My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2060 N Tustin Ave- need V2 & V3 - 101116106 & 20180500 - Plan
PBA
>
Building
>
ProjectDox
>
T
>
Tustin Ave
>
2060 N Tustin Ave
>
2060 N Tustin Ave- need V2 & V3 - 101116106 & 20180500 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2025 1:46:42 PM
Creation date
8/6/2025 10:09:06 AM
Metadata
Fields
Template:
Plan
Permit Number
20180500
101116106
Full Address
2060 N Tustin Ave
Document Relationships
101116106 - Permit
(Permit - Plan)
Path:
\Building\Permits\T\Tustin Ave\2060 N Tustin Ave
20180500 - Permit
(Permit - Plan)
Path:
\Building\Permits\T\Tustin Ave\2060 N Tustin Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Apr-2016, Rev 7BI 7.2.3-7 BI 7.2.3-7 <br />You are now ready for the rack of your <br />choice. Follow all the directions of <br />the rack manufacturer as well as the <br />module manufacturer. <br />All roofi ng manufacturers’ written <br />instructions must also be followed <br />by anyone modifying a roof system. <br />Please consult the roof manufacturer's <br />specs and instructions prior to <br />touching the roof. <br />Using drill with 7/32" bit, drill pilot hole into roof <br />and rafter, taking care to drill square to the roof. <br />Do not use mount as a drill guide. Drill should be <br />‘long style bit' aka ‘aircraft extension bit’ to drill a <br />3" deep hole into rafter. <br />Clean off any sawdust, and fi ll hole with sealant <br />compatible with roofi ng materials. <br />Slide fl ashing into position. Prepare hanger bolt <br />with hex nut and sealing washer. Insert into hole <br />and drive hanger bolt until QBlock stops rotating <br />easily. Do NOT over torque. <br />Insert EPDM rubber washer over hanger bolt into <br />block. <br />2 3 <br />54 6 <br />87 <br />1 <br />Classic Composition Mounting Instructions <br />Installation Tools Required: tape measure, roofi ng bar, chalk line, stud fi nder, caulking gun, sealant compatible with roofi ng materials, <br />drill with 7/32" long-style bit, drill or impact gun with 1/2" deep socket. <br />Locate, choose, and mark centers of rafters to be <br />mounted. Select the courses of shingles where <br />mounts will be placed. <br />Carefully lift composition roof shingle with roofi ng <br />bar, just above placement of mount. Remove nails <br />as required. See "Proper Flashing Placement" on <br />next page. <br />Insert fl ashing between 1st and 2nd course. Slide <br />up so top edge of fl ashing is at least 3/4" higher <br />than the drip edge of the 3rd course and lower <br />fl ashing edge is above the drip edge of 1st course. <br />Mark center for drilling. <br />Using the rack kit hardware, secure the racking <br />(L-foot) to the mount using torque specs from <br />racking manufacturer. If racking manufacturer does <br />not specify torque setting, tighten to 13 ft.-lbs. <br />WARNING: Quick Mount PV products are NOT designed for and should NOT be used to anchor fall protection equipment. <br />3rd course <br />1st course <br />3rd course <br />2nd course <br />2060 N Tustin Ave - 101116106 & <br />20180500 <br />10/4/2023
The URL can be used to link to this page
Your browser does not support the video tag.