Laserfiche WebLink
THESE GENERAL NOTES ARE INTENDED TO SUPPLEMENT, NOT REPLACE, THE PROJECT SPECIFICATIONS. <br />CONFLICTS BETWEEN THESE GENERAL NOTES AND THE SPECI FICATIONS SHALL BE BROUGHT TO THE ATTENTION <br />OF THE ARCHITECT FOR INTERPRETATION. <br />1. ALL WORK SHALL COMPLY WITH THE APPLICABLE LOCAL AND MUNICIPAL BUILDING CODES AS WELL AS <br />ALL APPLICABLE REGULATORY AGENCIES, INCLUDING, BUT NOT LIMITED TO CaIOSHA, SCAQMD, ETC. <br />GENERAL NOTES ARE APPLICABLE TO THIS ENTIRE DRAWING SET. IT IS NOT THE CONTRACTOR'S <br />RESPONSIBILITY TO ASCERTAIN THAT THE CONTRACT DOCUM ENTS ARE IN ACCORDANCE WITH APPLICABLE <br />LAWS, STATUTES, ORDINANCES, BUILDING CODES, AND RULES AND REGULATIONS. HOWEVER, IF THE <br />CONTRACTOR OBSERVES THAT PORTIONS OF THE CONTRACT DOCUMENTS ARE AT VARIANCE THEREWITH, <br />THE CONTRACTOR SHALL PROMPTLY NOTIFY THE ARCHITECT WITH APPROPRIATE MODIFICATION. <br />2. IN THE EVENT OF A CONFLICT WITH CODE REQUIREMENTS AND ITEMS CALLED OUT ON THE PLANS, THE <br />CODE OR CALL OUT WHICH ESTABLISHES THE HIGHER STANDARD SHALL TAKE PRECEDENCE. THE ARCHITECT <br />SHALL BE NOTIFIED OF ALL CONFLICTS. <br />3. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. <br />4. THE TERMS "GENERAL CONTRACTOR", "CONSTRUCTION CONTRACTOR" AND "CONTRACTOR" SHALL BE <br />UNDERSTOOD TO BE THE SAME, UNLESS SPECIFICALLY NOTED OTHERWISE. THE TERMS "SUBCONTRACTOR" <br />AND "SUB-CONTRACTOR" SHALL BE UNDERSTOOD TO BE THE SAME AND TO BE IN REFERENCE TO ALL TIERS <br />OF SUBCONTRACTORS, UNLESS SPECIFICALLY NOTED OTHERWISE. <br />5. THE CONTRACTOR SHALL VERIFY ALL JOB CONDITIONS, DIMENSIONS AND DETAILS, BOTH CLEARLY NOTED <br />AND REASONABLY INFERRED, PRIOR TO COMMENCING CONSTRUCTION. <br />6. THE ARCHITECT SHALL BE IMMEDIATELY NOTIFIED OF ANY DISCREPANCIES IN THE CONSTRUCTION <br />DOCUMENTS WHICH COULD INTERFERE WITH, OR DELAY, THE SATISFACTORY COMPLETION OF THE WORK, <br />PRIOR TO THE COMMENCEMENT OF CONSTRUCTION WORK. IF THE CONTRACTOR PERFORMS ANY <br />CONSTRUCTION ACTIVITY KNOWING IT INVOLVES A RECOGNI ZED ERROR OR OMMISSION, WITHOUT SUCH <br />NOTICE TO THE ARCHITECT, THE CONTRACTOR SHALL ASSUME APPROPRIATE RESPONSIBILITY FOR SUCH <br />PERFORMANCE AND SHALL BEAR AN APPROPRIATE AMOUNT OF THE ATTRIBUTABLE COSTS FOR <br />CORRECTION. <br />7. IT SHALL BE THE RESPONSIBILITY AND ACCOUNTABILITY OF THE GENERAL CONTRACTOR TO ASSURE THAT <br />ALL SUBCONTRACTORS OBTAIN ALL NECESSARY PERMITS REQUIRED FOR THOSE SECTIONS OF THE WORK <br />PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. <br />8. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK, USING THE CONTRACTOR'S BEST SKILL AND <br />ATTENTION. THE CONTRACTOR SHALL BE SOLELY RESPONSI BLE FOR, AND HAVE CONTROL OVER, <br />CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES, INCLUDING SAFETY <br />PROCEDURES, AND FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT, UNLESS <br />CONTRACT DOCUMENTS GIVE OTHER SPECIFIC INSTRUCTIONS CONCERNING THESE MATTERS. <br />9. THE CONTRACTOR SHALL BE RESPONSIBLE TO THE OWNER FOR ACTS AND OMISSIONS OF THE <br />CONTRACTOR'S EMPLOYEES, ALL TIERS OF SUBCONTRACTORS AND THEIR AGENTS AND EMPLOYEES, AND <br />OTHER PERSONS PERFORMING PORTIONS OF THE WORK UNDER A CONTRACT WITH THE CONTRACTOR. <br />10. THE CONTRACTOR SHALL HAVE RELEVANT PROJECT EXPERIENCE INVOLVING THE QUALITIES AND <br />COMPLEXITIES OF CONSTRUCTION COMPARABLE TO THE PROJECT INCLUDED IN THESE CONSTRUCTION <br />DOCUMENTS. ALL SUBCONTRACTORS SHALL HAVE COMPARABLE PROJECT EXPERIENCE RELEVANT TO THE <br />SCOPE OF THEIR TRADES. <br />11. ALL TIERS OF CONSTRUCTION WORKERS FOR THIS