My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1334 S Olive St - Plan
PBA
>
Building
>
ProjectDox
>
O
>
Olive St
>
1334 S Olive St
>
1334 S Olive St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2025 12:20:10 PM
Creation date
6/15/2025 12:19:53 PM
Metadata
Fields
Template:
Plan
Permit Number
20177846
101112627
Full Address
1334 S Olive St
Document Relationships
101112627 - Permit
(Permit - Plan)
Path:
\Building\Permits\O\Olive St\1334 S Olive St
20177846 - Permit
(Permit - Plan)
Path:
\Building\Permits\O\Olive St\1334 S Olive St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
OBSERVED CONDITIONS: <br />CONCLUSIONS: <br />LIMITATIONS: <br />Praneet R Erusu, P.E. <br />Principal Engineer <br />Erusu Consultants US Inc. <br />The observed roof framing is described below. If field conditions differ, the contractor shall notify the engineer <br />prior to starting construction. The roof framing is supported by 2x4 Rafters @ 24" O.C are spanning between <br />load bearing walls. The maximum allowed span of rafter is 7.5ft, to be verified in field by the contractor. <br />Based upon our review, we conclude that the existing structure is adequate to support the proposed solar panel <br />installation. In the area of the solar array, other live loads will not be present or will be greatly reduced (2019 CBC, <br />Section 1607.13.5). The glass surface of the solar panels allows for a lower slope factor per ASCE 7, resulting in <br />reduced design snow load on the panels. The gravity loads and the stresses of the structural elements, in the area <br />of the solar array are either decreased or increased by no more than 5%. Therefore, the requirements of Section <br />503.3 of the 2019 CEBC are met and the structure is permitted to remain unaltered. <br />The solar array will be flush-mounted (no more than 6" above the roof surface) and parallel to the roof surface. <br />Thus, we conclude that any additional wind loading on the structure related to the addition of the proposed solar <br />array is negligible. The attached calculations verify the capacity of the connections of the solar array to the existing <br />roof against wind (uplift), the governing load case. Regarding seismic loads, we conclude that any additional forces <br />will be small. Conservatively neglecting the weight of existing wall materials, the installation of the solar panels <br />represents an increase in the total weight (and resulting seismic load) of 8.4% for roof 1,2 & 3.6% for roof 3 to 8. <br />Because the increase in lateral forces is less than 10%, this addition meets the requirements of the exception in <br />Section 503.4 of the 2019 CEBC. Thus the existing lateral force resisting system is permitted to remain unaltered. <br />Installation of the solar panels must be performed in accordance with manufacturer recommendations. All work <br />performed must be in accordance with accepted industry-wide methods and applicable safety standards. Existing <br />Roof and structural members are assumed to be in good and serviceable condition. The contractor must notify <br />Erusu Consultants US Inc. should any damage, deterioration or discrepancies between the as-built condition of <br />the structure and the condition described in this letter be found. The use of solar panel support span tables <br />provided by others are allowed only where the building type, site conditions, site-specific design parameters, and <br />solar panel configuration match the description of the span tables. The design of the solar panel racking (mounts, <br />rails, etc.) and electrical engineering is the responsibility of others. Waterproofing around the roof penetrations is <br />the responsibility of others. Erusu Consultants US Inc. assumes no responsibility for improper installation of the <br />solar array. <br />07 Oct 2022 <br />EXP : 30 Sep 2023 <br />1334 S Olive St <br />12/05/22
The URL can be used to link to this page
Your browser does not support the video tag.