My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
526 S Ross St - 101122337 & 20185008 - Plan
PBA
>
Building
>
ProjectDox
>
R
>
Ross St
>
526 S Ross St
>
526 S Ross St - 101122337 & 20185008 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2025 1:48:10 PM
Creation date
8/6/2025 10:26:03 AM
Metadata
Fields
Template:
Plan
Permit Number
20185008
101122337
Full Address
526 S Ross St
Text box
ID:
1
Creator:
COSA-PRIVATE\WRIDHUAN
Created:
8/6/2025 10:27 AM
Modified:
8/6/2025 10:26 AM
Text:
mailto:projects@evengineersnet.com
ID:
2
Creator:
COSA-PRIVATE\WRIDHUAN
Created:
8/6/2025 10:27 AM
Modified:
8/6/2025 10:26 AM
Text:
http://www.evengineersnet.com/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
01/16/2025 <br />RE: Structural Certification for Installation of Residential Solar <br /> RUBEN VELASCO:526 S ROSS ST, SANTA ANA, CA, 92701 <br />Attn: To Whom It May Concern <br />Design Criteria <br />Code 2022 California Building Code (ASCE 7-16) <br />Risk category II Wind Load (component and Cladding) <br />Roof Dead Load Dr 10 psf V 96 mph <br />PV Dead Load DPV 3 psf Exposure B <br />Roof Live Load Lr 20 psf <br />Ground Snow S 0 psf <br />If you have any questions on the above, please do not hesitate to call. <br />Signed:01/16/2025 <br />Sincerely, <br />Eugene Munyanziza, P.E. <br />EV Engineering, LLC <br />projects@evengineersnet.com <br />http://www.evengineersnet.com <br />Exp: 06/30/2026 <br />This Letter is for the existing roof framing which supports the new PV modules as well as the attachment <br />of the PV system to existing roof framing. From the field observation report, the roof is made of <br />Composition Shingle roofing over roof plywood supported by 2X4 Rafters at 24 inches. The slope of the <br />roof was approximated to be 26 degrees. <br />After review and based on our structural capacity calculation, the existing roof framing has been <br />determined to be adequate to support the imposed loads without structural upgrades. <br /> I certify that the PV module assembly including all attachments supporting it have been reviewed to be in <br />accordance with manufacturer's specifications. Capacity Calculations were done in accordance with <br />applicable building codes. <br />projects@evengineersnet.com <br />http://www.evengineersnet.com <br />HISTORIC-526 S <br />Ross St3/21/2025
The URL can be used to link to this page
Your browser does not support the video tag.