Laserfiche WebLink
,^-SANTA <br />NA,',liilffi <br />Planning & Building Agency <br />Building Safety Division <br />20 Ciyic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa.ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall fill in the address of the project, conlractor's <br />licensing information and answer questions 1 -10 below. Complete and sign the certification section**lf answering NO to any of the questions, plan check shall be required.,* <br />6 ]I WFqT TIII BFI I A C()I IRT qANTA ANA ('.4, S)701 <br />Contractor Company Name: SREP ELECTRIC <br />Contractor License Number: 972048 C-46 and C-10 <br />YES NO Are the following applicable to the proposed project? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 3 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV system layout provide a lhree-foot wide clear access pathway per the <br />latest edition of "Guideline for Fire Safety Elements of Solar Photovoltalc Systems" <br />by OCFA? (Guideline available on the OCFA website: http://vwwv.ocfa.orq) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum ol2-112inch lag screw embedment into roof rafters? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specilic site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />1 <br />q tr <br />tr <br />tr <br />tr <br />2 <br />3 <br />tr <br />x <br />4 <br />6 utr <br />7 x tr <br />8 tr <br />tr <br />D <br />tr <br />tr <br />I <br />10 <br />I certify under preralty of pEiury <br />Print name: ' )oS H -?*under the laws of th <br />t)(), <br />e State of Cal above is true: <br />Signature <br />Phone Number:9<t )oc Lrl l Date -tLl-t.l <br />Email Addressi <br />x <br />Rev:2h712015 <br />7*-61 OJ cua oaA*-Tt<)r-1 <br />sol-01 cBc 2013 <br />Project Address: <br />trtr