ABBREVIATIONS
<br />AD - ACCESS DOOR
<br />AFF - ABOVE FINISHED FLOOR
<br />ABS - ABSOLUTE
<br />AVTR - ACID VENT THRU ROOF
<br />ALT - ALTITUDE
<br />AMB - AMBIENT
<br />ANSI - AMERICAN NATIONAL STANDARDS INSTITUTE
<br />APPROX. - APPROXIMATE
<br />ATM - ATMOSPHERE
<br />ATC - AUTOMATIC TEMPERATURE CONTROL
<br />AUX - AUXILIARY
<br />AVG - AVERAGE
<br />AWT - AVERAGE WATER TEMPERATURE
<br />BFD - BOILER FEED DISCHARGE
<br />BFW - BOILER FEED WATER
<br />BOD -BOTTOM OF DUCT
<br />BOPI - BOTTOM OF PIPE INSULATION
<br />BOT. - BOTTOM
<br />BHP - BRAKE HORSEPOWER
<br />BMS - BUILDING MANAGEMENT SYSTEM
<br />BSV - BLEED SOLENOID VALVE
<br />BTU - BRITISH THERMAL UNIT
<br />CL - CENTER LINE
<br />CU FT - CUBIC FEET
<br />CU IN - CUBIC INCH
<br />CFM - CUBIC FEET PER MINUTE
<br />CFH - CUBIC FEET PER HOUR
<br />COMPR - COMPRESSOR
<br />C.O. - CLEAN OUT
<br />CP - CEILING PENETRATION
<br />CWP - COLD WORKING PRESSURE
<br />CR - CONTROL RELAY
<br />CV - CONTROL VALVE
<br />CYL - CYLINDER
<br />DB - DIFFUSER BOX
<br />DFU - DRAINAGE FIXTURE UNITS
<br />DIA. - DIAMETER
<br />ID - DIAMETER, INSIDE
<br />OD - DIAMETER, OUTSIDE
<br />DISCH - DISCHARGE
<br />DN - DOWN
<br />DSV - DRAIN SOLENOID VALVE
<br />DWG. - DRAWING
<br />D.B. - DRY BULB
<br />EAT - ENTERING AIR TEMPERATURE
<br />EEW - EMERGENCY EYE WASH
<br />E.C. - ELECTRICAL CONTRACTOR
<br />ENT - ENTERING
<br />ER - EXHAUST REGISTER
<br />EWT - ENTERING WATER TEMPERATURE
<br />EWC - ELECTRIC WATER COOLER
<br />EQ - EQUALIZER
<br />ESP - EXTERNAL STATIC PRESSURE
<br />F - FAHRENHEIT
<br />FD - FIRE DAMPER (RATING, HRS.)
<br />FLA - FULL LOAD AMPS
<br />FT - FEET
<br />FPM - FEET PER MINUTE
<br />FPS - FEET PER SECOND
<br />FRD - FIRE RATED DAMPER
<br />FPT - FEMALE PIPE THREAD
<br />FS - FLOAT SWITCH
<br />FCO - FLOOR CLEANOUT
<br />GA. - GAGE OR GAUGE
<br />GAL. - GALLON
<br />GP - GLYCOL PUMP
<br />GPM - GALLON PER MINUTE
<br />GPRV - GAS PRESSURE REDUCING VALVE
<br />GALV. - GALVANIZED
<br />H-O-A - HANDS-OFF-AUTOMATIC SWITCH
<br />HLA - HIGH LEVEL ALARM
<br />HLS - HIGH LEVEL STOP
<br />HP - HORSEPOWER
<br />H.R. - HOSE REEL
<br />HGSV - HOT GAS SOLENOID VALVE
<br />HR - HOUR
<br />RH - RELATIVE HUMIDITY
<br />IH - INTAKE HOOD
<br />INCLR - INTERCOOLER
<br />INV. - INVERT
<br />IPS - IRON PIPE SIZE
<br />KW - KILOWATT
<br />LAT - LEAVING AIR TEMPERATURE
<br />LWT - LEAVING WATER TEMPERATURE
<br />LG - LENGTH
<br />LL - LIQUID LEVEL
<br />LF - LINEAR FEET
