Laserfiche WebLink
1FIXTURE SCHEDULE4DESIGN NOTESCONSTRUCTION NOTES:2PIPE MATERIAL SCHEDULE····GENERAL NOTESCOLD & HOT WATER PLAN∅∅3WATER HEATER DETAIL24"x48"24"x48"24"x48"LOCKER54" REFRIGERATOR54" REFRIGERATOR54" FREEZER60" WORK TABLE60" WORK TABLE24"x48"60" WORK TABLEexisting 2"cw abv ceiling2FUHS.23FUMS22FU3CS22FUPS22FUHS21FUEXPRESSO11FUICE MAKER12.5FUWC31FULAV21FULAV22.5FUWC31/2"HW(2FU) <br />1/2"CW(4FU)1/2"HW(2FU)3/4"CW(7FU)1/2"CW (1FU) <br />WM <br />3/4"HW(6FU) <br />3/4"CW(8FU) <br />1/2"CW(3.5FU) <br />1/2"HW(1FU) <br />3/4"CW(10FU) <br />3/4"HW(8FU)1"CW(20FU)3/4"HW(14FU)COLD & HOT WATER PLAN <br />P-11139 S DIAMOND BAR BLVD #G,DIAMOND BAR, CA 91765PHONE: (626)399-2555SHAWN.SQDS@GMAIL.COMREV# DESCRIPTION DATEPRELIMINARYPLAN CHECKBIDAS-BUILTGRID COFFEESHEETJOB24-65DRAWN BYK.X.SCALESEE PLANDATE06.06.2024CLIENT: <br />GRID COFFEE SEAL:3380 S. BRISTOL ST, <br />SANTA ANA, CA 92704 <br />3380 S. BRISTOL ST, <br />SANTA ANA, CA 92704 3380 S Bristol St1/8/2025