My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3925_Hazard_P0115656_2024-194175_Grading - Plan (2)
PBA
>
Building
>
ProjectDox
>
H
>
Hazard Ave
>
3925 W Hazard Ave Unit# 2
>
3925_Hazard_P0115656_2024-194175_Grading - Plan (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 11:31:46 AM
Creation date
8/13/2025 11:26:56 AM
Metadata
Fields
Template:
Plan
Permit Number
P0115656
Full Address
3925 W Hazard Ave Unit# 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TMC ENGINEERS INC. <br />Geotechnical, Structural and Civil Engineering <br />Add: 9542 Pacific Ave, Anaheim, CA92804. Phone: 714-829-5053; Email: Tienchu.pe@gmail.com <br /> <br />Page 12 <br /> <br /> <br />7.2.4 Foundation Construction <br />It is anticipated that the entire structure will be underlain by onsite soils of very low expansion <br />potential. All new footings should be founded at a minimum depth of 24 inches below the <br />lowest adjacent ground surface. All continuous footings should have at least two No. 4 <br />reinforcing bars placed both at the top and two No. 4 reinforcing bars placed at the bottom of <br />the footings. <br /> <br />+ New building footings: <br />New continuous footings 12 inches wide at one-story, 15 inches wide at two-story. 24 inches <br />deep at interior and exterior footings. Shallow pad footings at least 24 square inch and 24 <br />inches deep. All continuous new footings should have at least two No. 4 reinforcing bars <br />placed at the top and two No. 4 reinforcing bars placed at the bottom of the footings. <br /> <br /> <br />7.2.5 Concrete Slab <br />Concrete slabs should be a minimum of 4 inches thick and reinforced with a minimum of No. <br />4 bars spacing at 18 inch both ways and its equivalent. All slab reinforcement should be <br />supported to ensure proper positioning during placement of concrete. <br />Concrete slabs in moisture sensitive areas should be underlain with a vapor barrier <br />consist of a minimum of 10-mil vaper retarder with all laps sealed. A minimum of 2 inch of <br />sand should be placed over the membrane to aid in uniform curing of concrete and 2 inch of <br />sand under vapor barrier. <br />Alternate per Cal Green code, a 4-inch-thick base of ½ inch or larger clean aggregate <br />shall be provided with a 10-mil vaper retarder with all laps sealed in direct contact with <br />concrete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.