<br />LLC - LIQUID LEVEL CONTROLLER
<br />LIQ - LIQUID
<br />LI - LIQUID INJECTION
<br />LSV - LIQUID SOLENOID VALVE
<br />LDTCO - LOW DISCHARGE TEMPERATURE CUTOUT
<br />LLA - LOW LEVEL ALARM
<br />LLS - LOW LEVEL STOP
<br />LPL - LOW PRESSURE LIQUID
<br />LPR - LOW PRESSURE RECEIVER
<br />LTRL - LOW TEMPERATURE RECIRCULATED LIQUID
<br />LTRS - LOW TEMPERATURE RECIRCULATED SUCTION
<br />MPT - MALE PIPE THREAD
<br />MAV - MANUAL AIR VENT
<br />MAX. - MAXIMUM
<br />MBH - 1,000 BTU's / HR
<br />M.C. - MECHANICAL CONTRACTOR
<br />MEZZ. - MEZZANINE
<br />MIN. - MINIMUM
<br />MOD - MOTOR OPERATOR DAMPER
<br />MS - MOTOR STARTER
<br />MTR - MOTOR
<br />NPS - NATIONAL PIPE-STRAIGHT
<br />NPT - NATIONAL PIPE-TAPERED
<br />N.O. - NORMALLY OPEN
<br />N.C. - NORMALLY CLOSED
<br />NTS - NOT TO SCALE
<br />NO - NUMBER
<br />ODF - COPPER TUBE DIMENSIONS -MALE END
<br />ODS - COPPER TUBE DIMENSIONS -FEMALE END
<br />OP - OIL POT
<br />O.C. - ON CENTER
<br />OZ - OUNCE
<br />OPL - OPERATING LEVEL
<br />O.A. - OUTSIDE AIR
<br />OAI - OUTSIDE AIR INTAKE
<br />ODT - OUTSIDE DIAMETER TUBING
<br />PH - PHASE
<br />PW - PLANT WASTE
<br />PSI - PRESSURE PER SQUARE INCH
<br />P.O.C. - POINT OF CONNECTION
<br />PRESS - PRESSURE
<br />PSIG - PSI GAGE
<br />P - PURGE
<br />PS - PURGE SUCTION / PRESSURE SWITCH
<br />PSV - PURGE SOLENOID VALVE
<br />RB - RETURN BOX
<br />R.C. - REFRIGERATION CONTRACTOR
<br />RP - ROOF PENETRATION
<br />RV - RELIEF VENT
<br />R.A. - RETURN AIR
<br />RPM - REVOLUTIONS PER MINUTE
<br />SCH - SCHEDULE
<br />SCR - SCREWED
<br />SOCL - SCREW OIL COOLING LIQUID
<br />SOV -SHUT-OFF VALVE
<br />S.W. - SITE WORK CONTRACTOR
<br />SV - SOLENOID VALVE
<br />SW - SOCKET WELD
<br />STL - STEEL
<br />S.S. - STAINLESS STEEL
<br />S.P. - STATIC PRESSURE
<br />SSV - SUCTION SOLENOID VALVE
<br />S.A. - SUPPLY AIR
<br />TEMP - TEMPERATURE
<br />TS - TEMPERATURE SENSOR
<br />T-STAT - THERMOSTAT
<br />T - THERMOSTAT
<br />TC - THERMOCOUPLE
<br />TX - THERMAL EXPANSION
<br />THK - THICK (-NESS)
<br />T.G. - TOP OF GRATE
<br />T.O.T. - TOP OF TRAPEZE
<br />TRANS. - TRANSITION
<br />TD - TEMPERATURE DIFFERENCE
<br />TSV - TRANSFER SOLENOID VALVE
<br />TYP - TYPICAL
<br />U/C - UNDERCUT (DOOR)
<br />UC - UNDERCUT (DOOR)
<br />U.F. - UNDERFLOOR
<br />UH - UNIT HEATER
<br />VAC - VACUUM
<br />VAR - VARIABLE
<br />VAV - VARIABLE AIR VOLUME
<br />VEL - VELOCITY
<br />VSV - VENT SOLENOID VALVE
<br />VERT - VERTICAL
<br />VISC - VISCOSITY
<br />V - VOLT
