Laserfiche WebLink
-,-SANIA <br />ANA <br />P[l\\l\c <br />IIULDIIC <br />ICI\II <br />Planning & Building'Agenc! <br />Building Safety Division <br />20 Civic Center Plaza <br />P.o. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-s8oo <br />www.santa-ana.org soL-01 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall fill in the address of the proiect, contractor's <br />licensing information and answer questions 1 -10 below. Complete and sign the certification section*lf answering NO to any of the questions, plan check shall be required.** <br />Proj ect Address: 6t it wFsrrRTRFr r A COI IR]'SANTA ANA 'A <br />g?7O1 <br />Contractor Company Name: SREP ELEC'IRIC <br />Contractor License Number: 972048 C 46 and C-10 <br />YES NO Are the following applicable to the proposed project? <br />Will the PV anay be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 3 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to l0" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV system layout provide a three-foot wide clear access pathway per the <br />latest edition of "Guideline for Fire Safety Elements of Solar Photovoltalc Systems" <br />utr <br />2 <br />3 <br />x tr <br />trx <br />4 trtr <br />trtr <br />6 trtr <br />7 tr <br />by OCFA? (Guideline available on the OCFA website: http://www.ocfa.orq) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum of 2-112 inch lag screw embedment into roof rafters? <br />Are ALL the structural pages of the plans WET stamped and signed by a Califomia <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />I certify under paralty of peAury <br />Printname: 1)osU ?*- <br />unde <br />()(,t <br />r the laws of the State of Cali above is true <br />Signature: <br />Phone Number: 9St )oC o'7'7 3 -t7-t,r <br />Rev 211712015 <br />?^-(J v) 9L-fa^aa-1gai .C-J,&1 <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />1 <br />s. trtr <br />s. trtr <br />10. El E <br />Date: <br />Email Address: