Laserfiche WebLink
PAGE <br />REV: I 2/14/2025 <br />MIGUEL TOLEDO <br />2140 S BROADWAY, SANTA ANA, <br />CA, 92707 <br />PROJECT NUMBER: <br /> 109R-140TOLE <br />SHEET <br />DESIGNER: <br />AL AMEEN V H <br />CUSTOMER RESIDENCE: <br />TEL. (714) 272-5451 <br />APN: 015-082-22 <br />(415) 580-6920 ex3 <br />Template_version_v5_2024.02.28 <br />2500 WHITE RD. SUITE A, IRVINE CA 92614 <br />PHONE 805.540.7603 <br />FAX 949.215.7778 <br />CA CL #750184 <br />GILBERT CORREIA, C10, C46 <br />COVER SHEET <br />SCOPE OF WORK GENERAL NOTES <br />PV-1.0 <br />VICINITY MAP <br />#SSTAMPCS <br />#ESTAMPCS <br />ABBREVIATIONS <br />A AMPERE <br />AC ALTERNATING CURRENT <br />AFC ARC FAULT CIRCUIT INTERUPTER <br />AZIM AZIMUTH <br />COMP COMPOSITION <br />DC DIRECT CURRENT <br />(E)EXISTING <br />ESS ENERGY STORAGE SYSTEM <br />MSP MAIN SERVICE PANEL <br />(N) NEW <br />PRE-FAB PRE-FABRICATED <br />PSF POUNDS PER SQUARE FOOT <br />PV PHOTOVOLTAIC <br />RSD RAPID SHUTDOWN DEVICE <br />TL TRANSFORMERLESS <br />V VOLTS <br />W WATTS <br />SHEET INDEX <br />• EXISTING SYSTEM SIZE: 3975W DC, 3225W AC <br />• MODULES: (7) LONGI GREEN ENERGY TECHNOLOGY CO <br />LTD: LR5-54HABB-395M <br />• INVERTERS: (1) TESLA: POWERWALL 3 1707000-XX-Y, <br />• RACKING: UR - SPEEDSEAL DECKFOOT TO FRAMING - <br />SNR-DC-00449 <br />• ENERGY STORAGE SYSTEM: (1) TESLA: POWERWALL 3 <br />1707000-XX-Y, (1) EXPANSION 1807000-XX-Y <br />• RAPID SHUTDOWN: (3) TESLA MID CIRCUIT INTERRUPTER <br />(MCI) ROOFTOP MODULE LEVEL RAPID SHUTDOWN DEVICE <br />• POWER CONTROLLED SYSTEM (PCS) ENABLED <br />EQUIPMENT INSTALLED, SEE PV-4.0 FOR INTERCONNECTION <br />DETAILS <br />PAGE # DESCRIPTION <br />PV-1.0 COVER SHEET <br />PV-2.0 SITE PLAN <br />PV-2.1 ESS ELEVATION VIEW <br />PV-3.0 LAYOUT <br />PV-3.1 MOUNTING DETAIL <br />PV-4.0 ELECTRICAL <br />PV-4.1 ELECTRICAL CALCS <br />PV-4.2 BACKUP LOAD CALCS <br />PV-4.3 PANEL SCHEDULE <br />PV-5.0 SIGNAGE <br />PV-5.1 SIGNAGE <br />• ALL WORK SHALL COMPLY WITH 2022 CRC/CBC/CEBC, 7-16 ASCE & 2018 NDS, <br />MUNICIPAL CODE, AND ALL MANUFACTURERS' LISTINGS AND INSTALLATION <br />INSTRUCTIONS. <br />• PHOTOVOLTAIC SYSTEM WILL COMPLY WITH CEC 2022. <br />• ELECTRICAL SYSTEM GROUNDING WILL COMPLY WITH CEC 2022. <br />• PHOTOVOLTAIC SYSTEM IS FUNCTIONALLY GROUNDED. NO CONDUCTORS ARE <br />SOLIDLY GROUNDED IN THE INVERTER. SYSTEM COMPLIES WITH 690.41(A). <br />• MODULES CONFORM TO AND ARE LISTED UNDER UL 61730. <br />• INVERTER CONFORMS TO AND IS LISTED UNDER UL 1741. <br />• RACKING CONFORMS TO AND IS LISTED UNDER UL 2703. <br />• SNAPNRACK RACKING SYSTEMS, IN COMBINATION WITH TYPE I, OR TYPE II <br />MODULES, ARE CLASS A FIRE RATED. <br />• RAPID SHUTDOWN SYSTEM IN COMPLIANCE WITH CEC 2022 690.12(B)(1) WHERE <br />CONDUCTORS OUTSIDE OF THE ARRAY ARE LIMITED TO LESS THAN 30V IN 30 <br />SECONDS AND CEC 2022 690.12(B)(2)(2) WHERE CONDUCTORS INSIDE THE <br />ARRAY BOUNDARY IS LIMITED TO LESS THAN 80V IN 30 SECONDS <br />• CONSTRUCTION FOREMAN TO PLACE CONDUIT RUN PER 690.31(D). <br />• ARRAY DC CONDUCTORS ARE SIZED FOR DERATED CURRENT. <br />• 14.79 AMPS MODULE SHORT CIRCUIT CURRENT. <br />• 23.11 AMPS DERATED SHORT CIRCUIT CURRENT [690.8 (A)(1) & 690.8 (B)]. <br />• ENERGY STORAGE SYSTEM CONFORMS TO AND IS LISTED UNDER UL 9540. <br />• ENERGY STORAGE SYSTEM LIVE PARTS ARE NOT ACCESSIBLE DURING <br />ROUTINE MAINTENANCE. SYSTEM VOLTAGE IN ACCORDANCE WITH CEC 706.20 <br />AND EXCEPTION 1 CEC 706.20 (B). <br />• ADDITIONAL DISCONNECTING MEANS SHALL BE INSTALLED WHERE THE <br />CIRCUITS FROM THESE TERMINALS PASS THROUGH A WALL OR PARTITION PER <br />706.15(D). <br />• LISTED, COMBINATION TYPE AFCI SHALL BE INSTALLED WHERE BACKED UP <br />CIRCUIT WIRING IS EXTENDED MORE THAN 6FT AND DOES NOT INCLUDE ANY <br />ADDITIONAL OUTLETS OR DEVICES PER CEC 210.12(D). <br />• ALL PASS-THROUGH CONDUCTORS MUST COMPLY WITH CEC 312.8 <br />• THE CAPACITY OF THE STANDALONE SYSTEM SUPPLY SHALL BE EQUAL TO OR <br />GREATER THAN THE LOAD POSED BY THE SINGLE LARGEST UTILIZATION <br />EQUIPMENT CONNECTED TO THE SYSTEM PER CEC ARTICLE 710.15(A) <br />• NEW SYSTEM SIZE: 2765W DC, 11500W AC <br />• COMBINED SYSTEM SIZE: 6740W DC, 14725W AC <br />NEW 200A PV LOAD CENTER TO BE INSTALLED <br />I <br />Bldg #101122013 & Elect #20184760 <br /> <br />APPROVALS: <br />ELECT - M. Smith <br />**The scope of the plans is for the installation of the <br />solar photovoltaic system only and the approval is <br />subject to compliance with all applicable city and state <br />codes and regulations regarding construction. The <br />approval of the plans does not constitute any <br />certification of the accuracy, completeness, or building <br />permit status of the existing buildings and structures <br />as shown. ** <br />2140 S Broadway <br />3/21/2025