My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3340 S Crawford Glen - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Crawford Glen
>
3340 S Crawford Glen
>
3340 S Crawford Glen - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2025 12:44:26 PM
Creation date
6/15/2025 12:44:00 PM
Metadata
Fields
Template:
Plan
Permit Number
20185449
Full Address
3340 S Crawford Glen
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/ce/ <br />Astra v.2.050 <br />11/20/2024 12:18 PM CAT 1, EOSS <br />#AStamp <br />Subject : Structural Certification for Proposed Residential Solar Installation. <br />Job Number: 109R-340SAMP; Rev A <br />Client: Angela Sampson <br />Address: 3340 S Crawford Glen, Santa Ana, CA 92704 <br />Attn: To Whom It May Concern Signed on: 11/20/2024 <br />The existing structure is assumed to be a light-frame wood roof and free from damage, deterioration, or modification that would compromise its <br />structural integrity. Preliminary site information was obtained by a representative of Sunrun. Prior to installation of the solar PV system, a site <br />observation shall be conducted by a representative of Sunrun to confirm the above-noted assumptions. Structural evaluation of the loading is <br />based on the assumptions above and the applicable design criteria listed below. <br />Design Criteria: <br /> • 2022 CBC/CEBC, 7-16 ASCE & 2018 NDS <br /> • Basic (Category II) Wind Speed V=96 mph, Exposure B <br /> • Ground Snow Load = 0 psf <br />Based on this evaluation, I certify that the alteration to the existing structure by installation of the PV system meets the requirements of the <br />applicable existing building code provisions adopted/referenced above. <br />Additionally, the PV module assembly and hardware supporting it have been designed according to manufacturer's specifications per the <br />loading criteria referenced above. <br />Installer shall inspect the existing roof framing to verify it is in suitable condition and does not exhibit any signs of damage which may diminish <br />the capacity of its members or connections prior to commencement of PV installation. If actual framing differs from the assumed condition, the <br />installer shall notify the engineer of record prior to proceeding with installation. <br />Results Summary (Hardware Check Includes Uplift Check on Attachments/Fastener, Structure Check Considers Main Structure) <br />AR-01 <br />Orientation Attachment Spacing/Cantilever Configuration Max DCR Result <br />Landscape 72 / 28 Staggered 34%Pass <br />Portrait 72 / 28 Staggered 39%Pass <br />Roofing Material Pitch Structure Check <br />Tile 41°Pass <br />AR-02 <br />Orientation Attachment Spacing/Cantilever Configuration Max DCR Result <br />Landscape 72 / 28 Staggered 34%Pass <br />Portrait 72 / 28 Staggered 39%Pass <br />Roofing Material Pitch Structure Check <br />Tile 41°Pass <br />225 Bush St. Suite 1400 San Francisco, CA 94104 <br />Exp. 12/31/2024 <br />Digitally Signed On: 11/20/24 <br />3340 S Crawford <br />Glen4/28/2025
The URL can be used to link to this page
Your browser does not support the video tag.