PROJECT SHALL BE SKILLED WORKERS IN THEIR TRADES <br />AND KNOWLEDGEABLE OF THE BEST PRACTICES FOR THEIR TRADES. <br />12. ALL WORK, WHETHER SPECIFICALLY SHOWN IN OR REASONABLY INFERRED FROM THE CONSTRUCTION <br />DOCUMENTS, SHALL BE CONSIDERED TO BE FULLY UNDERSTOOD IN ALL RESPECTS BY THE CONTRACTOR, <br />UNLESS SPECIFICALLY QUESTIONED IN WRITING BY THE CONTRACTOR. IN THE ABSENCE OF ANY <br />QUESTIONING BY THE CONTRACTOR, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY <br />MISINTERPRETATION, OR CONSEQUENCES THEREOF, OF THE WORK DESCRIBED IN THE CONSTRUCTION <br />DOCUMENTS. <br />13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWI NG AND FAMILIARIZING HIMSELF (OR HERSELF) <br />WITH THE CONSTRUCTION DRAWINGS AND SPECIFICATIONS. ALL WORK INDICATED ON, OR REASONABLY <br />INFERRED FROM, THE DRAWINGS AND SPECIFICATIONS WILL BE DEEMED TO HAVE BEEN INCLUDED IN THE <br />CONTRACT BETWEEN THE OWNER AND CONTRACTOR. <br />14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSPECTION OF PORTIONS OF WORK ALREADY PERFORMED <br />PRIOR TO THIS CONTRACT TO DETERMINE THAT SUCH PORTI ONS ARE IN PROPER CONDITION TO RECEIVE <br />SUBSEQUENT WORK OF THIS CONTRACTED SCOPE AND CORRECT CONDITIONS DETRIMENTAL TO TIMELY <br />AND PROPER COMPLETION OF THE WORK. DO NOT PROCEED UNTIL UNSATISFACTORY CONDITIONS ARE <br />CORRECTED. COMMENCEMENT OF WORK BY ANY TRADE WILL BE CONSIDERED UNQUALIFIED <br />ACCEPTANCE OF THE SUBSTRATE AND INSTALLATION CONDITIONS. NO CLAIM FOR WARRANTY VOIDANCE <br />WILL BE ACCEPTED IF INSTALLATION OVER AN IMPROPER SUBSTRATE HAS COMMENCED. <br />15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL REQUIRED CONSTRUCTION <br />INSPECTIONS - REGARDLESS OF WHETHER THE INSPECTION I S PERFORMED BY THE GOVERNING <br />JURISDICTIONS' INSPECTORS, OR BY DEPUTY INSPECTORS. ANY COSTS INCURRED DUE TO INSPECTORS <br />BEING CALLED FOR INSPECTIONS AND THE WORK IS NOT READY FOR INSPECTIONS SHALL BE THE <br />RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL COPY THE OWNER AND ARCHITECT ON <br />ALL REPORTS OF DEPUTY INSPECTORS. <br />16. THE CONTRACTOR SHALL HAVE A COMPETENT SUPERINTENDENT ON SITE AT ALL TIMES WHEN THERE IS <br />WORK IN PROGRESS. <br />17. GENERAL CONTRACTOR SHALL BE PRESENT AT ALL INSPECTIONS. <br />18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAI NING THE SIGNED AND STAMPED PERMIT SET OF <br />DRAWINGS, BUILDING PERMIT(S), INSPECTION CARD(S), AND OTHER REQUIRED DOCUMENTATION SAFELY <br />ON SITE AND IN GOOD CONDITION. <br />19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARI NG AND FILING THE CERTIFICATE OF SUBSTANTIAL <br />COMPLETION (AIA DOCUMENT G-704) AND FOR FILING FOR THE CERTIFICATE OF OCCUPANCY (C of O) AT <br />THE APPROPRIATE TIMES IN THE CONSTRUCTION SEQUENCE. IF THE OWNER REQUIRES A TEMPORARY <br />CERTIFICATE OF OCCUPANCY (TCO), THEN THE CONTRACTOR SHALL BE RESPONSIBLE FOR FILING FOR THE <br />TCO. <br />20. THE GENERAL CONTRACTOR SHALL FURNISH TO THE OWNER CERTIFICATIONS OF COMPLIANCE WITH CITY <br />REQUIREMENTS FROM THE LOCAL JURISDICTION'S ELECTRICAL INSPECTOR, PLUMBING INSPECTOR, FIRE <br />INSPECTOR, BUILDING INSPECTOR & HEALTH INSPECTOR. <br />21. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARI NG A SCHEDULE FOR THE CONSTRUCTION OF THE <br />PROJECT AND SUBMITTING THE SCHEDULE TO THE OWNER, ARCHITECT AND CONSTRUCTION MANAGER <br />FOR REVIEW AND APPROVAL. THE SCHEDULE SHALL BE SUBMITTED PRIOR TO THE COMMENCEMENT OF ON- <br />SITE CONSTRUCTION ACTIVITIES, OR BEFORE SUBMITTING ANY APPLICATIONS FOR PAYMENT, WHICHEVER <br />COMES FIRST. THE CONTRACTOR SHALL UPDATE THE SCHEDULE ON A REGULAR BASIS (EVERY 4 WEEKS OR <br />LESS) TO REFLECT THE ACTUAL PROGRESS OF THE WORK. SCHEDULE UPDATES SHALL IDENTIFY CHANGES IN <br />MILESTONES RELATIVE TO THE PRECEDING VERSION OF THE SCHEDULE. <br />22. AT EACH REGULARLY SCHEDULED, ON-SITE OWNER/CONTRACTOR/ARCHITECT MEETING THE <br />CONTRACTOR SHALL PROVIDE AND DISTRIBUTE A 2-WEEK LOOK AHEAD SCHEDULE OF THE PROJECTED <br />CONSTRUCTION ACTIVITIES OVER THE IMMEDIATELY FORTHCOMING 2-WEEK PERIOD. REVIEW OF THE 2- <br />WEEK LOOK AHEAD SCHEDULE WILL BE INCLUDED IN THE AGENDA OF EACH MEETING. <br />23. THE CONTRACTOR SHALL PROVIDE THE OWNER WITH A LIST OF SUBCONTRACTORS, INCLUDING ALL TIERS <br />OF SUBCONTRACTORS, PRIOR TO THE COMMENCEMENT OF ON-SITE CONSTRUCTION ACTIVITIES, OR <br />BEFORE SUBMITTING ANY APPLICATIONS FOR PAYMENT, WHI CHEVER COMES FIRST. <br />24. ALL WORK, MATERIALS, EQUIPMENT AND ASSEMBLIES INDICATED IN THE CONSTRUCTION DOCUMENTS <br />SHALL BE NEW, UNLESS SPECIFICALLY NOTED OTHERWISE. ALL WORK SHALL CONFORM TO THE DRAWINGS <br />AND SPECIFICATIONS AND SHALL BE OF THE BEST QUALITI ES OF THE KINDS SPECIFIED. <br />25. THE CONTRACTOR SHALL NOT MAKE ANY MATERIALS SUBSTITUTIONS OF THEIR OWN ACCORD. ALL <br />REQUESTS FOR MATERIALS SUBSTITUTIONS SHALL BE SUBMI TTED TO THE ARCHITECT WITH SUFFICIENT <br />DOCUMENTATION AND SAMPLES FOR THE ARCHITECT TO DETERMINE WHETHER, OR NOT, THE PROPOSED <br />SUBSTITUTION IS EQUAL TO THE SPECIFIED PRODUCT, MATERIAL, EQUIPMENT, ASSEMBLY, ETC. ALL REQUESTS <br />FOR MATERIALS SUBSTITUTION SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW AND APPROVAL <br />BEFORE THE PROPOSED SUBSTITUTION IS REQUIRED ON SITE FOR INCORPORATION INTO THE <br />CONSTRUCTION. <br />26. ALL MATERIALS, EQUIPMENT AND ASSEMBLIES SHALL BE SUPPLIED, DELIVERED, STORED AND INSTALLED, <br />CONNECTED, ERECTED, CLEANED, AND CONDITIONED AS DIRECTED BY THE MANUFACTURER'S <br />SPECIFICATIONS AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY STANDARDS. <br />27. SHOP DRAWINGS, SAMPLES AND/OR OTHER SUBMITTALS SHALL BE SUBMITTED BY THE CONTRACTOR TO THE <br />ARCHITECT FOR REVIEW AND APPROVAL BEFORE ORDERING OR PURCHASING MATERIALS OR STARTING <br />THE ASSOCIATED CONSTRUCTION. THE ARCHITECT SHALL BE PROVIDED WITH SUFFICIENT TIME TO REVIEW <br />THE SHOP DRAWINGS, SAMPLES AND/OR OTHER SUBMITTALS WITHOUT AFFECTING THE CONTRACTOR'S <br />PACE OF CONSTRUCTION. <br />28. A SUFFICIENT NUMBER OF COPIES OF SHOP DRAWINGS AND OTHER WRITTEN SUBMITTALS SHALL BE <br />PROVIDED SO THAT ONE (1) COPY EACH MAY BE RETAINED BY THE ARCHITECT AND OTHER PROJECT <br />CONSULTANTS THAT WILL REVIEW THE DOCUMENTS, PLUS A SUFFICIENT NUMBER OF COPIES TO BE <br />RETURNED TO THE CONTRACTOR TO MAINTAIN A COPY IN THE ON-SITE FIELD OFFICE, TO PROVIDE A <br />RECORD COPY IN THE CONTRACTOR'S BUSINESS OFFICE AND TO RETURN COPIES TO THE <br />SUBCONTRACTOR(S) WHO INITIALLY PROVIDED THE DOCUMENTS. <br />29. AT LEAST THREE (3) COPIES OF EACH SAMPLE SHALL BE SUBMITTED. THE ARCHITECT WILL RETAIN ONE COPY <br />OF EACH SAMPLE AND THE CONTRACTOR SHALL MAINTAIN AT LEAST ONE COPY ON THE ON-SITE FIELD <br />OFFICE. ADDITIONAL COPIES OF SAMPLES MAY BE REQUIRED IF PROJECT CONSULTANTS AND/OR THE <br />CONTRACTOR REQUIRES ADDITIONAL STAMPED COPIES. <br />30. MOCK-UPS WHERE REQUIRED FOR THE PROJECT, THE CONTRACTOR SHALL CONSTRUCT THE MOCK-UP IN A <br />MANNER TO ADEQUATELY ASSESS THE SYSTEMS AND/OR FINI SHES BEING MOCKED-UP. WHEN AN <br />ACCEPTABLE MOCK-UP HAS BEEN CONSTRUCTED THE ARCHITECT WILL NOTE APPROVAL WITH AN <br />ANNOTATION ON THE MOCK-UP. THE CONTRACTOR SHALL PHOTOGRAPH THE MOCK-UP AND <br />ANNOTATION(S) AND DISTRIBUTE