Laserfiche WebLink
ABBREVIATIONS <br />AD - ACCESS DOOR <br />AFF - ABOVE FINISHED FLOOR <br />ABS - ABSOLUTE <br />AVTR - ACID VENT THRU ROOF <br />ALT - ALTITUDE <br />AMB - AMBIENT <br />ANSI - AMERICAN NATIONAL STANDARDS INSTITUTE <br />APPROX. - APPROXIMATE <br />ATM - ATMOSPHERE <br />ATC - AUTOMATIC TEMPERATURE CONTROL <br />AUX - AUXILIARY <br />AVG - AVERAGE <br />AWT - AVERAGE WATER TEMPERATURE <br />BFD - BOILER FEED DISCHARGE <br />BFW - BOILER FEED WATER <br />BOD -BOTTOM OF DUCT <br />BOPI - BOTTOM OF PIPE INSULATION <br />BOT. - BOTTOM <br />BHP - BRAKE HORSEPOWER <br />BMS - BUILDING MANAGEMENT SYSTEM <br />BSV - BLEED SOLENOID VALVE <br />BTU - BRITISH THERMAL UNIT <br />CL - CENTER LINE <br />CU FT - CUBIC FEET <br />CU IN - CUBIC INCH <br />CFM - CUBIC FEET PER MINUTE <br />CFH - CUBIC FEET PER HOUR <br />COMPR - COMPRESSOR <br />C.O. - CLEAN OUT <br />CP - CEILING PENETRATION <br />CWP - COLD WORKING PRESSURE <br />CR - CONTROL RELAY <br />CV - CONTROL VALVE <br />CYL - CYLINDER <br />DB - DIFFUSER BOX <br />DFU - DRAINAGE FIXTURE UNITS <br />DIA. - DIAMETER <br />ID - DIAMETER, INSIDE <br />OD - DIAMETER, OUTSIDE <br />DISCH - DISCHARGE <br />DN - DOWN <br />DSV - DRAIN SOLENOID VALVE <br />DWG. - DRAWING <br />D.B. - DRY BULB <br />EAT - ENTERING AIR TEMPERATURE <br />EEW - EMERGENCY EYE WASH <br />E.C. - ELECTRICAL CONTRACTOR <br />ENT - ENTERING <br />ER - EXHAUST REGISTER <br />EWT - ENTERING WATER TEMPERATURE <br />EWC - ELECTRIC WATER COOLER <br />EQ - EQUALIZER <br />ESP - EXTERNAL STATIC PRESSURE <br />F - FAHRENHEIT <br />FD - FIRE DAMPER (RATING, HRS.) <br />FLA - FULL LOAD AMPS <br />FT - FEET <br />FPM - FEET PER MINUTE <br />FPS - FEET PER SECOND <br />FRD - FIRE RATED DAMPER <br />FPT - FEMALE PIPE THREAD <br />FS - FLOAT SWITCH <br />FCO - FLOOR CLEANOUT <br />GA. - GAGE OR GAUGE <br />GAL. - GALLON <br />GP - GLYCOL PUMP <br />GPM - GALLON PER MINUTE <br />GPRV - GAS PRESSURE REDUCING VALVE <br />GALV. - GALVANIZED <br />H-O-A - HANDS-OFF-AUTOMATIC SWITCH <br />HLA - HIGH LEVEL ALARM <br />HLS - HIGH LEVEL STOP <br />HP - HORSEPOWER <br />H.R. - HOSE REEL <br />HGSV - HOT GAS SOLENOID VALVE <br />HR - HOUR <br />RH - RELATIVE HUMIDITY <br />IH - INTAKE HOOD <br />INCLR - INTERCOOLER <br />INV. - INVERT <br />IPS - IRON PIPE SIZE <br />KW - KILOWATT <br />LAT - LEAVING AIR TEMPERATURE <br />LWT - LEAVING WATER TEMPERATURE <br />LG - LENGTH <br />LL - LIQUID LEVEL <br />LF - LINEAR FEET <br />LLC - LIQUID LEVEL