My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1422 W Marion Way - 101121871 & 20184663 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Marion Way
>
1422 W Marion Way
>
1422 W Marion Way - 101121871 & 20184663 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2025 1:45:16 PM
Creation date
8/6/2025 9:54:38 AM
Metadata
Fields
Template:
Plan
Permit Number
20184663
101121871
Full Address
1422 W Marion Way
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SHEET: 8 OF 8 <br />DATE: <br />DE JOB NO.: <br />BATTERY ATTACHMENT CHECK HORIZONTAL AND LATERAL LOADS <br />287 lb <br />TESLA POWERWALL 3 Weight = 287 lb 1.5 ft <br />Number of screws 4 <br />Shear acting on all screws = 287lb/ 71.75 lb, minimal, OK <br />Withdrawal acting on 2 screws due to eccentric load = <br />eccentricity = 6.1"/2 3.05 in <br />Eccentric Moment = 72.946 ft-lb <br />Distance between brackets = 1.5 ft <br />Total load distributed between 2 screws at the top bracket = 48.6 lb <br />Load per screw = 24.3 lb <br />Check 1/4" or M6 screws <br />For 1/4" Lag into .5G wood 200 lb <br />1/4" Lag with min 2" penetration for each attachment <br />Capacity per screw 500 lb <br />Z' = Z*CD =170*1 lb > 170 lb OK <br />Interaction Equation ft/Ft+fv/Fv 0.0486 + 0.42206 = 0.4707 < 1 OK <br />BY: Doug Engineering GUC-3004 <br />PROJECT: PV Panels for Robert Dominguez <br />CLIENT: Guyou Construction, Inc. 11/26/2024 <br />1422 W Marion <br />Way1/24/2025
The URL can be used to link to this page
Your browser does not support the video tag.