My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
40130320 - Permit
PBA
>
Building
>
Permits
>
P
>
Pacific Ave
>
120 S Pacific Ave Unit# 39
>
40130320 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2021 9:18:59 AM
Creation date
7/20/2021 9:18:57 AM
Metadata
Fields
Template:
Permit
Permit Number
40130320
Full Address
120 S Pacific Ave Unit# 39
Permit ID
222099
Master ID Number
2016-130955
Project Name
West first and Pacific Townhomes
Street Number
000120
Street Direction
S
Street Name
Pacific
Street Suffix
Ave
Unit Number
39
Building Use Code
Resid-Multi-unit
Job Types
New
Permit Type
Mechanical
Applied Date
7/25/2016
Issued Date
5/2/2018
Finalized Date
12/5/2018
Flood Zone
X-0602320257J
Description of Work
Plan 4A/fees pd on M-70919
Nature of Work
New Condo w/garage
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ci+ Y <br />G f 3i:"' Wefioz <br />C O I'lS ULTI NG ENG I N E E RS <br />PACE I OF 1 <br />STRUCTURAL OBSERVATION REPORT <br />CITY of SANTAANA <br />THjS REPORT TNCLUDES ALL CONSTRUCTTON WORK THROUCH THE: September 19, 2O1g <br />PROJECT <br />LOCATION <br />OWNER <br />ARCHITECT <br />STRUCT. OBS, OF RECORD <br />STRUCTURAL OBSER!€R <br />'Venlan. Wslk" - MFH <br />Sanra An4 Califomia <br />OMON ONE J. N. <br />BLDG, PERMIT NUMBER <br />LOCATION/DMSION <br />ARC}IITECT J.N, <br />UC. OR RSGISTRATION No. <br />LIC. OR RECISTRAnON No. <br />06r6-2066 <br />The Olson <br />Wiltiam H€zMlhalch Archirects. Inc.wHA-2014284 <br />Gary A.McCIanahan, P.E.c42553 <br />E.ik Torres <br />OBSERVED STRUCTURAL ELEMENTS & THEIR CONNECTIONS: <br />a.nt.rior Ird E(erior c.ncrrt Framinqi i e., roof truss€s, roof shcalhin8, <br />shear elements, holdowns, floor sheathing, floor rrusses, beams, headers, ;d <br />gencral hardware <br />LOT(SI & PHASE OBSERVED: <br />Phrsc4: Building No.5 (600A) <br />unir 34 / Plan 4CR <br />Unit 35 / Plan 4DR <br />Unir 35/ Plan 4BR <br />Unit 37 / Plar 4BR <br />Unir 38 / Plan 48 <br />Unii 39 / Plan 4A <br />120 S. Pacific Ar!. UniE 34-39 <br />Sanla Anr, CA Trad # I 7979 <br />OBSE YED DEFICIE NCIES:(ATTACH ADDITIONAI PACES E NECESSARY)Initial / Comnlelion D,r. <br />Th! deficienci.s noted during rhe obs.rvarion visir have been conecled and/or installcd by a <br />collaborared ellon offie foremsn and projecr superintende <br />cJ4.M. /t)9-19-201E <br />I, I AM THE REGISTERED ENGINEER WHO HAS RESPONSIBLE CHARGE FOR THE <br />STRUCTURAL OBSERVANON2, I, OR ANOTHER QUALIFIED-CHARGE OBSERVER WHO I TIAVE DESICNATED <br />ABO}'E AND IS IJNDER MY RESPONSIBLE CFIARCE, t{AS PERFORMED TTIE <br />REQUIRED SITE VISITS AT EACH SIGNIITCANT CONSTRUCTION STAGE IO <br />VERIFY IF THE STRUCTURE IS IN GENERAL CONFORMANCE WIIH II{E <br />APPROVED PL.A.NS AND SPECIFICATIONS,3, ALL DEFICIENCIES, WHICH I DOCT'MENTED, TIAVE BEEN CORRECIED TJNLESS <br />OTHERWISE INDICATED ABOVE,4. ALL OBSERIED DEFICIENCIES STIALL BE CORRECTED AND AI'PROVED BY ]HE <br />OBSERVER PR]OR TO FNAT ACCEMANCE OF lHE STRUCTUR-AI SYSTEMS BY <br />THE BUILDING DEPARTMENT <br />5, IHIS REPORT IS PROVIDED TO THE OWNER AS A PART OF THE OWNERS <br />OVERALL CONSTRUCTION QUALITY CONTROL PROGRAM6. OPTION ONE TIAS PROVIDED STRUCTURAL OBSERVATION IN ACCORDANCE <br />WITH THE SEAOC RECOMMENDED CUIDELIMS FOR THE PRACTICE OF <br />STRUCTURALENOTNEERINO IN CALIFORNIA.STAMT OF EN6INEER-OF.RECORD <br />SIGNED BY September I9,2018 <br />Gary nahan, ?.E, <br />STRUCTURAL OBSERYNTION DOES NOT WAIVE THE REQUIREMENTS FOR INSPECT1ONS BY CITY BU'LDINGINSPECTORS ALL WORK MUST COMPI-Y WMI Trc,C,PPIOVTD pt.e.Ns AND APPLICABLE Sr,qrE * I-OC.U iOOCS <br />zMG _9OR-?H4 _6LOG _5 _F r arntn4 <br />Mc <br />z <br />F <br />Erp <br />oN <br />c,vlL <br />-2020 <br />(! <br />oi CAL <br />* <br />Septembs 19,2018 <br />coosrruction st'se: N/A f] *+e I e**,r f] **"," n Yr,"l* n Pr)ioer€sr Tl P.€{-u 3+!6aratdri -,Jtd U Opio. <br />N9!q when box is checkcd. il indicates thal construction stage is in progrcss, and it has oot yer bE€n complclcd ar rhe rime ofobr.rvation s?s cooducted <br />I srn ucruul svsrEM wAs vrsuAlly .B'ERVED To BE rN .ENERAI- coNFoRrvr,ANcE wmr rHE AppRovED pLANs <br />I srnucrune.l oertctENclEs ARE oF A MINoR NATURE & MAy BE RE'TEWED By crry BLDG lNspECToR FoR coMpLIANcE <br />I DECLARE TIIAT TtrE FOLLOMNG STATEMENTS ARE TRTIE TO THE BEST OF I\TY KNOWLEDGE AND BELIEF
The URL can be used to link to this page
Your browser does not support the video tag.