My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2961 3%4 W MacArthur Blvd WCC01 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
MacArthur Blvd
>
2961 3/4 W MacArthur Blvd Unit# WCC01
>
2961 3%4 W MacArthur Blvd WCC01 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2025 12:44:20 PM
Creation date
6/15/2025 12:43:53 PM
Metadata
Fields
Template:
Plan
Permit Number
101123041
Full Address
2961 3/4 W MacArthur Blvd Unit# WCC01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mount Structural Analysis Report <br />(3) 10.00-Ft T-Arm <br />Site ID: 5000379823-VZW / <br />Mount Steel (EPA)a per ANSIITIA-222-H Section 2.6.11.2: <br />CITY OF SANTA ANA <br />Planning and Building Agency <br />August 1, 2024 <br />4LVARY CHAPEL <br />APppw irbr-Ved <br />FOR PERMIT ISSUANCE <br />Ice <br />Mount Pipes Excluded <br />Mount Pipes <br />Included " <br />Thickness <br />(In) <br />Front (EPA)a <br />(Sq. Ft.) <br />Side (EPA)a <br />(Sq. Ft.) <br />Front (EPA)a <br />(Sq. Ft.) <br />DAPie (EPA)a <br />(Sq. Ft.) <br />0 <br />5.8 <br />1.9 <br />12.6 <br />8.7 <br />0.5 <br />7.7 <br />2.8 <br />17.4 <br />12.5 <br />1 <br />9.4 <br />3.3 <br />22.0 <br />15.9 <br />Notes: <br />- (EPA)a values listed above may be used in the absence of more precise information <br />- (EPA)a values in the table above include 1 sector(s). <br />- Ka factors included in (EPA)a calculations <br />Requirements: <br />The existing mounts will be SUFFICIENT for the final loading configuration shown in attachment 2 upon the <br />completion of the requirements listed below. <br />Contractor shall record all dimensions and member sizes requested in the Mount Geometry Verification <br />Requirements section of the Mount Analysis report. Contractor shall provide the requested information to <br />Colliers Engineering & Design for structural verification while on site. Contact FOR if these documents are not <br />available to the general contractor. <br />Contractor shall inspect climbing facilities and safety climb, if present, and ensure they are in good condition. <br />Contractor shall install safety climb wire rope guides in locations where wire rope is rubbing against the mount <br />or mount -to -tower connection steel. Wire brush clean any observed corrosion and protect with two (2) coats of <br />cold galvanization (Zinga or Zinc Kote). Contractor shall provide photos of wire rope guide installation as part of <br />PMI documents. Contact FOR if additional guidance is required. <br />ANSI/ASSP rigging plan review services compliant with the requirements of ANSI/TIA 322 are available for a <br />Construction Class IV site or other, if required. Separate review fees will apply. <br />Attachments: <br />1. Contractor Required Post Installation Inspection (PMI) Report Deliverables <br />2. Antenna Placement Diagrams <br />3. Desktop Mount Mapping Report (for reference only) <br />4. Analysis Calculations <br />
The URL can be used to link to this page
Your browser does not support the video tag.