<br />VD - VOLUME DAMPER
<br />VOL - VOLUME
<br />VTR - VENT THRU ROOF
<br />W - WATT
<br />WCO - WALL CLEANOUT
<br />W/ - WITH
<br />W.B. - WET BULB
<br />YCO - YARD CLEANOUT
<br />ACP -AIR COMPRESSOR
<br />AD -AIR DRYER
<br />ADV -AUTOMATIC DRAIN VALVE
<br />AF -AIR FILTER
<br />AHU -AIR HANDLING UNIT
<br />AIH -AIR INTAKE HOOD
<br />AIRC -AIR CURTAIN
<br />AFMS -AIR FLOW MEASURING STATION
<br />AR -AIR RECEIVER
<br />ARH -AIR RELIEF HOOD
<br />AS -AIR SEPARATOR
<br />AU -AIR UNIT
<br />BB -ELECTRIC BASEBOARD HEATER
<br />BFP -BOILER FEED PUMP
<br />CF -CIRCULATION FAN
<br />CH -CHILLER
<br />COND -CONDENSER
<br />CP -CONDENSATE PUMP
<br />CUH -CABINET UNIT HEATER
<br />CWP -CHILLED WATER PUMP
<br />CV -CONTROL VALVE
<br />DCP -DOMESTIC WATER PUMP
<br />DHU -DEHUMIDIFICATION UNIT
<br />EC -EVAPORATIVE CONDENSER
<br />EDH -ELECTRIC DUCT HEATER
<br />EF -EXHAUST FAN
<br />EIH -ELECTRIC INFRARED HEATER
<br />ET -EXPANSION TANK
<br />EUH -ELECTRIC UNIT HEATER
<br />EWH -ELECTRIC WALL HEATER
<br />GUH -GAS UNIT HEATER
<br />HB -HOSE BIBB
<br />HPR -HIGH PRESSURE RECEIVER
<br />HX -HEAT EXCHANGER
<br />L -WALL LOUVER
<br />MAU -MAKE-UP AIR UNIT
<br />OP -OIL POT
<br />P -PUMP
<br />PP -PLUMBING PUMP
<br />PR -PUMP RECEIVER
<br />RC -REFRIGERATION COMPRESSOR
<br />RTU -ROOF-TOP UNIT
<br />RP -REFRIGERATION PUMP
<br />SF -SUPPLY FAN
<br />SP -SUMP PUMP
<br />SS -SPLIT SYSTEM AIR CONDITIONER
<br />VAV -VARIABLE AIR VOLUME UNIT
<br />WH -WATER HEATER
<br />WP -WATER PUMP
<br />WS -WATER SOFTENER
<br />MECHANICAL EQUIPMENT CALLOUTS
<br />1. PERFORM WORK IN ACCORDANCE WITH THE LATEST
<br /> EDITIONS, REVISIONS, AMENDMENTS OR SUPPLEMENTS
<br /> OF APPLICABLE STATUTES, ORDINANCES, CODES OR
<br /> REGULATIONS OF FEDERAL, STATE, AND LOCAL
<br /> AUTHORITIES HAVING JURISDICTION IN EFFECT ON THE
<br /> DATE MECHANICAL PACKAGE IS ISSUED.
<br />2. WHERE APPROVED STANDARDS HAVE BEEN
<br /> ESTABLISHED BY OSHA, UNDERWRITER'S LABORATORY,
<br /> AMERICAN CODES, ASA, ASHRAE, ARI, NEC, STATE FIRE
<br /> INSURANCE REGULATORY BODY, NFPA OR OTHERS,
<br /> THESE STANDARDS SHALL BE FOLLOWED WHETHER OR
<br /> NOT INDICATED ON THE DRAWINGS AND SPECIFICATIONS.
<br />3. ARRANGE WITH AUTHORITIES AND UTILITY COMPANIES
<br /> FOR PERMITS, FEES AND SERVICE CONNECTIONS.
<br /> VERIFY LOCATIONS AND ARRANGEMENTS AND PAY ALL
<br /> CHARGES, INCLUDING INSPECTIONS.
<br />4. WORKING PRESSURE OF PIPING SYSTEMS AND
<br /> EQUIPMENT HAS BEEN ESTABLISHED AT 150 PSIG.
