My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
901 W First St - Plan
PBA
>
Building
>
ProjectDox
>
F
>
First St
>
901 W First St
>
901 W First St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2025 9:04:22 AM
Creation date
6/9/2025 9:04:11 AM
Metadata
Fields
Template:
Plan
Permit Number
20182527
101118898
Full Address
901 W First St
Text box
ID:
1
Creator:
Import Agent
Created:
6/9/2025 9:04 AM
Modified:
5/30/2025 5:29 PM
Text:
901 W. First St.
ID:
2
Creator:
Import Agent
Created:
6/9/2025 9:04 AM
Modified:
5/30/2025 5:29 PM
Text:
20182527
ID:
3
Creator:
Import Agent
Created:
6/9/2025 9:04 AM
Modified:
5/30/2025 5:29 PM
Text:
5/7/24
ID:
4
Creator:
Import Agent
Created:
6/9/2025 9:04 AM
Modified:
5/30/2025 5:29 PM
Text:
Kevin Nguyen
ID:
5
Creator:
Import Agent
Created:
6/9/2025 9:04 AM
Modified:
5/30/2025 5:29 PM
Text:
goUrban Development, for CCHNC
ID:
6
Creator:
Import Agent
Created:
6/9/2025 9:04 AM
Modified:
5/30/2025 5:29 PM
Text:
714 244-0033
ID:
7
Creator:
Import Agent
Created:
6/9/2025 9:04 AM
Modified:
5/30/2025 5:29 PM
Text:
Same as above
ID:
8
Creator:
Import Agent
Created:
6/9/2025 9:04 AM
Modified:
5/30/2025 5:29 PM
Text:
knguyen@gourbandev.com
ID:
9
Creator:
Import Agent
Created:
6/9/2025 9:04 AM
Modified:
5/30/2025 5:29 PM
Text:
Relocated 7 modules in front of the pipes and placed them near the north parapet wall. Moved 2 modules from the lower middle area of the building and combined them with the 2 modules near the roof access and water valve. Relocated the perimeter setbacks from beside the parapet wall to a position near the pipes and vents in front of the PV array.
ID:
10
Creator:
Import Agent
Created:
6/9/2025 9:04 AM
Modified:
5/30/2025 5:29 PM
Text:
MSmith
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PCC-13 Rev. 06-17-2019 White-Plan Check Yellow-Applicant <br />REVISION /SUPPLEMENTAL <br />PLAN CHECK REQUEST <br />PCC-13 CBC 2022 Rev 6-17-2024 <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />Project Address: _________________________________________ Suite #_______________________________ <br />New Plan Check No.____________________________________________________________________________ <br />Original Plan Check No.:__________________________________ Permit Issuance Date:____________________ <br />Original Plan Checker: __________________________________________________________________________ <br />Amount Paid: $__________________________________________ Misc. Receipt #: ________________________ <br />Processed by: ___________________________________________ Date: ________________________________ <br />Plan Checker Approval: ___________________________________ Date: ________________________________ <br />Additional Hours:________________________________________ @ $269.90 = $ _________________________ <br />Print Name:_____________________________________________ Signature: ____________________________ <br />Representing: ________________________________________________________________________________ <br />Telephone: ( ) ____________________________________ Fax: ( ) __________________________________ <br />Contact Person: ________________________________________ Telephone: ( ) ________________________ <br />E-mail (Strongly Recommended): _________________________________________________________________ <br />PLANS PREPARED BY AN ARCHITECT OR ENGINEER MUST BE SIGNED BY THE PROFESSIONAL WHO PREPARES THEM. <br />PLEASE WRITE A BRIEF DESCRIPTION OF THE REVISION/SUPPLEMENT AND IF POSSIBLE AREA OF WORK. <br />ALL REVISIONS ARE TO BE CLOUDED AND PROPERLY IDENTIFIED: (i.e. Deltas,Sheet Numbers, etc.). <br />Electrical, Plumbing and/or Mechanical plans – stamped job set shall accompany revised plans. <br />______________________________________________________________________________________ <br />______________________________________________________________________________________ <br />______________________________________________________________________________________ <br />______________________________________________________________________________________ <br />______________________________________________________________________________________ <br />901 W First St <br />10/7/2024
The URL can be used to link to this page
Your browser does not support the video tag.