My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1034 W Camden Pl - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Camden Pl
>
1034 W Camden Pl
>
1034 W Camden Pl - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2025 10:13:18 PM
Creation date
6/15/2025 12:44:02 PM
Metadata
Fields
Template:
Plan
Permit Number
101122315
Full Address
1034 W Camden Pl
Street Number
1034
Street Direction
W
Street Name
Camden
Street Suffix
Pl
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CASTILLO ENGINEERING, INC.Project CAMDEN <br />1147 E. Market Street <br />Long Beach, CA 90805 <br />Engr.Date:Job No.24-462 Sheet <br />12.83ft 2.67ft <br />Tag <br />Beam 5 <br /> L = 15.50 ft <br />Member= 6x12 A = 63.25 in^2 <br /> S = 121.2 in^3 <br />No. of members= 1 I = 697.1 in^4 5.22 <br />CD= 1.25 E = 1,600,000 psi <br />CF= 1.00 Va = 7.168 kips <br /> CV= 1.00 Ma = 13.638 k-ft <br />Cr= 1.00 <br /> <br />Total Load L/n= 180 <br />Live Load L/n= 240 <br />L= 15.5 ft <br /> <br /> <br />1.26 4.69 <br />Uniform load (W1) <br />D L Trib <br />w1,1 (15 +20) x 1.33 = 19.95 + 26.6 Roof <br />w1,2 (16 +0) x 0 = 0 + 0 Wall <br />w1,3 (15 +40) x 0 = 0 + 0 Floor <br />w1,4 (15 +60) x 0 = 0 + 0 Balcony / Deck <br />w1,5 (5 +20) x 0 = 0 + 0 Ceiling <br />W1 = 19.95 + 26.6 =0.047 klf <br />Triangular load (W2) <br />D L Trib ` <br />w2,1 (0 +0) x 0 = 0 + 0 <br />w2,2 (0 +0) x 0 = 0 + 0 <br />w2,3 (0 +0) x 2 = 0 + 0 <br />w2,4 (0 +0) x 0 = 0 + 0 <br />w2,5 (0 +0) x 4 = 0 + 0 <br />W2 = 0 + 0 =0.000 klf <br />Point Load (P1) <br />D L Trib.1 Trib.2 TAG: <br />p1,1 (+ )x 0.00 x 0.00 = 0 + 0 0 <br />p1,2 (+) x 0 x 0 = 0 + 0 0 <br />p1,3 (+) x 0 x 0 = 0 + 0 0 <br />p1,4 (+) x 0 x 0 = 0 + 0 <br />p1,5 (+) x 0 x 0 = 0 + 0 X1 (ft) X2 (ft) <br />P1 = 0 + 0 =0.00 kips 0 15.5 <br />Point Load (P2) <br />D L Trib.1 Trib.2 TAG: <br />p2,1 (822.85 + 1097.14) x 1 x 1 = 822.85 + 1097.1 0 <br />p2,2 (822.85 + 1097.14) x 1 x 1 = 822.85 + 1097.1 0 <br />p2,4 (593.43 + 791.25) x 1 x 1 = 593.43 + 791.25 0 <br />p2,4 (+) x 0 x 0 = 0 + 0 <br />p2,5 (+) x 0 x 0 = 0 + 0 X3 (ft) X4 (ft) <br />P2 = 2239.1 + 2985.5 =5.22 kips 12.8 2.67 <br />Shear <br />R1= 1.261 kips <br />R2= -4.685 kips Stress Ratio <br />Vmax= 4.69 kips Vallow.=8.96 x 1 = 8.9604 kips OK .52 <br />Flexure <br />M= 12.264 k-ft Mallow.=17.05 x 1 = 17.048 k-ft OK .72 <br />Deflection <br />D =D w1 + Dw2 + D p1 +Dp2 <br />D (D+L)= 0.054 + 0.000 + 0.000 + 0.318 = 0.37 = L < L OK deflection:.36 <br /> 501 180 <br />0.054 + 0.318 <br />D (L Only)= 0.031 + 0 + 0 + 0.18193478 = 0.21 = L L OK deflection:.27 <br />874 240 <br />USE:1- 6X12 <br />shear: <br />7/22/24 12:00 AM <br />B2 <br />0 <br />0 <br />0 <br />0 <br />flexure: <br />0 <br />21
The URL can be used to link to this page
Your browser does not support the video tag.