COPIES OF THE PHOTOGRAPHS TO THE ARCHITECT, OWNER AND <br />ASSOCIATED SUBCONTRACTOR(S) FOR RECORD PURPOSES. THE MOCK-UP SHALL REMAIN ON-SITE UNTIL <br />THE ASSEMBLY AND/OR FINISHES HAVE BEEN IMPLEMENTED INTO THE BUILDING CONSTRUCTION AND THE <br />ARCHITECT CAN COMPARE THE APPROVED MOCK-UP TO THE I MPLEMENTED CONSTRUCTION. <br />31. THE CONTRACTOR SHALL NOT BE RELIEVED OF RESPONSIBILITY FOR DEVIATIONS FROM REQUIREMENTS OF <br />THE CONTRACT DOCUMENTS BY THE ARCHITECT'S REVIEW OF SHOP DRAWINGS, PRODUCT DATA, SAMPLES <br />OR SIMILAR SUBMITTALS UNLESS THE CONTRACTOR HAS SPECIFICALLY INFORMED AND OBTAINED WRITTEN <br />APPROVAL FROM THE ARCHITECT. THE CONTRACTOR SHALL NOT BE RELIEVED OF RESPONSIBILITY FOR <br />ERRORS OR OMISSIONS IN SHOP DRAWINGS, PRODUCT DATA, SAMPLES OR SIMILAR SUBMITTALS BY THE <br />ARCHITECT'S REVIEW THEREOF. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR PROVIDING A <br />COMPLETE INSTALLATION OF ELEMENTS WHETHER OR NOT THE SHOP DRAWINGS HAVE BEEN REVIEWED BY <br />THE ARCHITECT. <br />32. NOTIFY OWNER OF NON-AVAILABILITY OF SPECIFIED M ATERIALS AT THE TIME OF BIDDING. IF NO <br />NOTIFICATION IS GIVEN, IT WILL BE ASSUMED THAT MATERIALS ARE AVAILABLE, IN AN APPROPRIATELY <br />TIMELY MANNER. <br />33. THE CONTRACTOR SHALL OPERATE AND MAINTAIN AN ON-SITE CONSTRUCTION FIELD OFFICE WHICH <br />SHALL INCLUDE A TELEPHONE, FAX MACHINE AND INTERNET CONNECTION FOR THE DURATION OF <br />CONSTRUCTION. THE TELEPHONE NUMBER(S), FAX NUMBER(S) AND EMAIL ADDRESSES FOR THE <br />CONTRACTOR'S FIELD PERSONNEL SHALL BE PROVIDED TO THE OWNER AND ARCHITECT. <br />34. THE CONTRACTOR SHALL NOT BE PERMITTED TO UTILIZE ANY COMPLETED SPACE WITHIN THE PROJECT FOR <br />ANY CONSTRUCTION PURPOSES. <br />35. AT NO TIME DURING THE CONSTRUCTION SHALL THE CONTRACTOR NOR ANY SUB-CONTRACTORS, <br />INCLUDING LABORERS, JOURNEYMAN, TRADESMEN, OFFICE STAFF, ETC. BE PERMITTED TO USE ANY OF THE <br />TOILET FACILITIES IN THE BUILDING BEING CONSTRUCTED, NOR IN OTHER FACILITIES EXISTING ON SITE. <br />36. ALL CONSTRUCTION PERSONNEL SHALL CARRY PROPER I DENTIFICATION AT ALL TIMES THEY ARE ON SITE. <br />37. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR JOB SI TE SAFETY AND SHALL ASSURE THAT ALL TIERS OF <br />WORKERS ARE FOLLOWING THE REQUISITE SAFETY PROTOCOLS. THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR ENFORCING THE SAFETY PROTOCOLS WHICH ALSO INCLUDES HAVING REMOVED FROM THE SITE <br />MATERIALS, EQUIPMENT, TOOLS AND WORKERS THAT ARE NOT IN CONFORMANCE WITH THE SAFETY <br />PROTOCOLS. <br />38. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MAINTAINING A NEAT, CLEAN AND ORDERLY JOB SITE AND <br />THE WORK AREAS THEREIN. THE CONTRACTOR SHALL CLEAN UP AND HAVE REMOVED FROM THE PREMISES <br />ALL CONSTRUCTION WASTE AND TRASH, RUBBISH, WRAPPINGS, SALVAGES, SPOILS AND OTHER DEBRIS AS <br />GENERATED BY THE CONSTRUCTION ACTIVITIES AND SHALL BE DISPOSED OF OFF-SITE IN A MANNER AND <br />FACILITY CONSISTENT WITH THE REQUIREMENTS OF THE LOCAL JURISDICTION.. <br />39. CLEANING OF TOOLS AND EQUIPMENT SHALL ONLY OCCUR IN DESIGNATED AREAS SET ASIDE BY THE <br />CONTRACTOR AND ADEQUATELY PROTECTED TO PREVENT STAI NING OR OTHER DAMAGE TO EXISTING <br />FACILITIES AND SURFACES ON THE PROPERTY. