My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2350 S Pullman St - DEF - Exterior & Interior Framing - Plan
PBA
>
Building
>
ProjectDox
>
P
>
Pullman St
>
2350 S Pullman St
>
2350 S Pullman St - DEF - Exterior & Interior Framing - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2025 5:00:12 AM
Creation date
9/6/2025 5:00:04 AM
Metadata
Fields
Template:
Plan
Permit Number
101124188
Full Address
2350 S Pullman St
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Import Agent
Created:
9/6/2025 5:00 AM
Modified:
9/4/2025 12:27 PM
Text:
x
ID:
2
Creator:
Import Agent
Created:
9/6/2025 5:00 AM
Modified:
9/4/2025 12:27 PM
Text:
x
ID:
3
Creator:
Import Agent
Created:
9/6/2025 5:00 AM
Modified:
9/4/2025 12:27 PM
Text:
6/27/2025
ID:
4
Creator:
Import Agent
Created:
9/6/2025 5:00 AM
Modified:
9/4/2025 12:27 PM
Text:
RMT
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Submittal <br />Whiting-Turner Contracting Co <br />2350 Pullman Street <br />Aspire Bakeries Truck Dock/Receiving Relocation <br />(020620) <br />Santa Ana, CA 92705 <br />Project: <br />Procurement Item: <br />Type:Report <br />Status:03. Submitted <br />Submittal No.: <br />09APackage No.: <br />Spec Section: <br />054000-1.5D_001 <br />054000 <br />Spec Sub-Section:1.5-D <br />Current Review Cycle:1 <br />Description:Cold-formed Metal Framing : Research Reports <br />Subcontractor:Infinity Drywall Contracting, Inc. <br />Responsibility:Webber/Smith Assoc., Inc. - Leonard Morgan <br />WT Sent <br />Date (Actual) <br />WT Received <br />Date (Actual) <br />Preparation <br />Due Date <br />WT Review <br />Due Date <br />WT Forwarded <br />Date (Actual) <br />Architect Return <br />Date (Actual) <br />Architect Review <br />Due Date <br />07/11/2025 06/25/2025 07/18/2025 06/25/2025 07/02/2025 <br />THE WHITING-TURNER CONTRACTING COMPANY <br />RECEIVED AND REVIEWED FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS <br />Job No. <br />Sub No. <br />Date Submitted to A/E <br />Date Due <br />06/25/2025 <br />07/02/2025 <br />020620 <br />WE HEREBY STATE THAT THIS DOCUMENT HAS BEEN REVIEWED FOR <br />CONFORMANCE WITH THE DESIGN CONCEPT AND GENERAL COMPLIANCE WITH <br />THE CONTRACT DOCUMENTS. THIS APPROVAL IN NO WAY RELEASES THE <br />SUBCONTRACTOR / SUPPLIER FROM HIS RESPONSIBILITY TO ADHERE TO THE <br />REQUIREMENTS OF THE CONTRACT DRAWINGS, INCLUDING ALL DIMENSIONS <br />AND QUANTITIES. <br />Approved <br />Approved as Noted <br />Revise and Resubmit <br />Rejected <br />054000-1.5D_001 <br />Check Boxes Manually <br />06/25/2025 2:50 PMPrinted
The URL can be used to link to this page
Your browser does not support the video tag.