<br />5. INSTALL PIPING AND DUCTWORK TO PROVIDE THE
<br /> MAXIMUM POSSIBLE CLEAR HEIGHT UNDERNEATH
<br /> UNLESS OTHERWISE NOTED.
<br />6. THE ENTIRE SYSTEM AND ITS COMPONENT ITEMS OF
<br /> EQUIPMENT SHALL OPERATE WITHOUT OBJECTIONABLE
<br /> VIBRATION OR NOISE.
<br />7. INSTALL ALL THERMOSTATS 60" ABOVE FINISHED FLOOR
<br /> TO CENTER OF OUTLET BOX IN WAREHOUSE AREAS. IN
<br /> OFFICE AREAS MOUNT THERMOSTATS AT THE SAME
<br /> ELEVATION AS THE LIGHT SWITCH (48" ABOVE FINISHED
<br /> FLOOR TO CENTER OF BOX OUTLET). MOUNT
<br /> THERMOSTAT 3" FROM LIGHT SWITCH. COORDINATE
<br /> LOCATION AND MOUNTING HEIGHTS WITH ELECTRICAL
<br /> CONTRACTOR PRIOR TO ROUGH-IN.
<br />8. DUCT DIMENSIONS SHOWN ARE AIR STREAM SIZES (FREE
<br /> AREA). SIZES DO NOT INCLUDE ALLOWANCE FOR DUCT
<br /> INSULATION. PROVIDE SLEEVES AND INSERTS AS
<br /> NECESSARY TO THE BUILDING CONTRACTOR FOR
<br /> PLACEMENT IN STRUCTURAL WORK.
<br />9. ROOF OPENING SIZES SHOWN FOR ROOFTOP A/C UNITS
<br /> AND EXHAUST FANS ARE APPROXIMATE. CONTRACTOR
<br /> SHALL PROVIDE EXACT ROOF OPENING, CURB SIZE,
<br /> EQUIPMENT WEIGHTS, AND LOCATION REQUIREMENTS
<br /> TO GENERAL CONTRACTOR.
<br />10. CONFLICTS BETWEEN HVAC, PLUMBING, ELECTRICAL OR
<br /> FIRE PROTECTION SHALL BE COORDINATED THROUGH
<br /> CONSTRUCTION MANAGEMENT NO ARBITRARY CHANGES
<br /> IN SYSTEMS LAYOUT SHALL BE APPROVED.
<br />11. PIPING, VALVES, LIGHT FIXTURES, AND OTHER
<br /> COMPONENTS ARE SHOWN LARGER THAN ACTUAL SIZE.
<br /> PIPE ROUTING IS SHOWN WITH AN EXAGGERATED
<br /> SPACING FOR CLARITY. ACTUAL PLACEMENT OF PIPING
<br /> SHOULD BE DONE COLLECTIVELY AND IN SUCH A
<br /> MANNER AS NOT TO CONFLICT WITH LOCATION
<br /> SENSITIVE COMPONENTS SUCH AS LIGHT FIXTURES.
<br />12. CAULK AND SEAL ALL WALL PENETRATIONS. WHERE
<br /> PIPE OR DUCT PASS THROUGH FIRE RATED WALLS,
<br /> PARTITIONS, CEILING, OR FLOORS, THE FIRE RATED
<br /> INTEGRITY SHALL BE MAINTAINED. REFERENCE
<br /> BUILDING DRAWINGS
<br />13. PIPING FOR CONDENSATE SHALL SLOPE NOT LESS THAN
<br /> 1/4 INCH PER FOOT.
<br />14. DUCT PRESSURE CLASS: 1 INCH UNLESS NOTED
<br /> OTHERWISE.
