Laserfiche WebLink
McPherson Engineering By: T.C. <br />Date: 12/14/22 <br />Gravity Loads: <br />DEMAND DECREASED BY 5.76% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 2.58% < 10% = OK! <br />Anchorage: <br />DEMAND OF 747.9LB. < CAPACITY OF 1702.4LB. = OK! <br />USE (2) 5/16IN. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />12/14/2022 5:20 PM <br />7 of 7 <br />©McPherson Engineering <br />3918 S Timber St- <br />2017707802/23/23