Laserfiche WebLink
-,,SANTA <br />ANA <br />PLr\11\6 <br />IBUL0I\C <br />tCiln <br />Plrnning & Bullding Agency <br />Buildlng Sltoty Divlslon <br />20 Clvlc Cent€r Plsza <br />P.O. Box 1988 (M-19) <br />Santa An8, CA 92702 <br />(714) 6/t7-5800 <br />www.sanla-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />Solar Photovoltalc (PV) Checklist for Detached STNGLE FAMILy RESTDENCES Onty <br />lnstructlons: The licensed contractor of rscord shall complete all soclions, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attach€d to each ol TWO sets of plans, of <br />sol -01 cac 2013 <br />minimum 1 1" x 17" size. lf answorino NO to an v of the quostions. Dl an check shall be required. <br />Proiecl Address:221 S. BAKER ST, SANTAANA, CA 92703 <br />conttactor company Name: SOUTHWEST SUN SOLAR' INC <br />Contractor at""r"" nr.O"r, <br />4 <br />5 <br />2 <br />3 <br />D <br />7 <br />YES NO <br />a tr <br />a Etr <br />9 Eltr <br />trtr <br />EI E] <br />Etr <br />Ertr <br />trtr <br />atr <br />A16 lho followlng applicable to tho proposed project? <br />Will the PV system layout provide the required threeJoot wide claar access pathways <br />per Section 605.1 1 of the Califomia Fire Code, and is this shown on the roof ptan? <br />Will th6 PV syslem be installed on a roof having only one roollng layer with no <br />overlays? <br />Will the PV anay be flush mounted to the existing roof so that the ptane of the <br />modules (panels) are parallel to the plane of ths roof? <br />Will ths PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do nol ov€rhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system b€ installod with a space of 2" minimum to 10" maximum between <br />the underside o, modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchoG be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />emb€dment into roof rafrers (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the slruclural pages of the plans WET stamped and signed by a California <br />licensad professional engineer? (including project specific site plan, pV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />10 atr <br />I certify under penelty of periury undsr the laws of the State of California above is true: <br />print Name. TRANG CONG PHAM Signature: <br />phone Number: 714 582 3909 oate: <br />Ema it Address: PERMIT@SOUTHWESTSUNSOLAR.COM <br />3 <br />RBv: 8/1712015 <br />le <br />1. <br />I