Laserfiche WebLink
PAGE <br />REV: F1 3/27/2025 <br />RUBEN VELASCO <br />526 S ROSS ST, SANTA ANA, CA, <br />92701 <br />PROJECT NUMBER: <br />109R-526VEL1 <br />SHEET <br />DESIGNER: <br />HIMANSHU VASHIST <br />CUSTOMER RESIDENCE: <br />TEL. 7143818044 <br />APN: 010-134-15 <br />(415) 580-6920 ex3 <br />Template_version_v5_2024 02 28 <br />2500 WHITE RD.SUITE A,IRVINE CA 92614 <br />PHONE 805.540.7603 <br />FAX 949.215.7778 <br />CA CL #750184 <br />2500 WHITE RD. SUITE A, IRVINE CA 92614 <br />PHONE 805.540.7603 <br />FAX 949.215.7778 <br />CA CL #750184 <br />GILBERT CORREIA, C10, C46 <br />PL PL PL PL <br />PLPLPL PL PL PLSITE PLAN <br />PV-2.0 <br />#SSTAMPSP <br />#ESTAMPSP <br />ESS SHALL BE INSTALLED 3FT FROM DOORS AND WINDOWS <br />IN ACCORDANCE WITH R328.4. ESS UNITS SHALL BE <br />SEPARATED FROM EACH OTHER BY NOT LESS THAN 3 FEET <br />EXCEPT WHERE SMALLER SEPARATION DISTANCES ARE <br />DOCUMENTED TO BE ADEQUATE BASED ON LARGE/SCALE <br />FIRE TESTING. <br />NOTE: ROOFTOP MODULE LEVEL RAPID <br />SHUTDOWN DEVICE INSTALLED PER CEC <br />690.12 <br />SITE PLAN -SCALE =0'-0 3/64" = 1'-0" <br />(E) DETACHED <br />GARAGE (TYP.) <br />(E) PV ARRAY (TYP.) <br />(N) ARRAY AR-01 <br />FIRE SETBACKS <br />(18" TYP) <br />ROOF PATHWAYS <br />(3' TYP) <br />(N) ARRAY AR-02 <br />(E) FENCE <br />A INV <br />AC AMP <br />SE MDAC <br />INV A A A AA A (E) RESIDENCE <br />ROOF PATHWAYS <br />(3' TYP) <br />(E) GATE (TYP.)B B B BB B S ROSS STSITE PLAN - SCALE = <br />(E) PV EQUIPMENT <br />NOTES: <br />RESIDENCE DOES NOT CONTAIN ACTIVE FIRE <br />SPRINKLERS. <br />ARRAY DETAILS: <br />TOTAL ROOF SURFACE AREA: 2172.0 SQFT. <br />TOTAL PV ARRAY AREA(E+N): 564.72 SQ FT. <br />PERCENTAGE PV COVERAGE: <br />(TOTAL PV ARRAY AREA/TOTAL ROOF SURFACE <br />AREA) * 100 (E+N)= 26% <br />ARRAY <br />PITCH <br />PV AREA <br />(SQFT) <br />AR-01 26° 168.2 <br />AR-02 26° 126.1590° <br />TRUE <br />AZIM <br />MAG <br />AZIM <br />348° 0° <br />78° <br />(E) DETACHED <br />STORAGE (TYP.) <br />(E) DETACHED <br />SHED (TYP.) <br />INTERIOR EQUIPMENT <br />SHOWN AS DASHED <br />POWERWALL ENERGY <br />STORAGE SYSTEM (ESS) <br />COMMUNICATION <br />WIRES <br />GROUNDING <br />ELECTRODE <br />SE <br />MP <br />SM <br />PM <br />SP <br />MAIN PANEL <br />SERVICE ENTRANCE <br />SCALE: NTS <br />NOTE: NOT ALL ITEMS IN LEGEND <br />WILL APPEAR IN SITE PLAN <br />LC <br />LEGEND ELECTRIC VEHICLE <br />SUPPLY EQUPMENT <br />ACREL METER <br />IQ COMBINER BOX <br />ENERGY STORAGE <br />SYSTEMDC DISCONNECT(S) <br />AC DISCONNECT(S) <br />INVERTER(S) <br />SOLAREDGE METER <br />INV <br />DC <br />SUB-PANEL <br />AC <br />DEDICATED PV METER <br />SUNRUN METER <br />SEM PV LOAD CENTER <br />EV <br />AM <br />CB BP <br />BI 1BACKUP INTERFACE <br />METER ADAPTER <br />BACKUP LOADS PANEL <br />MD MICROGRID <br />INTERCONNECT DEVICE <br />MA <br />GENERATION PANEL GP <br />BACKUP GATEWAYBG <br />RSD <br />EXTERNAL <br />RAPID <br />SHUTDOWN <br />SWITCH <br />RAIL <br />STANDOFFS & <br />FOOTINGS <br />SOLAR MODULES <br />SP BP <br />RSD <br />F1 <br />F1 <br />Signed: 03/26/2025 <br />Revision to 20185008 (issued on 3/21/25) <br /> <br />Revision 1 #20185512 <br /> <br />APPROVALS: <br />ELECT - M. Smith <br />HISTORIC-526 S <br />Ross St4/17/2025