CONTROLLER <br />LIQ - LIQUID <br />LI - LIQUID INJECTION <br />LSV - LIQUID SOLENOID VALVE <br />LDTCO - LOW DISCHARGE TEMPERATURE CUTOUT <br />LLA - LOW LEVEL ALARM <br />LLS - LOW LEVEL STOP <br />LPL - LOW PRESSURE LIQUID <br />LPR - LOW PRESSURE RECEIVER <br />LTRL - LOW TEMPERATURE RECIRCULATED LIQUID <br />LTRS - LOW TEMPERATURE RECIRCULATED SUCTION <br />MPT - MALE PIPE THREAD <br />MAV - MANUAL AIR VENT <br />MAX. - MAXIMUM <br />MBH - 1,000 BTU's / HR <br />M.C. - MECHANICAL CONTRACTOR <br />MEZZ. - MEZZANINE <br />MIN. - MINIMUM <br />MOD - MOTOR OPERATOR DAMPER <br />MS - MOTOR STARTER <br />MTR - MOTOR <br />NPS - NATIONAL PIPE-STRAIGHT <br />NPT - NATIONAL PIPE-TAPERED <br />N.O. - NORMALLY OPEN <br />N.C. - NORMALLY CLOSED <br />NTS - NOT TO SCALE <br />NO - NUMBER <br />ODF - COPPER TUBE DIMENSIONS -MALE END <br />ODS - COPPER TUBE DIMENSIONS -FEMALE END <br />OP - OIL POT <br />O.C. - ON CENTER <br />OZ - OUNCE <br />OPL - OPERATING LEVEL <br />O.A. - OUTSIDE AIR <br />OAI - OUTSIDE AIR INTAKE <br />ODT - OUTSIDE DIAMETER TUBING <br />PH - PHASE <br />PW - PLANT WASTE <br />PSI - PRESSURE PER SQUARE INCH <br />P.O.C. - POINT OF CONNECTION <br />PRESS - PRESSURE <br />PSIG - PSI GAGE <br />P - PURGE <br />PS - PURGE SUCTION / PRESSURE SWITCH <br />PSV - PURGE SOLENOID VALVE <br />RB - RETURN BOX <br />R.C. - REFRIGERATION CONTRACTOR <br />RP - ROOF PENETRATION <br />RV - RELIEF VENT <br />R.A. - RETURN AIR <br />RPM - REVOLUTIONS PER MINUTE <br />SCH - SCHEDULE <br />SCR - SCREWED <br />SOCL - SCREW OIL COOLING LIQUID <br />SOV -SHUT-OFF VALVE <br />S.W. - SITE WORK CONTRACTOR <br />SV - SOLENOID VALVE <br />SW - SOCKET WELD <br />STL - STEEL <br />S.S. - STAINLESS STEEL <br />S.P. - STATIC PRESSURE <br />SSV - SUCTION SOLENOID VALVE <br />S.A. - SUPPLY AIR <br />TEMP - TEMPERATURE <br />TS - TEMPERATURE SENSOR <br />T-STAT - THERMOSTAT <br />T - THERMOSTAT <br />TC - THERMOCOUPLE <br />TX - THERMAL EXPANSION <br />THK - THICK (-NESS) <br />T.G. - TOP OF GRATE <br />T.O.T. - TOP OF TRAPEZE <br />TRANS. - TRANSITION <br />TD - TEMPERATURE DIFFERENCE <br />TSV - TRANSFER SOLENOID VALVE <br />TYP - TYPICAL <br />U/C - UNDERCUT (DOOR) <br />UC - UNDERCUT (DOOR) <br />U.F. - UNDERFLOOR <br />UH - UNIT HEATER <br />VAC - VACUUM <br />VAR - VARIABLE <br />VAV - VARIABLE AIR VOLUME <br />VEL - VELOCITY <br />VSV - VENT SOLENOID VALVE <br />VERT - VERTICAL <br />VISC - VISCOSITY <br />V - VOLT <br />VD - VOLUME DAMPER <br />VOL - VOLUME <br />VTR - VENT THRU ROOF <br />W - WATT <br />WCO - WALL CLEANOUT <br />W/ - WITH <br />W.B. - WET BULB <br />YCO - YARD CLEANOUT <br />ACP -AIR COMPRESSOR <br />AD -AIR DRYER <br />ADV -AUTOMATIC DRAIN VALVE <br />AF -AIR FILTER <br />AHU -AIR HANDLING UNIT <br />AIH -AIR INTAKE HOOD <br />AIRC -AIR CURTAIN <br />AFMS -AIR FLOW MEASURING STATION <br />AR -AIR RECEIVER <br />ARH -AIR RELIEF HOOD <br />AS -AIR SEPARATOR <br />AU -AIR UNIT <br />BB -ELECTRIC BASEBOARD HEATER <br />BFP -BOILER FEED PUMP <br />CF -CIRCULATION FAN <br />CH -CHILLER <br />COND -CONDENSER <br />CP -CONDENSATE PUMP <br />CUH -CABINET UNIT HEATER <br />CWP -CHILLED WATER PUMP <br />CV -CONTROL VALVE <br />DCP -DOMESTIC WATER PUMP <br />DHU -DEHUMIDIFICATION UNIT <br />EC -EVAPORATIVE CONDENSER <br />EDH -ELECTRIC DUCT HEATER <br />EF -EXHAUST FAN <br />EIH -ELECTRIC INFRARED HEATER <br />ET -EXPANSION TANK <br />EUH -ELECTRIC UNIT HEATER <br />EWH -ELECTRIC WALL HEATER <br />GUH -GAS UNIT HEATER <br />HB -HOSE BIBB <br />HPR -HIGH PRESSURE RECEIVER <br />HX -HEAT EXCHANGER <br />L -WALL LOUVER <br />MAU -MAKE-UP AIR UNIT <br />OP -OIL POT <br />P -PUMP <br />PP -PLUMBING PUMP <br />PR -PUMP RECEIVER <br />RC -REFRIGERATION COMPRESSOR <br />RTU -ROOF-TOP UNIT <br />RP -REFRIGERATION PUMP <br />SF -SUPPLY FAN <br />SP -SUMP PUMP <br />SS -SPLIT SYSTEM AIR CONDITIONER <br />VAV -VARIABLE AIR VOLUME UNIT <br />WH -WATER HEATER <br />WP -WATER PUMP <br />WS -WATER SOFTENER <br />MECHANICAL EQUIPMENT CALLOUTS <br />1. PERFORM WORK IN ACCORDANCE WITH THE LATEST <br /> EDITIONS, REVISIONS, AMENDMENTS OR SUPPLEMENTS <br /> OF APPLICABLE STATUTES, ORDINANCES, CODES OR <br /> REGULATIONS OF FEDERAL, STATE, AND LOCAL <br /> AUTHORITIES HAVING JURISDICTION IN EFFECT ON THE <br /> DATE MECHANICAL PACKAGE IS ISSUED. <br />2. WHERE APPROVED STANDARDS HAVE BEEN <br /> ESTABLISHED BY OSHA, UNDERWRITER'S LABORATORY, <br /> AMERICAN CODES, ASA, ASHRAE, ARI, NEC, STATE FIRE <br /> INSURANCE REGULATORY BODY, NFPA OR OTHERS, <br /> THESE STANDARDS SHALL BE FOLLOWED WHETHER OR <br /> NOT INDICATED ON THE DRAWINGS AND SPECIFICATIONS. <br />3. ARRANGE WITH AUTHORITIES AND UTILITY COMPANIES <br /> FOR PERMITS, FEES AND SERVICE CONNECTIONS. <br /> VERIFY LOCATIONS AND ARRANGEMENTS AND PAY ALL <br /> CHARGES, INCLUDING INSPECTIONS. <br />4. WORKING PRESSURE OF PIPING SYSTEMS AND <br /> EQUIPMENT HAS BEEN ESTABLISHED AT 150 PSIG. <br />5. INSTALL PIPING AND DUCTWORK TO PROVIDE THE <br /> MAXIMUM POSSIBLE CLEAR