Laserfiche WebLink
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) <br />Member Reaction (lbs)210 @ 2 1/2"2231 (3.50")Passed (9%)--1.0 D + 1.0 L (All Spans) <br />Shear (lbs)185 @ 9"990 Passed (19%)1.00 1.0 D + 1.0 L (All Spans) <br />Moment (Ft-lbs)617 @ 6' 3 1/2"819 Passed (75%)1.00 1.0 D + 1.0 L (All Spans) <br />Live Load Defl. (in)0.279 @ 6' 3 1/2"0.608 Passed (L/523)--1.0 D + 1.0 L (All Spans) <br />Total Load Defl. (in)0.465 @ 6' 3 1/2"0.811 Passed (L/314)--1.0 D + 1.0 L (All Spans) <br />Member Length : 12' 7" <br />System : Ceiling <br />Member Type : Attic Joist <br />Building Use : Residential <br />Building Code : IBC 2018 <br />Design Methodology : ASD <br />Member Pitch : 0/12 <br />All Product Solutions <br />Depth Series Plies Spacing Cost Index <br />5 1/2"1 1/2" 1.3E TimberStrand® LSL 1 19.2"0.56 * <br />5 1/2"2 x DF No.1 1 16"0.88 <br />All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal. <br />SOLUTIONS REPORT PASSED <br />The purpose of this report is for product comparison only. Load and support information necessary for professional design review is not displayed here. Please print an individual Member Report for submittal <br />purposes. <br />Level, Ceiling: Attic Joist <br />Current Solution: 1 piece(s) 2 x 6 DF No.1 @ 16" OC <br />ForteWEB Software Operator Job Notes 4/29/2024 1:55:10 PM UTC <br />Ehab Elias <br />Structural Ventures <br />(760) 484-6343 <br />eliasehab@gmail.com <br />ForteWEB v3.7, Engine: V8.4.0.40, Data: V8.1.5.0 <br />File Name: rafters <br />Page 1 / 1 <br />HISTORIC - 1012 W Third St & <br />1014 W Third St Unit 1 & Unit 2 <br />4/14/2025