<br />MECHANICAL GENERAL NOTES:
<br />A -COMPRESSED AIR
<br />ATV -ATMOSPHERIC VENT
<br />AV -ACID VENT
<br />AW -ACID WASTE
<br />BBD -BOILER BLOWDOWN
<br />BD -BOOSTER DISCHARGE
<br />BF -BOILER FEED
<br />CBBD -CONTINUOUS BOILER BLOWDOWN
<br />C -CONDENSER WATER SUPPLY
<br />CD -CONDENSATE DRAIN
<br />CF -CHEMICAL FEED
<br />CHPL -CHILLED HIGH PRESSURE LIQUID
<br />CHWR -CHILLED WATER RETURN
<br />CHWS -CHILLED WATER SUPPLY
<br />COND -CONDENSATE
<br />CR -CONDENSER WATER RETURN
<br />CTWR -COOLING TOWER WATER RETURN
<br />CTWS -COOLING TOWER WATER SUPPLY
<br />CW -DOMESTIC COLD WATER SUPPLY
<br />CWR -CHILLED WATER RETURN
<br />CWS -CHILLED WATER SUPPLY
<br />D -DRAIN
<br />DC -DEFROST CONDENSATE
<br />E -EQUALIZER
<br />E-(NAME)-EXISTING PIPING
<br />ES - ECONOMIZER SUCTION
<br />FM -FORCED MAIN
<br />FOD -FUEL OIL DISCHARGE
<br />FOG -FUEL OIL GAGE
<br />FOR -FUEL OIL RETURN
<br />FOS -FUEL OIL SUCTION
<br />FOV -FUEL OIL TANK VENT
<br />FW -FEEDWATER
<br />GAS -GAS (NATURAL)
<br />GR - GLYCOL RETURN
<br />GS - GLYCOL SUPPLY
<br />GWR -GLYCOL WATER RETURN
<br />GWS -GLYCOL WATER SUPPLY
<br />HHWR -HEATING HOT WATER RETURN
<br />HHWS -HEATING HOT WATER SUPPLY
<br />HOR -HYDRAULIC OIL RETURN
<br />HOS -HYDRAULIC OIL SUPPLY
<br />HPC -HIGH PRESSURE CONDENSATE RETURN
<br />HPS -HIGH PRESSURE STEAM
<br />HPHR -HIGH PRESSURE DOMESTIC HOT WATER RETURN
<br />HPHS -HIGH PRESSURE DOMESTIC HOT WATER SUPPLY
<br />HPWR -HEAT PUMP WATER RETURN
<br />HPWS -HEAT PUMP WATER SUPPLY
<br />HPL -HIGH PRESSURE LIQUID
<br />HSD -HIGH STAGE DISCHARGE
<br />HSS -HIGH STAGE SUCTION
<br />HTRL -HIGH TEMPERATURE RETURN LIQUID
<br />HTRS -HIGH TEMPERATURE RETURN SUCTION
<br />HGD -HOT GAS DEFROST
<br />H -HUMIDIFICATION LINE
<br />HTWR -HIGH TEMPERATURE HOT WATER RETURN
<br />HTWS -HIGH TEMPERATURE HOT WATER SUPPLY
<br />HW -DOMESTIC HOT WATER SUPPLY
<br />HWR -DOMESTIC HOT WATER RETURN
<br />IBBD -INTERMITTENT BOILER BLOWDOWN
<br />IPL -INTERMEDIATE PRESSURE LIQUID
<br />ISD -INTERMEDIATE STAGE DISCHARGE
<br />ISS -INTERMEDIATE STAGE SUCTION
<br />IWR -ICE WATER RETURN
<br />IWS -ICE WATER SUPPLY
<br />LD -LIQUID DRAIN
<br />LI - LIQUID INJECTION
<br />LIQ -LIQUID
<br />LL -LIQUID LEVEL
<br />LPC -LOW PRESSURE CONDENSATE RETURN
<br />LPS -LOW PRESSURE STEAM
<br />LSS -LOW STAGE SUCTION
<br />LTRL -LOW TEMPERATURE RECIRCULATED LIQUID
<br />LTRS -LOW TEMPERATURE RECIRCULATED SUCTION
<br />MPC -MEDIUM PRESSURE CONDENSATE RETURN
<br />MPS -MEDIUM PRESSURE STEAM
