Laserfiche WebLink
Lifting weight 66.3 kg (146.1 lb) <br />Total installed weight 78.9 kg (174lb) <br />Enclosure Outdoor-NEMA 3R <br />IQ8D-BAT Microinverter enclosure NEMA type 6 <br />Cooling Natural convection <br />Operating noise @1 m <30 dBA maximum <br />Altitude Up to 2,500 meters (8,202 feet) <br />Mounting Wall -mount or pedestal -mount (sold separately) <br />Compatible with IQ and M Series Microinverters, IQ System Controller 3/3G, <br />Compatibility <br />IQ Combiner 5/5C, and IQ Gateway for grid -tied and backup operation <br />Communication <br />Wired control communication <br />Services <br />Backup, Self -Consumption, TOU, and NEM integrity <br />Monitoring <br />Enphase Installer Platform and Enphase App monitoring options; API integration <br />CA Rule 21(UL 1741-SA), IEEE 1547:2018 (UL 1741-SB, 3rd Ed.) CAN/CSA C22.2 No. <br />107.1-16 <br />UL 95408, UL 9540A9, UN 38.3, UL 1998, UL 991, NEMA Type 3R, AC156 EMI: 47 CFR, <br />Compliance <br />Part 15, Class B, ICES 003 <br />Cell module: UL 1973, UN 38.3 <br />Inverters: UL 62109-1, IEC 62109-2 <br />What's in the box <br />IQ Battery 5P unit <br />IQ Battery 5P unit (BO5-TO2-USOO-1-3) <br />ID cover and conduit cover <br />IQ Battery 5P cover with two conduit covers for the left and right sides of the unit <br />Bottom mounting bracket and top shield <br />Bottom mounting bracket for mounting the battery on the wall. One top shield is <br />required for UL 9540A <br />M5 seismic screws <br />Two M5 seismic screws for securing the battery unit on the bottom mounting bracket <br />M4 grounding screws <br />Two M4 grounding screws for securing the top shield on the bottom mounting bracket <br />M5 ID cover grounding screws <br />Two M5 ID cover grounding screws for the EMI/EMC requirement <br />Cable ties <br />Six cable ties for securing field cables to the unit <br />Control (CTRL) connector <br />Spare CTRL connector without resistor for CTRL wiring <br />Control (CTRL) connector with resistor <br />Spare CTRL connector with resistor for CTRL wiring <br />Quick install guide (QIG) <br />QIG for IQ Battery unit installation instructions <br />IQ8D-BAT-RMA IQ8D-BAT Microinverter for field replacement <br />B05-TO2-US00-1-3-RMA IQ Battery 5P Battery unit for field replacement <br />B05-CX-0550-0 IQ Battery 5P cover for field replacement <br />B05-PI-0550-0 IQ Battery 5P pedestal mount <br />s Following local standards, choose a well -ventilated, non -habitable indoor location (like a 2-car garage) or an outdoor location where the ambient temperature and humidity are within -4°F to 131°F <br />(-20°C to 55°C) and 5%to 95%RH, non -condensing. Avoid direct sunlight to ensure the temperature stays in the optimal operating range. This ensures charging and discharging currents are not <br />de -rated due to temperature. The full performance will occur within 59°F to 113T (15°C to 45°C) while charging and within 41T to 122°F WC to 50°C) while discharging. <br />s Evaluated to UL 9540A for thermal runaway fire propagation and reduced separation distance as required in 2021 IRC R328.3.1, 2021 IFC 1207.1.5, and 2023 NFPA 85515.3.1 and 9.1.5. Follow all <br />installation Instructions and local codes and requirements of the Authority Having Jurisdiction (AHA when installing the Enphase Energy System. <br />DSH-00010-9.0-EN-2024-11-21 <br />CITY OF SANTA ANA <br />Planning <br />and BUilding Agen <br />y <br />E M R 0\.\/ER <br />Q „nrn�/q� iz <br />EMPAREPK96TRI 4OLAR <br />Optional - <br />B05-CP-096-0 <br />IQ Battery 5P conduit plates for field replacement. Includes one left -side and one <br />right -side conduit plate <br />FOR <br />PFRM`TlS �.YANC <br />CLOVIS, CA 9 611 <br />TEL: (800) 306 6953 <br />CSLB: 1057693 <br />B05-WB-0543-0 <br />IQ Battery 5P wall bracket for field replacement. Includes one bottom mounting <br />bracket and one top shield <br />Ma <br />Da <br />Email : permits@mpwrsolar.com <br />ter ID: <br />e: <br />IQBATTERY-HNDL-5 <br />IQ Battery 5P lifting handles. Includes one left -side and one right -side lifting handle <br />C-10 #1057693 <br />B05-ACFB-080-0 IQ Battery 5P AC filter board for field replacement <br />B05-BMSNA-0490-0 <br />IQ Battery 5P BMS board for field replacement <br />Scott Forster <br />B05-CANB-063-0 <br />IQ Battery 5P control communication board for field replacement <br />VERSION <br />B05-NICS-0524-0, B05-NUCS-0524-0 <br />IQ Battery 5P control switch is preinstalled on the wiring cover for field replacement <br />DESCRIPTION DATE REV <br />INITIAL RELEASE 03-07-2025 UR <br />Components of the Enphase Energy System <br />10 Microinverters <br />InIQ Series Microinverters pack <br />more power into less space <br />than other rooftop solar systems <br />and make rooftop solar more <br />productive, reliable, smart, and <br />safe. <br />Communications Kit 21NT <br />The Communications Kit 21NT <br />enables wired communication <br />between the battery and <br />gateway for grid -tied operation. <br />IQ Gateway <br />The IQ Gateway with current <br />transformers provides complete <br />control and insight into the <br />Enphase Energy System. <br />IQ Battery 51P accessories <br />The IQ Battery 5P lifting <br />handles are reusable and <br />ease the installation process. <br />The IQ Battery 5P pedestal <br />enables floor mounting of the <br />IQ Battery 5P. <br />DSH-00010-9.0-EN-2024-11-21 <br />PROJECT NAME <br />Z <br />O <br />Q W <br />co Q <br />LLI Z <br />wQ�LL 00 <br />Cq <br />0) U (V J CV <br />LZLI— QULUCq <br />Z d U Z fn <br />W Q of <br />J Q = IL <br />Q Q ? Q <br />ce)QO <br />H <br />J_ <br />H <br />D <br />SHEET NAME <br />SPEC SHEETS <br />SHEET SIZE <br />ANSI B <br />11" X 17" <br />SHEET NUMBER <br />PV-11 <br />