Laserfiche WebLink
V E C O <br />d e s i g n - s t u d i o <br />SHEET: <br />JOB No: <br />DATE: <br />DRAWN BY: <br />PLAN: <br />PHONE: <br />JOB SITE: <br />PROJECT NAME: <br />REVISION:BY: <br />VASQUEZ <br />RESIDENCE <br />23-017 <br />06-21-2024 <br />S.V <br />714-713-3124 <br />627, 627 UNIT 2 S. SHELTON. ST. <br />SANTA ANA, CA 92703 <br />d e s i g n e r <br />O s c a r V e g a <br />C e 1 4 - 4 -1 2 4 <br />O i e 3 1 - 2 3 -3 5 <br />i n o e o d e s i g n s .o <br />5 3 4 C O A V E . <br />A A E C A 2 5 <br />APPROVED BY :O.V. <br />BEST MANAGEMENT <br />PRACTICES <br />G-5 <br />Concrete Waste Management WM-8 <br />November 2009 California Stormwater BMP Handbook <br />Construction <br />www.casqa.org <br />7 of 7 <br />Concrete Waste Management WM-8 <br />Categories <br />EC Erosion Control <br />SE Sediment Control <br />TC Tracking Control <br />WE Wind Erosion Control <br />NS Non-Stormwater <br />Management Control <br />WM Waste Management and <br />Materials Pollution Control <br />Legend: <br /> Primary Category <br /> Secondary Category <br /> <br /> <br />Description and Purpose <br />Prevent the discharge of pollutants to stormwater from <br />concrete waste by conducting washout onsite or offsite in a <br />designated area, and by employee and subcontractor training. <br />The General Permit incorporates Numeric Effluent Limits <br />(NEL) and Numeric Action Levels (NAL) for pH (see Section 2 <br />of this handbook to determine your project’s risk level and if <br />you are subject to these requirements). <br />Many types of construction materials, including mortar, <br />concrete, stucco, cement and block and their associated wastes <br />have basic chemical properties that can raise pH levels outside <br />of the permitted range. Additional care should be taken when <br />managing these materials to prevent them from coming into <br />contact with stormwater flows and raising pH to levels outside <br />the accepted range. <br />Suitable Applications <br />Concrete waste management procedures and practices are <br />implemented on construction projects where: <br /> Concrete is used as a construction material or where <br />concrete dust and debris result from demolition activities. <br /> Slurries containing portland cement concrete (PCC) are <br />generated, such as from saw cutting, coring, grinding, <br />grooving, and hydro-concrete demolition. <br />Targeted Constituents <br />Sediment <br />Nutrients <br />Trash <br />Metals <br />Bacteria <br />Oil and Grease <br />Organics <br />Potential Alternatives <br />None <br /> <br /> <br />November 2009 California Stormwater BMP Handbook <br />Construction <br />www.casqa.org <br />1 of 7 <br />Fiber Rolls SE-5 <br />July 2012 California Stormwater BMP Handbook Portal <br />Construction <br />www.casqa.org <br />5 of 5 <br />EROSION CONTROL PRACTICES <br />EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES <br />ESPECIALLY SHALL BE PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT <br />SURFACES SUCH AS EROSION CONTROL MATS, ADEQUATE GROUND COVER VEGETATION, AND <br />BONDED FIBER MATRIX. <br />NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER. <br />DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION <br />SITE.CONTRACTOR SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND <br />TEMPORARY EROSION CONTROL MEASURES. <br />REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL <br />BE CONDUCTED IN PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. <br />DO NOT REMOVE TREES OR SHRUBS UNNECESSARILY; THEY HELP DECREASE EROSION. <br />TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT <br />IMMEDIATELY PLANNED FOR EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY <br />PLANTING FAST-GROWING ANNUAL AND PERENNIAL GRASSES TO SHIELD AND BIND THE SOIL. <br />PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING <br />ACTIVITIES ARE COMPLETE. <br />WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED. ON-SITE CONSTRUCTION MATERIAL <br />STORAGE <br />STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND <br />SPILLAGE. CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF <br />THE RAIN. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED <br />ON-SITE. <br />ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES KEPT ON-SITE. <br />STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE, <br />ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER FLOWS AND <br />STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION <br />MEASURES AND PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT <br />ALL TIMES. <br />CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED <br />CONSTRUCTION MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, <br />WHERE WATER CAN CARRY THEM INTO THE CONVEYANCE SYSTEM IS STRICTLY PROHIBITED. <br />NO SEEPAGE FROM DUMPSTERS SHALL BE DISCHARGED INTO STORMWATER. BERMS/DIKES <br />SHALL BE PLACED AROUND DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSTERS <br />SHALL BE CHECKED FREQUENTLY FOR LEAKS. DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL <br />DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES WITH IMPERVIOUS ROOFING <br />OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANY TRASH MATERIAL. <br />MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER-BASED PAINTS, VEHICLE <br />FLUIDS, BROKEN ASPHALT AND CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE <br />RECYCLED. NON-RECYCLABLE MATERIALS MUST BE TAKEN TO AN APPROPRIATE LANDFILL OR <br />DISPOSED OF AS HAZARDOUS WASTE. <br />POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING <br />RECEPTACLES AROUND THE SITE. <br />PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. <br />CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS <br />AWAY FROM STORMDRAIN INLETS ON PERVIOUS SURFACES. <br />ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND <br />STORMDRAIN. CONTRACTOR MUST ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE <br />TRAVELED AWAY FROM CONSTRUCTION SITE <br />WASTE MANAGEMENT <br />627 S Shelton St & <br />#212/4/2024