<br />MTWR -MEDIUM TEMPERATURE HOT WATER RETURN
<br />MTWS -MEDIUM TEMPERATURE HOT WATER SUPPLY
<br />N2 -NITROGEN
<br />OR -OIL RETURN
<br />OS -OIL SUPPLY
<br />PC -PUMPED CONDENSATE
<br />PCR -PUMPED CONDENSATE RETURN
<br />PCHWR -PROCESS CHILLED WATER RETURN
<br />PCHWS - PROCESS CHILLED WATER SUPPLY
<br />PN -PNEUMATIC TUBE
<br />PO -PUMP OUT
<br />PW -PROCESS WASTE
<br />PW-SS -PROCESS WASTE -STAINLESS STEEL
<br />RD -REFRIGERANT DISCHARGE
<br />RL -REFRIGERANT LIQUID
<br />RS -REFRIGERANT SUCTION
<br />RV -RELIEF VENT
<br />RWC -RAIN WATER CONDUCTOR
<br />SAN -SANITARY SEWER
<br />SCL -SUB-COOLED LIQUID
<br />SS -STORM SEWER
<br />ST -STEAM
<br />SUCT -SUCTION
<br />SR -SUCTION RETURN
<br />SW -SOFT WATER
<br />THW -TEMPERED HOT WATER
<br />TSR -THERMOSYPHON RETURN
<br />TSS -THERMOSYPHON SUPPLY
<br />TWS -TOWER WATER SUPPLY
<br />TWR -TOWER WATER RETURN
<br />V -VENT PIPING
<br />VAC -VACUUM (AIR)
<br />VPD -VACUUM PUMP DISCHARGE
<br />W -WATER
<br />WR -WATER RETURN
<br />WS -WATER SUPPLY
<br />WW -WELL WATER
<br />MECHANICAL PIPING CALLOUTS
<br />1. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL OPENINGS REQUIRED FOR
<br />PENETRATIONS THROUGH THE BUILDING EXTERIOR, INTERIOR, AND STRUCTURE. SEE "I-SERIES"
<br />PENETRATION DRAWINGS FOR PENETRATION DETAILS AND SEE SPECIFICATIONS TO BE USED IN
<br />CONJUNCTION WITH THE CONSTRUCTION DOCUMENTS FOR A COMPLETE INSTALLATION OF THE
<br />PENETRATION DETAIL. GENERAL CONTRACTOR TO COORDINATE PENETRATION WORK BETWEEN
<br />THE CONTRACTOR RESPONSIBLE FOR A COMPLETE INSTALLATION AND FOR A COMPLETE
<br />WEATHER-TIGHT AND VAPOR-TIGHT ENCLOSURE OF THE EXTERIOR, INTERIOR, AND FOOD SAFE
<br />ENVIRONMENTS.
<br />PENETRATION DETAILS
<br />TYPE D -ELASTOMERIC FOAM, ‘ARMAFLEX’
<br />1. MOLDED CLOSED CELL ELASTOMERIC FOAM, ‘ARMAFLEX’, COMPLYING WITH ASTM C 534;
<br /> TYPE II; FLEXIBLE, CELLULAR ELASTOMERIC, SHEETS.
<br />2. THERMAL CONDUCTIVITY, "K" VALUE OF 0.27 AT 75 DEGREES F MEAN TEMPERATURE.
<br />3. MAXIMUM/MINIMUM SERVICE TEMPERATURE: 220 / -70 DEGREES F.
<br />4. MAXIMUM WATER VAPOR PERMEABILITY OF 0.08 TESTED IN ACCORDANCE WITH ASTM E 96
<br /> PROCEDURE A.
<br />5. DENSITY OF NOT LESS THAN 5 LB. PER CU. FT.
<br />6. MAXIMUM FLAME SPREAD/SMOKE DEVELOPMENT: 25/50.
<br />7. INSULATION SHALL BE AP ARMAFLEX AS MANUFACTURED BY ARMACELL OR EQUAL BY RUBATEX.
<br />DUCTWORK INSULATION SPECIFICATIONS
<br />1.ELASTOMERIC PAINT COATING: WHITE, WATER-BASED LATEX ENAMEL, WB
<br /> ARMAFLEX FINISH OR EQUAL BY RUBATEX.
