My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3380 S Bristol St - Plan
PBA
>
Building
>
ProjectDox
>
B
>
Bristol St
>
3380 S Bristol St
>
3380 S Bristol St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 8:51:11 AM
Creation date
6/10/2025 8:51:01 AM
Metadata
Fields
Template:
Plan
Permit Number
20183806
30147681
Full Address
3380 S Bristol St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Establishment NameGRID COFFEE Inspection Date12/17/2024 <br />Establishment Address3380 S BRISTOL ST SANTA ANA CA 92704 Permit NumberSR155370 <br />Iterative - ViolationsGeneral Inspection Comments: <br />Thank you for your plan submittal. Your plans are now approved and subject to the following conditions: <br />1. This approval does not constitute authority to violate any provision of the related codes, ordinances, or regulations, nor does it prevent further <br />correction of errors found on the plan or with installation upon field inspection. All construction must conform to these approved plans. Alterations <br />or changes to these plans must have review and written approval by the Plan Check Section of Environmental Health prior to construction. <br />2. All construction work must conform to local building codes and have the necessary approvals from the local building and fire authorities. Please <br />refer to the local building department for plan approval and permits prior to construction. <br />3. All retail food facilities must be connected to an approved potable water supply. Please check the following link to ensure your food facility is <br />connected to an approved water district or municipal water source: http://www.ocgov.com/about/infooc/links/oc/water. If the food facility is not <br />supplied by a municipal source, and is supplied by a private well, you must immediately submit to Orange County Environmental Health required <br />written verification that the water source meets the standards of the California Safe Drinking Water Act and is acceptable for a retail food <br />establishment. <br />4. This plan approval is valid for a period of one year from the date of approval. <br />5. Newly constructed food facilities or new portions of existing food facilities shall not be placed into use without prior written approval by a <br />member of this agency. Doing so may result in a penalty not to exceed three (3) times the cost of the annual permit. <br />6. For construction projects resulting in ownership changes or new facility classification, it is the responsibility of the owner or owner's <br />representative to submit the completed Health Permit Application, supporting ownership documents, and pay the first annual health permit fee no <br />later than one week prior to scheduling the final health inspection. Payment of the health permit fee does not constitute plan approval or approval <br />to operate. A final on-site inspection and approval, with a plan checker sign-off, are required to operate and obtain a permit. You may submit your <br />application, ownership documents and pay the fee in person 10am- 4:00pm Monday through Friday, or by mail: <br />Orange County Environmental Health <br />1241 E. Dyer Road, Suite 100 <br />Santa Ana, CA 92705 <br />Acceptable forms of payment in person: cash, check, credit card, or money order <br />Acceptable forms of payment by mail: check or money order <br />Make checks payable to County of Orange. Health permit fees are non-refundable and non-transferable. See reverse of the Health Permit <br />Application for further instruction. <br />7. For revisions submitted after plan approval, billing will be at an hourly rate of $133.00, or fraction thereof. <br />8. Please note, inspection count greater than three is charged at an hourly rate of $133.00 and portion thereof. <br />9. Note that a health permit from the OC Health Care Agency (HCA)'s Environmental Health Division (EH) will not be issued without a City <br />Building Department, Orange County Public Works, or Division of the State Architect final. HCA-EH does not provide approvals to other agencies, <br />it is the plan submitter's responsibility to provide HCA-EH-stamped approved sets of plans to City Building Departments or any other local <br />authorities if required. It is also the plan submitter's responsibility to submit revisions to HCA-EH if any changes are made to approved plans. The <br />contractor, project manager, or plan submitter must also ensure that HCA-EH stamped approved plans are always available on the job site at all <br />times during construction. <br />INSPECTION SCHEDULING <br />When work on the project has progressed to the point of requiring an inspection, please contact us at least ten (10) working days in advance in <br />order to help us accommodate your request. A preliminary inspection shall be done when the floors, walls, and ceiling finishes are complete and <br />the equipment is in place. A final inspection will be needed in order to receive Health Permit approval from this Agency. Health permit approval is <br />required prior to opening the food facility or storing food or beverages. <br />3380 S Bristol St <br />1/8/2025
The URL can be used to link to this page
Your browser does not support the video tag.