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER TO <br />SPECIFY A LOCATION FOR CLEANING PURPOSES THAT IS ACCEPTABLE TO THE OWNER. <br />40. BARRICADES SHALL BE ERECTED PER LOCAL JURISDICTION REQUIREMENTS AND AS REQUIRED FOR <br />SECURITY. <br />41. ALL CONCEALED PLYWOOD AND WOOD BLOCKING SHALL BE TREATED TO MEET LOCAL FIRE DEPARTMENT <br />REQUIREMENTS FOR FLAMMABILITY. <br />42. GENERAL CONTRACTOR TO WARRANTY ALL LABOR, EQUIPMENT, MATERIALS AND ASSEMBLIES OR A <br />PERIOD OF NOT LESS THAN ONE (1) YEAR FROM THE DATE OF THE CERTIFICATE OF OCCUPANCY. <br />43. GENERAL CONTRACTOR SHALL, UPON PROJECT COMPLETION, SUBMIT A MARKED-UP SET OF AS-BUILTS TO <br />THE OWNER VIA THE ARCHITECT. <br />44. WINDOWS ARE TO BE KEPT CLOSED IN THE WORK AREAS. WORKERS ARE NOT TO UTILIZE INSTALLED <br />WINDOWS TO ENTER OR EXIT AREAS OF THE BUILDINGS. <br />45. FIRE EXITS SHALL BE MAINTAINED CLEAR AND ACCESSIBLE AT ALL TIMES. <br />46. FIRE EXTINGUISHERS WITH THE APPROPRIATE RATING(S) SHALL BE MAINTAINED BY THE CONTRACTOR ON <br />SITE AT ALL TIMES DURING CONSTRUCTION. <br />47. THE CONTRACTOR SHALL BE RESPONSIBLE FOR A THOROUGH TERMINAL CLEANING OF THE PROJECT AT <br />THE END OF CONSTRUCTION. THE TERMINAL CLEAN INCLUDES, BUT IS NOT LIMITED TO, CLEANING OF <br />WINDOWS, VACUUMING ALL CARPETS, CLEANING CABINETRY INSIDE AND OUT, CLEANING FLOOR AND <br />WALL TILE AND LINOLEUM FLOORING, PRESSURE WASHING EXTERIOR FLAT WORK, ETC. <br />48. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING ALL ON-SITE AND OFF-SITE DAMAGES <br />CAUSED BY SUBCONTRACTORS AND NO ADDITIONAL COST TO THE OWNER, AND NO ADDITIONAL TIME TO <br />THE CONSTRUCTION CONTRACT. <br />49. TEMPORARY AIR FILTERS SHALL BE USED AND REPLACED WITH CLEAN UNUSED FILTERS AT LEAST 24 HOURS <br />BEFORE FINAL PUNCH LIST. <br />50. FIRE EXTINGUISHERS: RECESSED FIRE EXTINGUISHER CABINETS SUPPLIED WITH NEW FIRE EXTINGUISHERS <br />SHALL BE PROVIDED AND INSTALLED IN THE NECESSARY QUANTITIES TO CONFORM WITH THE <br />REQUIREMENTS OF UFC STANDARD 10-1. COORDINATE WITH THE FIRE INSPECTOR FOR PREFERRED <br />LOCATIONS FOR PLACEMENT OF THE FIRE EXTINGUISHERS PRIOR TO INSTALLATION OF THE CABINETS. <br />51. PLACEMENT OF ALL PARTITIONS SHALL BE APPROVED I N THE FIELD BY THE ARCHITECT'S REPRESENTATIVE <br />PRIOR TO THE INSTALLATION OF THE PARTITIONS. <br />52. LAYOUT OF PARTITIONS SHALL START AT CONDITIONS WHERE ALIGNMENT OF THE PARTITIONS WITH WALLS, <br />OR EXISTING CONSTRUCTION IS INDICATED ON THE DRAWINGS. <br />53. PARTITIONS ARE TYPICALLY DIMENSIONED FROM FACE OF STUD, UNLESS NOTED OTHERWISE. <br />54. ALL METAL TRIMS ON GYPSUM BOARD PARTITIONS SHALL BE TYPE #200 SERIES AS MANUFACTURED BY U.S. <br />GYPSUM, OR EQUAL. <br />55. ALL GYPSUM BOARD SHALL BE INSTALLED VERTICALLY, IN FULL LENGTH SECTIONS. <br />56. GYPSUM BOARD AT TOILETS, AROUND SINKS, AROUND SHOWERS AND BATH TUBS SHALL BE WATER <br />RESISTANT TYPE. CEILINGS IN BATHROOMS SHALL ALSO BE CONSTRUCTED OF WATER RESISTANT GYPSUM <br />BOARD. <br />57. GYPSUM BOARD SHALL BE PROPERLY TAPED, COVERED WITH JOINT COMPOUND AND SANDED SMOOTH. <br />THE GYPSUM BOARD INSTALLATION SHALL BE INSPECTED FOR IMPERFECTIONS AFTER APPLICATION OF THE <br />FIRST COAT OF PRIMER. ANY OBSERVED IMPERFECTIONS SHALL BE PROPERLY REPAIRED BEFOR APPLYING <br />ANY FURTHER COATS OF PAINT. <br />58. PROVIDE AND INSTALL ACCESS DOORS FOR CONCEALED VALVES, J—BOXES, FIRE DAMPERS, ETC. AS <br />REQUIRED TO ACCESS CONTROLS OR EQUIPMENT. ACCESS DOOR LOCATIONS SHALL BE APPROVED BY THE <br />ARCHITECT PRIOR TO INSTALLING ANY ACCESS DOORS. <br />59. INTERIOR DOORS SHALL BE UNDERCUT TO 1/2" A.F.F., UNLESS NOTED OTHERWISE. <br />60. DOORS SHALL HAVE DOOR STOPS AND SILENCERS. DOOR STOPS SHALL BE FLOOR MOUNTED, UNLESS <br />NOTED OTHERWISE IN HARDWARE SPECIFICATIONS. <br />61. ALL EXTERIOR WALL DOORS (TO CONDITIONED SPACES) SHALL BE FULLY AND PROPERLY SEALED TO <br />PREVENT AIR INFILTRATION. <br />62. ALL EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL <br />KNOWLEDGE OR EFFORT. <br />63. INTERIOR AND EXTERIOR DOOR THRESHOLDS SHALL NOT EXCEED 1/2" IN HEIGHT (UNLESS SPECIFICALLY <br />DETAILED OTHERWISE). <br />64. FIRE BLOCKING SHALL BE PROVIDED AND INSTALLED AS REQUIRED BY CODE IN WALLS, PARTITIONS, <br />FLOORS AND CEILINGS. <br />65. BLOCKING SHALL BE PROVIDED IN WALLS AS REQUIRED TO SUPPORT CABINETRY, GRAB BARS, WALL <br />MOUNTED EQUIPMENT, ETC. <br />66. WHERE GLAZED PARTITIONS AND SLIDING DOORS ARE TO BE INSTALLED, CONTRACTOR SHALL VERIFY THAT <br />THE FLOOR IS LEVEL AND, IF NOT, MAKE THE NECESSARY CORRECTIONS TO THE FLOOR TO MAKE IT LEVEL <br />(AT NO ADDITIONAL COST TO THE OWNER). <br />67. ALL SURFACES OR FINISHES, IF DAMAGED DURING ANY STAGE OF THE CONSTRUCTION, SHALL BE REPAIRED <br />OR REPLACED TO "LIKE NEW" CONDITION AT NO EXPENSE TO THE OWNER. <br />68. THIS PROJECT PREFERS TO PURCHASE PRODUCTS THAT CONTAIN TROPICAL WOOD ONLY IF THEY ARE <br />CERTIFIED ACCORDING TO THE GUIDELINES OF THE FOREST STEWARDSHIP COUNCIL (FSC). THE <br />CONTRACTOR SHALL PROVIDE THE COUNTRY OF MANUFACTURE OF EACH PRODUCT TO BE SUPPLIED FOR <br />THIS PROJECT. ALSO, THE CONTRACTOR SHALL PROVIDE A LISTING TO THE OWNER OF ALL FSC CERTIFIED <br />PRODUCTS THAT WILL BE SUPPLIED TO THIS PROJECT. <br />THE FOLLOWING ARE MINIMUM STANDARDS FOR COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT <br />(ADA) AND ACCESS TO BUILDINGS BY PHYSICALLY DISABLED PERSONS. GENERAL CONTRACTOR SHALL <br />COMPLY WITH THESE MINIMUM STANDARDS UNLESS NOTED AND/OR DETAILED OTHERWISE WITHIN THIS <br />CONSTRUCTION DOCUMENT SET. WHERE CONFLICTS OCCUR, THE MOST STRINGENT REQUIREMENTS SHALL <br />TAKE PRECEDENCE. <br />1. GROUND FLOOR SURFACES ALONG ACCESSIBLE ROUTES AND IN ACCESSIBLE ROOMS AND SPACES, <br />INCLUDING FLOORS, WALLS, RAMPS, STAIRS, AND CURB RAMPS, SHALL BE STABLE, FIRM, AND SLIP <br />RESISTANT. <br />2. WALKS AND SIDEWALKS SHALL HAVE A CONTINUOUS COMMON SURFACE NOT INTERRUPTED BY STEPS OR <br />BY ABRUPT CHANGES IN LEVEL EXCEEDING 1/2-INCH. <br />3. WHEN ABRUPT CHANGES IN LEVEL NOT EXCEEDING 1/2-I NCH OCCUR, THEY SHALL BE BEVELED WITH A <br />SLOPE NO GREATER THAN 1:2 EXCEPT THAT LEVEL CHANGE NOT EXCEEDING 1/4-INCH MAY BE VERTICAL. <br />4. ANY ABRUPT CHANGE IN LEVEL ALONG ANY ACCESSIBLE ROUTE EXCEEDING 1/2-INCH SHALL COMPLY <br />WITH THE REQUIREMENTS FOR RAMPS. <br />5. WALKS AND SIDEWALKS SHALL BE 48" MINIMUM IN WIDTH. <br />6. WALKS AND SIDEWALK SURFACES SHALL BE SLIP-RESISTANT AS FOLLOWS: a) SURFACES WITH A SLOPE OF <br />LESS THAN 6% GRADIENT SHALL BE AT LEAST AS SLIP-RESISTANT AS THAT DESCRIBED AS A MEDIUM SALTED <br />FINISH; AND b) SURFACES WITH A SLOPE OF 6% OR GREATER GRADIENT SHALL BE SLIP-RESISTANT. <br />7. WHEN THE SLOPE IN THE DIRECTION OF TRAVEL OF ANY WALK EXCEEDS 1 VERTICAL TO 20 HORIZONTAL, IT <br />SHALL COMPLY WITH THE PROVISIONS OF SECTION 1133B.5 AS A PEDESTRIAN RAMP. <br />8. WALKS AND SIDEWALKS SURFACES CROSS SLOPES SHALL NOT EXCEED 1/4-INCH PER FOOT EXCEPT WHEN <br />THE ENFORCING AGENCY FINDS THAT DUE TO LOCAL CONDITIONS IT CREATES AN UNREASONABLE <br />HARDSHIP, THE CROSS SLOPE CAN BE INCREASED TO A MAXIMUM OF 1/2-INCH PER FOOT FOR A DISTANCE <br />NOT TO EXCEED 20-FEET. <br />9. ALL WALKS WITH CONTINUOUS GRADIENTS SHALL HAVE LEVEL AREAS AT LEAST 5 FEET IN LENGTH AT <br />INTERVALS OF AT LEAST EVERY 400 FEET. <br />10. WALKS SHALL BE CONSTRUCTED WITH ANY SLOPE NOT TO EXCEED 1/4-INCH/FOOT (2%) IN ANY DIRECTION <br />OVER AN AREA NOT LESS THAN 60" BY 60" AT A DOOR OR GATE THAT SWINGS TOWARDS THE WALK, AND <br />NOT LESS THAN 48" WIDE BY 44" DEEP AT A DOOR OR GATE THAT SWINGS AWAY FROM