Laserfiche WebLink
DISCLAIMER: UNAUTHORIZED USE OF THIS DRAWING SETWITHOUT WRITTEN PERMISSION FROM INFINITY SOLAR, INC. IS INVIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT TOCIVIL DAMAGES AND PROSECUTIONS.INFINITY SOLAR, INC.749 N MAIN ST.ORANGE, CA 92868PHONE: (714) 880-8089LIC NO.: C10 #824287(E) GROUNDINGELECTRODEGROUNDRODPV AC DISCONNECT30A AC NON-FUSED240V, NEMA 3RVISIBLE/LOCKABLELABELED ACDW/ N-G BOND04TO UTILITY GRID(OVERHEAD)(E) 200A MAIN SERVICE PANEL240/120 V 1Ø, 3WMAIN BUSS: 200AMAX. BREAKER CALC.:200A X 1.2 - 200A = 40ASOLAR BREAKER LOCATEDAT THE FURTHEST END OFBUS BAR FROM THE MAINBREAKER OR FEEDER UNITPOINT OF INTERCONNECTIONLOAD SIDE 705.12(B)(3)(2)MAIN (E) 200A(N) 20A0220A01JUNCTIONBOXNEMA 4WALLROOFTOPBRANCH 1:8 MEYER BURGER MEYERBURGER BLACK 380WPV MODULESWITH ENPHASE IQ8A-72-2-US[240V] MICROINVERTERS1843203IQ ENVOY15AENPHASEIQ COMBINER 4 BOXW/ ENPHASE IQ ENVOYCONDUCTOR AND CONDUIT SCHEDULE W/ELECTRICAL CALCULATIONSIDTYPICALCONDUCTORCONDUITCURRENT-CARRYING CONDUCTORSIN CONDUITOCPDEGCTEMP. CORR. FACTORCONDUIT FILL FACTORCONT. CURRENTMAX. CURRENT (125%)BASE AMP.DERATED AMP.TERM. TEMP. RATINGAMP. @ TERMINAL01112 AWG PV WIRE, COPPERFREE AIRN/AN/A6 AWG BARE, COPPER0.76 (53°C)111.60A14.50A40A30.40A90°C40A02110 AWG THWN-2, COPPER0.75'' DIA. EMT220A8 AWG THWN-2, COPPER0.76 (53°C)111.60A14.50A40A30.40A75°C35A03110 AWG THWN-2, COPPER0.75'' DIA. EMT3N/A8 AWG THWN-2, COPPER0.96 (31°C)111.60A14.50A40A38.40A75°C35A04110 AWG THWN-2, COPPER0.75'' DIA. EMT320A8 AWG THWN-2, COPPER0.96 (31°C)111.60A14.50A40A38.40A75°C35AC.B.PAPER SIZE: 11" X 17" (ANSI B)DRAWING TITLE:DRAWN BY:DATE:DRAWING NO:8/30/2023ENGINEER OF RECORDK.T.NEW PV SYSTEM: 3.040 kWpANDY LAM1005 EVONDA ST,SANTA ANA, CA 92703APN: 10022215DESIGN LEAD: T.M.DESIGNED BYSOLAR DEPLOYED, LLC931 10TH STREET #114MODESTO, CA 95354(209)671-2001SIGNATURE:CHECKED BY:PV.0601LINE DIAGRAMPV.06LINE DIAGRAMNOTES1.PV SOURCE CIRCUIT(S) ARE TO BE SUNLIGHT-RESISTANTPV-WIRE AS PERMITTED BY CEC 690.31(B).2.ALL DIRECT CURRENT CIRCUITS ARE TO BE INSTALLED INMETAL RACEWAY FROM THE POINT OF PENETRATION OF THESURFACE OF THE BUILDING OR STRUCTURE TO THE MAINSERVICE PANEL AS MANDATED BY CEC 690.31(E).3.WEATHERPROOF J-BOX – NEMA 3R.4.ALL WORK SHALL COMPLY WITH THE 2022 CALIFORNIAELECTRICAL CODE (C.E.C.) AND ALL OTHER LOCAL CODES ASAPPROVED BY THE AUTHORITY HAVING JURISDICTION.1005 N Evonda St#211/7/2023