My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 3%4 W MacArthur Blvd WCC01 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
MacArthur Blvd
>
3000 3/4 W MacArthur Blvd Unit# WCC01
>
3000 3%4 W MacArthur Blvd WCC01 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 5:00:08 AM
Creation date
8/12/2025 5:00:04 AM
Metadata
Fields
Template:
Plan
Permit Number
101124327
Full Address
3000 3/4 W MacArthur Blvd Unit# WCC01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
project by CASA <br /> location date 6/9/2025 <br /> client job no. 25-181 <br />CLU3418 <br />3000 WEST MACARTHUR <br />SMARTLINK <br />Note: for maximum compression load, consider Ev is in the same direction of the gravity <br />2343 lbs <br />4615 lbs <br />2307 lbs 2307 lbs <br />4335 lbs 4335 lbs <br />Mot=total horizontal*unit height/2 <br />Mot=98406 lbs-in <br />T/C= Mot/ unit width <br />T/C=4335 lbs <br />Vertical Reaction= Total Vertical/2 <br />Vertical Reaction= 2307 lbs <br />Net Omega Compression = Vertical Reaction+T/C <br />Net Omega Compression= 6642 lbs (compression) <br />Compression Force (lb)= 6642 <br />Shear Force (lb)= 2343 < 3000 (V allow)OK <br />Tension Force (lb)= 3203 < 1870 (T allow)Fails <br />t/T + v/V= 2.49 <Fails(4.2.2, ESR 1917) <br />Use Four (4) 5/8 inch diameter x 3-1/4 inch embedment Hilti Kwik <br />Bolt TZ2 expansion anchors, (2) each side of unit (minimum), to <br />attach unit to new pad on grade, per ESR-4266. Fill all holes in <br />support rails with anchors, typical. See following pages for <br />anchorage calcs. <br />AT&T <br />CLU3418 <br />7 of 39
The URL can be used to link to this page
Your browser does not support the video tag.