<br />JACKETING
<br />DUCTWORK INSULATION AND JACKET MATERIAL
<br />DUCTWORK
<br />DESCRIPTION
<br />INSULATION MATERIAL
<br />JACKET MATERIALCONDUCTIVITY
<br />MEAN RATING
<br />TEMPERATURE
<br />TYPE THICKNESS
<br />(INCHES)
<br />INTERIOR, EXPOSED APPLICATIONS (NON PROCESS AREAS)
<br />HEATING / COOLING
<br />SUPPLY DUCTS 0.27 AT 75 °F D 2 ELASTOMERIC
<br />PAINT COATING
<br />RETURN DUCTS IN
<br />CONDITIONED
<br />SPACE WITHIN 10FT
<br />OF SUPPLY UNIT OR
<br />EXTERIOR OPENING
<br />0.27 AT 75 °F D 2 ELASTOMERIC
<br />PAINT COATING
<br />NOTES:
<br />I. THERMAL CONDUCTIVITY UNITS: BTU IN / (HR FT2 °F).
<br />II. ALL INSULATION THICKNESS MUST MEET THE MINIMUM ACCEPTABLE THERMAL CONDUCTIVITY
<br /> AS STATED IN THE LATEST EDITION ASHRAE 90.1. R-VALUES SHALL MEET OR EXCEED
<br /> ASHRAE STANDARDS ALSO.
<br />III. UNCONDITIONED SPACES INCLUDE CRAWL SPACES AND ATTICS.
<br />IV. COOLING DUCTS ARE THOSE DESIGNED TO CONVEY MECHANICALLY COOLED AIR OR RETURN
<br /> DUCTS IN SUCH SYSTEMS.
<br />V. HEATING DUCTS ARE THOSE DESIGNED TO CONVEY MECHANICALLY HEATED AIR OR RETURN
<br /> DUCTS IN SUCH SYSTEMS.
<br />VI. INTERIOR, EXPOSED APPLICATIONS (NON PROCESS AREAS) INCLUDE INTERSTITIAL SPACES.
<br />DRAWN BY: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
<br />CHECKED BY: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
<br />SHEET ISSUE DATE: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
<br />SHEET NUMBER
<br />THE INFORMATION CONTAINED ON THIS AND ANY
<br />RELATED DOCUMENT SHALL NOT BE USED FOR
<br />ANY PURPOSE OTHER THAN THE CONVEYANCE
<br />OF INFORMATION FOR THE STATED CLIENT AND
<br />PROJECT WITHOUT THE EXPRESS WRITTEN
<br />CONSENT OF THE ENGINEER.
<br />ANY INFORMATION TRANSFERRED OR UTILIZED
<br />IN AUTOCAD .DWG FORMAT SHALL BE USED FOR
<br />REFERENCE ONLY
<br />WEBBER/SMITH Associates, Inc.
<br />20 Wright Avenue
<br />Lititz, Pennsylvania 17543
<br />Phone: 717.625.4140
<br />Email:info@webbersmith.com
<br />SHEET TITLE:
<br />FOR
<br />DRAWING STATUS
<br />FINAL
<br />PROJECT NUMBER
<br />www.webbersmith.com
<br />SEAL
<br />M-001-1
<br />BWI
<br />JSD
<br />04/02/2024
<br />MECHANICAL
<br />COVER SHEET
<br />2350 Pullman WSS OCTA Aspire
<br />Bakeries
<br />2350 Pullman Street
<br />Santa Ana, CA 92705
<br />CA
<br />5387
<br />© 2024 WEBBER/SMITH Associates, Inc., All Rights Reserved
<br />2350
<br />Pullman,LLC
<br />SHEET INDEX - MECHANICAL
<br />SHEET
<br />NUMBER SHEET NAME
<br />M-001-1 MECHANICAL COVER SHEET
<br />M-100-1 FLOOR PLAN - MECHANICAL
<br />M-601-1 MECHANICAL DETAILS AND SCHEDULES
<br />NO. DATE DESCRIPTION
<br />A 04/02/2024 ISSUED FOR PERMIT AND
<br />CONSTRUCTION
<br />REGISTERED PROFESSIONAL ENGINEER33478
<br />JAMES S DEPEW
<br />STATE OF CALIFORNIAMECHANICAL
<br />4/2/24
<br />Deferred submittal to 101120904 (permit
<br />issued on 3/4/25) for Mechanical unit rooftop
<br />support
<br />Def Bldg permit #101124233
<br />APPROVALS:
<br />PLNG - N. Tran
<br />BLDG - CSG
|