THE WALK. <br />11. WALKS, SIDEWALKS, AND PEDESTRIAN WAYS SHALL BE FREE OF GRATINGS WHENEVER POSSIBLE. FOR <br />GRATINGS LOCATED IN THE SURFACE OF ANY OF THESE AREAS, GRID OPENING IN GRATINGS SHALL BE <br />LIMITED TO 1/2" IN THE DIRECTIONS OF TRAFFIC FLOW. IF GRATINGS HAVE ENLONGED OPENINGS, THEY <br />SHALL BE PLACED SO THAT THE LONG DIMENSION IS PERPENDICULAR TO THE DOMINANT DIRECTION OF <br />TRAVEL. <br />12. THE ACCESSIBLE ROUTE OF TRAVEL SHALL BE THE MOST PRACTICAL DIRECT ROUTE BETWEEN ACCESSIBLE <br />BUILDING ENTRANCES, ACCESSIBLE SITE FACILITIES, AND THE ACCESSIBLE ENTRANCE TO THE SITE. <br />13. THE RUNNING SLOPE OF SIDEWALKS SHALL NOT EXCEED THE GENERAL GRADE ESTABLISHED FOR THE <br />ADJACENT STREET OR HIGHWAY. <br />14. THE CLEAR WIDTH OF WALKING SURFACES SHALL BE 36" MIN. THE CLEAR WIDTH OF CORRIDORS SERVING <br />OCCUPANT LOADS OF 10 OCCUPANTS OR MORE SHALL BE 44 INCHES MIN. <br />15. AISLE WIDTH SERVING ONE SIDE SHALL BE 36" MIN. AISLE WIDHT SERVING TWO SIDES SHALL BE 44 IN MIN. <br />16. AN ACCESSIBLE ROUTE WITH A CLEAR WIDTH LESS THAN 60 INCHES SHALL PROVIDE PASSING SPACES AT <br />INTERVALS OF 200 FEET MAX. PASSING SPACE SHALL BE EITHER 60"X60" MIN. OR INTERSECTION OF TWO <br />WALKING SURFACES PROVIDING A T-SHAPE SPACE COMPLYING WITH CBC SECTION 11B-304.3.2. WHERE <br />THE BASE AND ARMS OF THE T-SHAPE EXTEND 48" MIN BEYOND THE INTERSECTION. <br />17. ABRUPT CHANGES IN LEVEL EXCEEDING 4 INCHES IN A VERTICAL DIMENSION BETWEEN WALKS, SIDEWALKS <br />OR OTHER PEDESTRIAN WAYS AND ADJACENT SURFACES OR FEATURES SHALL BE IDENTIFIED BY WARNING <br />CURBS AT LEAST 6 INCHES IN HEIGHT ABOVE THE WALKING SURFACES. <br />18. EDGE PROTECTION SHALL BE PROVIDED ON EACH SIDE OF THE RAMP RUN AND AT EACH SIDE OF THE <br />RAMP LANDING. WHERE THE RAMP SURFACE IS NOT BOUNDED BY A WALL, THE RAMP SHALL HAVE A CURB <br />AT MINIMUM OF 2 INCHES IN HEIGHT OR A BARRIER THAT PREVENTS TEH PASSAGE OF A 4" DIAMETER <br />SPHERE WITHIN A 4" OF THE FINISH FLOOR. <br />GENERAL ACCESSIBLE PATH OF TRAVEL NOTES <br />GENERAL NOTESGENERAL NOTES <br />SHEET: <br />CHECKED BY: <br />PROJECT NUMBER: <br />PHASE: <br />DATE: <br />DRAWN BY: <br />DRAWING TITLE: <br />CLIENT: <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />F <br />O <br />R <br />: <br />CONSULTANT: <br />PROFESSIONAL SEAL: <br />560 N Western Ave, Floor 2 <br />Los Angeles, CA 90004 <br />562-498-2400 TEL. <br />323-499-1647 FAX <br />www.klugerarchitects.com <br />KL <br />U <br />G <br />E <br />R <br /> <br />A <br />R <br />C <br />H <br />I <br />T <br />E <br />C <br />T <br />S <br /> <br />E <br />X <br />P <br />R <br />E <br />S <br />S <br />L <br />Y <br /> <br />R <br />E <br />S <br />E <br />R <br />V <br />E <br />S <br /> <br />A <br />L <br />L <br /> <br />C <br />O <br />M <br />M <br />O <br />N <br /> <br />L <br />A <br />W <br /> C <br />O <br />P <br />Y <br />R <br />I <br />G <br />H <br />T <br /> <br />A <br />N <br />D <br /> <br />P <br />R <br />O <br />P <br />E <br />R <br />T <br />Y <br /> <br />R <br />I <br />G <br />H <br />T <br />S <br /> <br />I <br />N <br /> <br />T <br />H <br />E <br />S <br />E <br /> <br />P <br />L <br />A <br />N <br />S <br />. <br /> <br />T <br />H <br />E <br />S <br />E <br />P <br />L <br />A <br />N <br />S <br /> <br />A <br />R <br />E <br /> <br />N <br />O <br />T <br /> <br />T <br />O <br /> <br />B <br />E <br /> <br />R <br />E <br />P <br />R <br />O <br />D <br />U <br />C <br />E <br />D <br />, <br /> <br />C <br />H <br />A <br />N <br />G <br />E <br />D <br /> <br />O <br />R <br /> <br />C <br />O <br />P <br />I <br />E <br />D <br /> I <br />N <br /> <br />A <br />N <br />Y <br /> <br />F <br />O <br />R <br />M <br /> <br />O <br />R <br /> <br />M <br />A <br />N <br />N <br />E <br />R <br /> <br />W <br />H <br />A <br />T <br />S <br />O <br />E <br />V <br />E <br />R <br />, <br /> <br />N <br />O <br />R <br /> <br />A <br />R <br />E <br /> <br />T <br />H <br />E <br />Y <br /> <br />T <br />O <br /> <br />BE <br /> <br />A <br />S <br />S <br />I <br />G <br />N <br />E <br />D <br /> <br />T <br />O <br /> <br />A <br />N <br />Y <br /> <br />T <br />H <br />I <br />R <br />D <br /> <br />P <br />A <br />R <br />T <br />Y <br /> <br />W <br />I <br />T <br />H <br />O <br />U <br />T <br /> <br />F <br />I <br />R <br />S <br />T <br /> <br />O <br />B <br />T <br />A <br />I <br />N <br />I <br />N <br />G <br /> <br />T <br />H <br />E <br /> <br />E <br />X <br />P <br />R <br />E <br />S <br />S <br /> <br />W <br />R <br />I <br />T <br />T <br />E <br />N <br /> <br />P <br />E <br />R <br />M <br />I <br />S <br />S <br />I <br />O <br />N <br /> <br />A <br />N <br />D <br /> <br />C <br />O <br />N <br />S <br />E <br />N <br />T <br /> <br />O <br />F <br /> <br />K <br />LU <br />G <br />E <br />R <br /> <br />A <br />R <br />C <br />H <br />I <br />T <br />E <br />C <br />T <br />S <br />. <br />Kluger <br />Printed:This drawing sheet is 30"x42" @ Full Size 1inch @ Full Size <br />AINROFILACFOETATS <br />RENEWAL <br />DATE <br />TCETIHCRADESNECIL <br />No. C 24283 <br />CHA <br />RLES EDWARD <br />KLUGER <br />PROFESSIONAL SEAL: <br />REVISIONS SCHEDULE <br />3/10/2025 5:28:56 PM <br />C: <br />\ <br />U <br />s <br />e <br />r <br />s <br />\ <br />j <br />o <br />n <br />a <br />t <br />e <br />\ <br />D <br />r <br />o <br />p <br />b <br />o <br />x <br />\ <br />P <br />r <br />o <br />j <br />e <br />c <br />t <br />s <br />\ <br />0 <br />0 <br />0 <br /> <br />P <br />r <br />e <br />- <br />P <br />r <br />o <br />j <br />e <br />c <br />t <br />s <br />\ <br />2 <br />5- <br />W <br />I <br />P <br /> <br />C <br />S <br />A <br />\ <br />M <br />e <br />d <br />t <br />r <br />o <br />n <br />i <br />c <br /> <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />\ <br />2 <br />3 <br />- <br />1 <br />1 <br />4 <br /> <br />M <br />e <br />d <br />t <br />r <br />o <br />n <br />i <br />c <br /> <br />S <br />a <br />n <br />t <br />a <br />A <br />n <br />a <br />- <br />S <br />t <br />r <br />u <br />c <br />t <br />u <br />r <br />a <br />l <br /> <br />R <br />e <br />t <br />r <br />o <br /> <br />A <br />D <br />A <br />. <br />r <br />v <br />t <br />A002 <br />CK <br />JE <br />3/10/25 <br />PC1 <br />WIP <br />GENERAL NOTES <br />ME <br />D <br />T <br />R <br />O <br />N <br />I <br />C <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />18 <br />5 <br />1 <br /> <br />E <br /> <br />D <br />E <br />E <br />R <br />E <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />PU <br />R <br />L <br />I <br />N <br /> <br />S <br />T <br />R <br />E <br />N <br />G <br />T <br />H <br />E <br />N <br />I <br />N <br />G <br />M <br />E <br />D <br />T <br />R <br />O <br />N <br />I <br />C <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br /> <br />P <br />U <br />R <br />L <br />I <br />N <br /> <br />S <br />T <br />R <br />E <br />N <br />G <br />T <br />H <br />E <br />N <br />I <br />N <br />G <br /> <br />W <br />I <br />P <br />09-25 <br />MEDTRONIC, INC. <br />10 MEDTRONIC <br />PARKWAY NE <br />MINNEAPOLIS, MN <br />55432 <br />3/10/25 PC 1 SUBMITTAL <br />1851 E Deere <br />Ave-Purlins4/8/2025