HEIGHT UNDERNEATH <br /> UNLESS OTHERWISE NOTED. <br />6. THE ENTIRE SYSTEM AND ITS COMPONENT ITEMS OF <br /> EQUIPMENT SHALL OPERATE WITHOUT OBJECTIONABLE <br /> VIBRATION OR NOISE. <br />7. INSTALL ALL THERMOSTATS 60" ABOVE FINISHED FLOOR <br /> TO CENTER OF OUTLET BOX IN WAREHOUSE AREAS. IN <br /> OFFICE AREAS MOUNT THERMOSTATS AT THE SAME <br /> ELEVATION AS THE LIGHT SWITCH (48" ABOVE FINISHED <br /> FLOOR TO CENTER OF BOX OUTLET). MOUNT <br /> THERMOSTAT 3" FROM LIGHT SWITCH. COORDINATE <br /> LOCATION AND MOUNTING HEIGHTS WITH ELECTRICAL <br /> CONTRACTOR PRIOR TO ROUGH-IN. <br />8. DUCT DIMENSIONS SHOWN ARE AIR STREAM SIZES (FREE <br /> AREA). SIZES DO NOT INCLUDE ALLOWANCE FOR DUCT <br /> INSULATION. PROVIDE SLEEVES AND INSERTS AS <br /> NECESSARY TO THE BUILDING CONTRACTOR FOR <br /> PLACEMENT IN STRUCTURAL WORK. <br />9. ROOF OPENING SIZES SHOWN FOR ROOFTOP A/C UNITS <br /> AND EXHAUST FANS ARE APPROXIMATE. CONTRACTOR <br /> SHALL PROVIDE EXACT ROOF OPENING, CURB SIZE, <br /> EQUIPMENT WEIGHTS, AND LOCATION REQUIREMENTS <br /> TO GENERAL CONTRACTOR. <br />10. CONFLICTS BETWEEN HVAC, PLUMBING, ELECTRICAL OR <br /> FIRE PROTECTION SHALL BE COORDINATED THROUGH <br /> CONSTRUCTION MANAGEMENT NO ARBITRARY CHANGES <br /> IN SYSTEMS LAYOUT SHALL BE APPROVED. <br />11. PIPING, VALVES, LIGHT FIXTURES, AND OTHER <br /> COMPONENTS ARE SHOWN LARGER THAN ACTUAL SIZE. <br /> PIPE ROUTING IS SHOWN WITH AN EXAGGERATED <br /> SPACING FOR CLARITY. ACTUAL PLACEMENT OF PIPING <br /> SHOULD BE DONE COLLECTIVELY AND IN SUCH A <br /> MANNER AS NOT TO CONFLICT WITH LOCATION <br /> SENSITIVE COMPONENTS SUCH AS LIGHT FIXTURES. <br />12. CAULK AND SEAL ALL WALL PENETRATIONS. WHERE <br /> PIPE OR DUCT PASS THROUGH FIRE RATED WALLS, <br /> PARTITIONS, CEILING, OR FLOORS, THE FIRE RATED <br /> INTEGRITY SHALL BE MAINTAINED. REFERENCE <br /> BUILDING DRAWINGS <br />13. PIPING FOR CONDENSATE SHALL SLOPE NOT LESS THAN <br /> 1/4 INCH PER FOOT. <br />14. DUCT PRESSURE CLASS: 1 INCH UNLESS NOTED <br /> OTHERWISE. <br />MECHANICAL GENERAL NOTES: <br />A -COMPRESSED AIR <br />ATV -ATMOSPHERIC VENT <br />AV -ACID VENT <br />AW -ACID WASTE <br />BBD -BOILER BLOWDOWN <br />BD -BOOSTER DISCHARGE <br />BF -BOILER FEED <br />CBBD -CONTINUOUS BOILER BLOWDOWN <br />C -CONDENSER WATER SUPPLY <br />CD -CONDENSATE DRAIN <br />CF -CHEMICAL FEED <br />CHPL -CHILLED HIGH PRESSURE LIQUID <br />CHWR -CHILLED WATER RETURN <br />CHWS -CHILLED WATER SUPPLY <br />COND -CONDENSATE <br />CR -CONDENSER WATER RETURN <br />CTWR -COOLING TOWER WATER RETURN <br />CTWS -COOLING TOWER WATER SUPPLY <br />CW -DOMESTIC COLD WATER SUPPLY <br />CWR -CHILLED WATER RETURN <br />CWS -CHILLED WATER SUPPLY <br />D -DRAIN <br />DC -DEFROST CONDENSATE <br />E -EQUALIZER <br />E-(NAME)-EXISTING PIPING <br />ES - ECONOMIZER SUCTION <br />FM -FORCED MAIN <br />FOD -FUEL OIL DISCHARGE <br />FOG -FUEL OIL GAGE <br />FOR -FUEL OIL RETURN <br />FOS -FUEL OIL SUCTION <br />FOV -FUEL OIL TANK VENT <br />FW -FEEDWATER <br />GAS -GAS (NATURAL) <br />GR - GLYCOL RETURN <br />GS - GLYCOL SUPPLY <br />GWR -GLYCOL WATER RETURN <br />GWS -GLYCOL WATER SUPPLY <br />HHWR -HEATING HOT WATER RETURN <br />HHWS -HEATING HOT WATER SUPPLY <br />HOR -HYDRAULIC OIL RETURN <br />HOS -HYDRAULIC OIL SUPPLY <br />HPC -HIGH PRESSURE CONDENSATE RETURN <br />HPS -HIGH PRESSURE STEAM <br />HPHR -HIGH PRESSURE DOMESTIC HOT WATER RETURN <br />HPHS -HIGH PRESSURE DOMESTIC HOT WATER SUPPLY <br />HPWR -HEAT PUMP WATER RETURN <br />HPWS -HEAT PUMP WATER SUPPLY <br />HPL -HIGH PRESSURE LIQUID <br />HSD -HIGH STAGE DISCHARGE <br />HSS -HIGH STAGE SUCTION <br />HTRL -HIGH TEMPERATURE RETURN LIQUID <br />HTRS -HIGH TEMPERATURE RETURN SUCTION <br />HGD -HOT GAS DEFROST <br />H -HUMIDIFICATION LINE <br />HTWR -HIGH TEMPERATURE HOT WATER RETURN <br />HTWS -HIGH TEMPERATURE HOT WATER SUPPLY <br />HW -DOMESTIC HOT WATER SUPPLY <br />HWR -DOMESTIC HOT WATER RETURN <br />IBBD -INTERMITTENT BOILER BLOWDOWN <br />IPL -INTERMEDIATE PRESSURE LIQUID <br />ISD -INTERMEDIATE STAGE DISCHARGE <br />ISS -INTERMEDIATE STAGE SUCTION <br />IWR -ICE WATER RETURN <br />IWS -ICE WATER SUPPLY <br />LD -LIQUID DRAIN <br />LI - LIQUID INJECTION <br />LIQ -LIQUID <br />LL -LIQUID LEVEL <br />LPC -LOW PRESSURE CONDENSATE RETURN <br />LPS -LOW PRESSURE STEAM <br />LSS -LOW STAGE SUCTION <br />LTRL -LOW TEMPERATURE RECIRCULATED LIQUID <br />LTRS -LOW TEMPERATURE RECIRCULATED SUCTION <br />MPC -MEDIUM PRESSURE CONDENSATE RETURN <br />MPS -MEDIUM PRESSURE STEAM <br />MTWR -MEDIUM TEMPERATURE HOT WATER RETURN <br />MTWS -MEDIUM TEMPERATURE HOT WATER SUPPLY <br />N2 -NITROGEN <br />OR -OIL RETURN <br />OS -OIL SUPPLY <br />PC -PUMPED CONDENSATE <br />PCR -PUMPED CONDENSATE RETURN <br />PCHWR -PROCESS CHILLED WATER RETURN <br />PCHWS - PROCESS CHILLED WATER SUPPLY <br />PN -PNEUMATIC TUBE <br />PO -PUMP OUT <br />PW -PROCESS WASTE <br />PW-SS -PROCESS WASTE -STAINLESS STEEL <br />RD -REFRIGERANT DISCHARGE <br />RL -REFRIGERANT LIQUID <br />RS -REFRIGERANT SUCTION <br />RV -RELIEF VENT <br />RWC -RAIN WATER CONDUCTOR <br />SAN -SANITARY SEWER <br />SCL -SUB-COOLED LIQUID <br />SS -STORM SEWER <br />ST -STEAM <br />SUCT -SUCTION <br />SR -SUCTION RETURN <br />SW -SOFT WATER <br />THW -TEMPERED HOT WATER <br />TSR -THERMOSYPHON RETURN <br />TSS -THERMOSYPHON SUPPLY <br />TWS -TOWER WATER SUPPLY <br />TWR -TOWER WATER RETURN <br />V -VENT PIPING <br />VAC -VACUUM (AIR) <br />VPD -VACUUM PUMP DISCHARGE <br />W -WATER <br />WR -WATER RETURN <br />WS -WATER SUPPLY <br />WW -WELL WATER <br />MECHANICAL PIPING CALLOUTS <br />1. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL OPENINGS REQUIRED FOR <br />PENETRATIONS THROUGH THE BUILDING EXTERIOR, INTERIOR, AND STRUCTURE. SEE "I-SERIES" <br />PENETRATION DRAWINGS FOR PENETRATION DETAILS AND SEE SPECIFICATIONS TO BE USED IN <br />CONJUNCTION WITH THE CONSTRUCTION DOCUMENTS FOR A COMPLETE INSTALLATION OF THE <br />PENETRATION DETAIL. GENERAL CONTRACTOR TO COORDINATE PENETRATION WORK BETWEEN <br />THE CONTRACTOR RESPONSIBLE FOR A COMPLETE INSTALLATION AND FOR A COMPLETE <br />WEATHER-TIGHT AND VAPOR-TIGHT ENCLOSURE OF THE EXTERIOR, INTERIOR, AND FOOD SAFE <br />ENVIRONMENTS. <br />PENETRATION DETAILS <br />TYPE D -ELASTOMERIC FOAM, ‘ARMAFLEX’ <br />1. MOLDED CLOSED CELL ELASTOMERIC FOAM, ‘ARMAFLEX’, COMPLYING WITH ASTM C 534; <br /> TYPE II; FLEXIBLE, CELLULAR ELASTOMERIC, SHEETS. <br />2. THERMAL CONDUCTIVITY, "K" VALUE OF 0.27 AT 75 DEGREES F MEAN TEMPERATURE. <br />3. MAXIMUM/MINIMUM SERVICE TEMPERATURE: 220 / -70 DEGREES F. <br />4. MAXIMUM WATER VAPOR PERMEABILITY OF 0.08 TESTED IN ACCORDANCE WITH ASTM E 96 <br /> PROCEDURE A. <br />5. DENSITY OF NOT LESS THAN 5 LB. PER CU. FT. <br />6. MAXIMUM FLAME SPREAD/SMOKE DEVELOPMENT: 25/50. <br />7. INSULATION SHALL BE AP ARMAFLEX AS MANUFACTURED BY ARMACELL OR EQUAL BY RUBATEX. <br />DUCTWORK INSULATION SPECIFICATIONS <br />1.ELASTOMERIC PAINT COATING: WHITE, WATER-BASED LATEX ENAMEL, WB <br /> ARMAFLEX FINISH OR EQUAL BY RUBATEX. <br />JACKETING <br />DUCTWORK INSULATION AND JACKET MATERIAL <br />DUCTWORK <br />DESCRIPTION <br />INSULATION MATERIAL <br />JACKET MATERIALCONDUCTIVITY <br />MEAN RATING <br />TEMPERATURE <br />TYPE THICKNESS <br />(INCHES) <br />INTERIOR, EXPOSED APPLICATIONS (NON PROCESS AREAS) <br />HEATING / COOLING <br />SUPPLY DUCTS 0.27 AT 75 °F D 2 ELASTOMERIC <br />PAINT COATING <br />RETURN DUCTS IN <br />CONDITIONED <br />SPACE WITHIN 10FT <br />OF SUPPLY UNIT OR <br />EXTERIOR OPENING <br />0.27 AT 75 °F D 2 ELASTOMERIC <br />PAINT COATING <br />NOTES: <br />I. THERMAL CONDUCTIVITY UNITS: BTU IN / (HR FT2 °F). <br />II. ALL INSULATION THICKNESS MUST MEET THE MINIMUM ACCEPTABLE THERMAL CONDUCTIVITY <br /> AS STATED IN THE LATEST EDITION ASHRAE 90.1. R-VALUES SHALL MEET OR EXCEED <br /> ASHRAE STANDARDS ALSO. <br />III. UNCONDITIONED SPACES INCLUDE CRAWL SPACES AND ATTICS. <br />IV. COOLING DUCTS ARE THOSE DESIGNED TO CONVEY MECHANICALLY COOLED AIR OR RETURN <br /> DUCTS IN SUCH SYSTEMS. <br />V. HEATING DUCTS ARE THOSE DESIGNED TO CONVEY MECHANICALLY HEATED AIR OR RETURN <br /> DUCTS IN SUCH SYSTEMS. <br />VI. INTERIOR, EXPOSED APPLICATIONS (NON PROCESS AREAS) INCLUDE INTERSTITIAL SPACES. <br />DRAWN BY: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />CHECKED BY: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />SHEET ISSUE DATE: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />SHEET NUMBER <br />THE INFORMATION CONTAINED ON THIS AND ANY <br />RELATED DOCUMENT SHALL NOT BE USED FOR <br />ANY PURPOSE OTHER THAN THE CONVEYANCE <br />OF INFORMATION FOR THE STATED CLIENT AND <br />PROJECT WITHOUT THE EXPRESS WRITTEN <br />CONSENT OF THE ENGINEER. <br />ANY INFORMATION TRANSFERRED OR UTILIZED <br />IN AUTOCAD .DWG FORMAT SHALL BE USED FOR <br />REFERENCE ONLY <br />WEBBER/SMITH Associates, Inc. <br />20 Wright Avenue <br />Lititz, Pennsylvania 17543 <br />Phone: 717.625.4140 <br />Email:info@webbersmith.com <br />SHEET TITLE: <br />FOR <br />DRAWING STATUS <br />FINAL <br />PROJECT NUMBER <br />www.webbersmith.com <br />SEAL <br />M-001-1 <br />BWI <br />JSD <br />04/02/2024 <br />MECHANICAL <br />COVER SHEET <br />2350 Pullman WSS OCTA Aspire <br />Bakeries <br />2350 Pullman Street <br />Santa Ana, CA 92705 <br />CA <br />5387 <br />© 2024 WEBBER/SMITH Associates, Inc., All Rights Reserved <br />2350 <br />Pullman,LLC <br />SHEET INDEX - MECHANICAL <br />SHEET <br />NUMBER SHEET NAME <br />M-001-1 MECHANICAL COVER SHEET <br />M-100-1 FLOOR PLAN - MECHANICAL <br />M-601-1 MECHANICAL DETAILS AND SCHEDULES <br />NO. DATE DESCRIPTION <br />A 04/02/2024 ISSUED FOR PERMIT AND <br />CONSTRUCTION <br />REGISTERED PROFESSIONAL ENGINEER33478 <br />JAMES S DEPEW <br />STATE OF CALIFORNIAMECHANICAL <br />4/2/24 <br />Deferred submittal to 101120904 (permit <br />issued on 3/4/25) for Mechanical unit rooftop <br />support <br />Def Bldg permit #101124233 <br />APPROVALS: <br />PLNG - N. Tran <br />BLDG - CSG