Laserfiche WebLink
All ideas, drawings,specifications shown herein are the <br />property of West Coast Design Group and shall not be <br />used, copied, reproduced, or disclosed to any person, firm <br />or corporation, without the written consent of West Coast <br />Design Group. Any infringement will be subject to legal <br />action. The contractor shall verify and be responsible for all <br />dimensions and conditions on the job and notify this office of <br />any variations from dimensions and conditions shown <br />herewith. Written dimensions take precedence over scaled <br />dimensions. <br />Mark Transmittal Set Date Description <br />01 12/19/2024 <br />SHEET TITLE <br />T-3 <br />SHEET 10 <br />PROJECT NO: <br />STATUS: <br />DRAWN BY: <br />CHK'D BY: <br /> <br /> <br />PROJECT: <br />CLIENT: <br />PLOT DATE: 3/14/2025 <br /> 52-24 <br />PLAN CHECK#:101122356 <br /> C <br />: <br />\ <br />U <br />s <br />e <br />r <br />s <br />\ <br />j <br />e <br />r <br />r <br />y <br />\ <br />D <br />o <br />c <br />u <br />m <br />e <br />n <br />t <br />s <br />\ <br />D <br />r <br />a <br />w <br />i <br />n <br />g <br />s <br />\ <br />R <br />e <br />s <br />i <br />d <br />e <br />n <br />t <br />i <br />a <br />l <br />\ <br />S <br />a <br />n <br />t <br />a <br /> <br />An <br />a <br /> <br />Gr <br />i <br />s <br />e <br />t <br /> <br />PI <br />\ <br />C <br />D <br />\ <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br /> <br />G <br />r <br />i <br />s <br />e <br />t <br /> <br />P <br />I <br />. <br />p <br />l <br />n <br /> Submittal <br /> <br />BMP Plan <br />ADU <br />3110 & 3112 S Griset Pl <br />Santa Ana, CA 92704 <br />Matthew Mallari & <br />Natalie Nguyen <br />PLANNING - DESIGN <br />41055 CHACO CANYON ROAD <br />MURRIETA CA 92562 <br />WEST COAST <br />DESIGN GROUP <br />N <br />A <br />B <br />C <br />D <br />A <br />D <br />C <br />B <br />KEYNOTES: <br />ALL CONSTRUCTION MATERIALS SHALL BE <br />DELIVERED AND STORED ON SITE PER BMP <br />WM-1. USE OF THESE MATERIALS SHALL BE <br />PER BMP WM-2. <br />PROVIDE CONCRETE WASTE MANAGEMENT <br />AND VEHICLE AND EQUIPMENT MAINTENANCE <br />PER BMP WM-8, NS-10 & NS-8. <br />PROVIDE FIBER ROLL PER BMP SE-5. <br />PROVIDE STABALIZED CONSTRUCTION <br />ENTRANCE/ EXIT PER BMP TC-1. <br />DESIGNATED <br />AREA FOR <br />MATERIAL <br />WASHOUT <br />SEDIMENT AREA <br />PROPERTY LINE, TYP. <br />(E) RESIDENCE <br />(E <br />) <br /> CO <br />V <br />E <br />R <br />E <br />D <br /> PA <br />T <br />I <br />O <br />S. <br /> <br />GR <br />I <br />S <br />E <br />T <br /> <br />PL <br />(N) ADU <br />SCALE: 1/8" = 1'-0"1 Storm Water Plan <br />BEST MANAGEMENT PRACTICE FOR CONSTRUCTION <br />ERODED SEDIMENTS AND OTHER POLLUTANTS MUST BE RETAINED ON SITE AND MAY NOT BE <br />TRANSPORTED FROM THE SITE VIA SHEETFLOW, SWALES, AREA DRAINS, NATURAL DRAINAGE <br />COURSES OR WIND. <br />• STOCKPILES OF EARTH AND OTHER CONSTRUCTION RELATED MATERIALS MUST BE PROTECTED <br />FROM BEING TRANSPORTED FROM THE SITE BY THE FORCES OF WIND OR WATER. <br />• FUELS, OILS, SOLVENTS AND OTHER TOXIC MATERIALS MUST BE STORED IN ACCORDANCE WITH <br />THEIR LISTING AND ARE NOT TO CONTAMINATE THE SOIL AND SURFACE WATERS. ALL APPROVED <br />STORAGE CONTAINERS ARE TO BE PROTECTED FROM THE WEATHER. SPILLS MUST BE CLEANED UP <br />IMMEDIATELY AND DISPOSED OF IN A PROPER MANNER. SPILLS MAY NOT BE WASHED INTO THE <br />DRAINAGE SYSTEM. <br />• NON-STORMWATER RUNOFF FROM EQUIPMENT AND VEHICLE WASHING AND ANY OTHER ACTIVITY <br />SHALL BE CONTAINED AT THE PROJECT SITE. <br />• EXCESS OR WASTE CONCRETE MAY NOT BE WASHED INTO THE PUBLIC WAY OR ANY OTHER <br />DRAINAGE SYSTEM. PROVISIONS SHALL BE MADE TO RETAIN CONCRETE WASTES ON SITE UNTIL <br />THEY CAN BE DISPOSED OF AS SOLID WASTE. <br />• TRASH AND CONSTRUCTION RELATED SOLID WASTES MUST BE DEPOSITED INTO A COVERED <br />RECEPTACLE TO PREVENT CONTAMINATION OF RAINWATER AND DISPERSAL BY WIND. <br />• SEDIMENTS AND OTHER MATERIALS MAY NOT BE TRACKED FROM THE SITE BY VEHICLE TRAFFIC. <br />THE CONSTRUCTION ENTRANCE ROADWAYS MUST BE STABILIZED SO AS TO INHIBIT SEDIMENTS <br />FROM BEING DEPOSITED INTO THE PUBLIC WAY. ACCIDENTAL DEPOSITIONS MUST BE SWEPT UP <br />IMMEDIATELY AND MAY NOT BE WASHED DOWN BY RAIN OR OTHER MEANS. <br />• ANY SLOPES WITH DISTURBED SOILS OR DENUDED OF VEGETATION MUST BE STABILIZED SO AS <br />TO INHIBIT EROSION BY WIND AND WATER.