My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2961 3%4 W MacArthur Blvd WCC01 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
MacArthur Blvd
>
2961 3/4 W MacArthur Blvd Unit# WCC01
>
2961 3%4 W MacArthur Blvd WCC01 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2025 12:44:20 PM
Creation date
6/15/2025 12:43:53 PM
Metadata
Fields
Template:
Plan
Permit Number
101123041
Full Address
2961 3/4 W MacArthur Blvd Unit# WCC01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
These photos shall also certify that the placement and geo <br />equipment on the mount is as depicted in the antenna pla, <br />CITY OF SANTA ANA <br />Planning and Building Agency <br />To� <br />may, lS. <br />Approved <br />tfy0oR&61RMIT ISSUANCE <br />lent diagram in this <br />form. Master ID: <br />o Photos that show the model number of each antenna and piece of qWpment installed <br />per sector. <br />Antenna & equipment placement and Geometry Confirmation: <br />• The contractor shall certify that the antenna & equipment placement and geometry is in <br />accordance with the sketch and table as included in the mount analysis and noted below. <br />❑ The contractor certifies that the photos support and the equipment on the mount is as depicted on <br />the sketch and table included in this form and with the mount analysis provided. <br />MW <br />❑ The contractor notes that the equipment on the mount is not in accordance with the sketch and has <br />noted the differences below and provided photo documentation of any alterations. <br />Special Instructions / Validation as required from the MA or any other information the contractor <br />deems necessary to share that was identified: <br />Issue: <br />Contractor shall record all dimensions and member sizes requested in the Mount Geometry Verification <br />Requirements section of the Mount Analysis report. Contractor shall provide the requested information to <br />Colliers Engineering & Design for structural verification while on site. Contact FOR if these documents are not <br />available to the general contractor. <br />Contractor shall inspect climbing facilities and safety climb, if present, and ensure they are in good condition. <br />Contractor shall install safety climb wire rope guides in locations where wire rope is rubbing against the mount <br />or mount -to -tower connection steel. Wire brush clean any observed corrosion and protect with two (2) coats of <br />cold galvanization (Zings or Zinc Kote). Contractor shall provide photos of wire rope guide installation as part of <br />PMI documents. Contact FOR if additional guidance is required. <br />Kesponse: <br />Special Instruction Confirmation: <br />❑ The contractor has read and acknowledges the above special instructions. <br />❑ All hardware listed in the Special Instructions above (if applicable) has been properly <br />installed, and the existing hardware was inspected. <br />
The URL can be used to link to this page
Your browser does not support the video tag.