My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2039 N Victoria Drive #2 - Plan
PBA
>
Building
>
ProjectDox
>
V
>
Victoria Dr
>
2039 N Victoria Dr Unit# 2
>
2039 N Victoria Drive #2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2025 12:29:09 PM
Creation date
6/15/2025 12:29:02 PM
Metadata
Fields
Template:
Plan
Permit Number
101122463
Full Address
2039 N Victoria Dr Unit# 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PASS <br />DATE: 11/27/2024 COMPANY: JRS Engineering & Design LLC <br />STRUCALC BUILD: StruCalc Pro DESIGNED BY: Jeffrey Schaefer <br />CUSTOMER: REVIEWED BY: -- <br />PROJ. ADDRESS: -- PROJECT NAME: 2039 N Victoria Dr <br />-- <br />LEVEL: Roof LOADING: LRFD <br />MEMBER NAME: Ceiling Joist CODE: 2022 California Building Code <br />MEMBER TYPE: FLOOR JOIST NDS: 2018 NDS <br />MATERIAL: Solid Sawn <br />Douglas Fir-Larch No. 2 (1) 1.5 X 5.5 16(in) O.C. DRY <br />Ceiling Joist DIAGRAM <br />BEAM PROPERTIES <br />Start (ft): 0 End (ft): 14.75 Member Slope: 0/12 Actual Length (ft): 14.75 O.C. Spacing(in): 16 <br />Area Ix Iy BSW Lams G Kcr <br />(in²) (in⁴) (in⁴) (lbf/ft) Creep Factor <br />8.25 20.8 1.55 1.88 1 0.5 1 <br />STRENGTH PROPERTIES <br />Fb (psi) Ft (psi) Fv (psi) Fc (psi) Fc⊥(psi) E (psi) x10³ Emin (psi) x10³ <br />Base Values 900 575 180 1350 625 1600 580 <br />Adjusted Values 2905 1615 389 3208 939 1600 868 <br />K F*ϕ 2.16 2.16 2.16 2.16 1.5 1 1.5 <br />C M 1 1 1 1 1 1 1 <br />C T 1 1 1 1 1 1 1 <br />C i 1 1 1 1 1 1 1 <br />C F 1.3 1.3 1 1.1 1 1 1 <br />Bending Adjustment Factors C fu = 1 C r = 1.15 <br />BEAM DATA <br />Unbraced Length (ft) Beam End <br />Span Length (ft) Top Bottom Elev. Diff (ft) CL(Top) CL(Bottom) CL(Left) CL(Right) <br />1 14.75 0 14.75 0 <br />PASS-FAIL <br />Shear Stress Y (psi) <br />Bending Stress Y (psi) <br />Deflection Y (in) <br />Bearing Stress (psi) <br />PASS/FAIL <br />PASS (87.8%) <br />PASS (39.7%) <br />PASS (23.5%) <br />PASS (95.2%) <br />MAGNITUDE <br />28.6 <br />1401.7 <br />0.753 (=L/235) <br />45.2 <br />STRENGTH <br />233.3 <br />2323.9 <br />0.983 (=L/180) <br />939.4 <br />LOCATION (ft) <br />14.75 <br />7.228 <br />7.375 <br />0 <br />LOAD COMBO <br />1.4D <br />1.2D+1.6L+0.5Lr <br />D+L <br />1.2D+1.6L+0.5Lr <br />TIME EFFECT λ <br />0.6 <br />0.8 <br />0 <br />0.8 <br />REACTIONS Units for V: lbf Units for M: lbf-ft <br />DEAD LIVE TOTALY axis <br />A 112 43 155 <br />B 112 40 152 <br />Reaction Location <br />A B <br />Page 7 <br />2022 California Building Code LRFDPROJECT: 2039 N Victoria Dr <br />2039 N Victoria Drive <br />#24/28/2025
The URL can be used to link to this page
Your browser does not support the video tag.