Engineering <br />821 N Lowell St <br />03/14/23