My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20165339 - Permit
PBA
>
Building
>
Permits
>
H
>
Hall Ave
>
2609 W Hall Ave
>
20165339 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2021 8:31:31 AM
Creation date
7/27/2021 8:31:30 AM
Metadata
Fields
Template:
Permit
Permit Number
20165339
Full Address
2609 W Hall Ave
Permit ID
239272
Master ID Number
2018-141931
Project Name
Miscellaneous Counter1 Permit
Street Number
002609
Street Direction
W
Street Name
Hall
Street Suffix
Ave
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
3/7/2018
Issued Date
3/7/2018
Finalized Date
4/4/2018
Flood Zone
X-0602320259J
Description of Work
Install new 4.83 kw roof mounted solar PV system (14 panels) ALL FEES PAID ON 10195796
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IXPEDITED PERMI-T PRoCESS I.oR SMALL.SCAI-E PV SYSTEMS <br />MICI{O-INVEII.I'EI]. <br />The informarion in this guideline is intended ro help local jurisdicrions and conrracbrs idendfy when Pv system installations <br />are simple, needing only a basic review and when an insrallation is more complex. lr is likely rhar 50%-75% of all residenrial <br />systems will comply with rhese simple criteria. For projects that fail to meer rhe simple crireria. resolution steps have been <br />suggested ro provide as a parh to permit approval. <br />Required InJormation for Perfiit: <br />l. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it <br />should represent relative location of componenrs ar sire (see supplied example sire plan). PV arrays on dwellings <br />with a 3 perimeler space at ridge and sides may not need separate hre service review. <br />2. Electrical diagram showing PV array configuration, wiring system, overcurrent protecrion, inverte( disconnects, <br />required signs, and ac connecrion to building (see supplied slandard electrical diagram). <br />3. SPecihcation shees and installation manuals (if available) for all manufacrured componenrs including, bu( nor <br />limited to, PV modules, inverter(s), combiner box, disconnecrs, and mounring system. <br />Step 1: Structural Review o[ PV Array Mounting System <br />13 thc aray to be mountcd on a dehned, permittcd roof structurc? Elyes Dno <br />U No due to non-compliant rool or a ground. mounL submit completed worksheet Jor the structure WKS I . <br />RooJ lttformation: <br />l. Is lhe roofrng type lighrweight (Yes = composition, lightweighr masonry metal, erc )COMP SHINGLE <br />If No, submit completed worksheet for rooJ structure wKSl No = heavy nusonry, slate, etc...) <br />2. Does the roof have a single roof covering? EIyes Eno <br />lf No. submit completed vorhsheet fu rooJ structure WKS I . <br />3. Provide method and type of weatherproofrng roof penetrations (e.g. flashing. caulk)FLASHING Y CAULK <br />M ounting Sy st ern Informat ion : <br />l. ls the mounting structure an gl3ineered producr designed to mounr PV modules with no more rhan an t8" gap <br />beneath the module frames? k!Yes LlNo <br />IJ No, provid.e details oI structural attachment cefiiled by a design Wlessional <br />2. For manufactured mounting systems. hll out information on the mounting sysrem below: <br />a. Mounting Sysrem Manufacrurer jY5j5Producr Name and Model#CLASSIC COMPOSITION MOUNT <br />b. Tolal Weighr of PV Modules and Rails 771.12 lbs <br />c. Total Number of Atrachment Points <br />d. weight per Arachmenr Poinr 1b+6127!4 lbs (if grearer than 45 lbs.seewKst) <br />e. N4aximum Spacing Berween Atrachmenr Poinrs on a Rail 48 inches (see product manual for <br />maximum spacing allowed based on maximum design wind speed) <br />Toral Surface Area of PV Modules (square Feet)609 Ftrf. <br />p Distributed weighr of PV Module on Roof (b + f)1 .26 lbs/fr: <br />If dtsfrbuted t'eight oI the PV slstem is grcater than 5 lbstf , see WKSI . <br />Step 2, Electrical Review o[ PV System (Calculations for Electrical Diagram) <br />In order for a PV slrstem to be consldercd for an exp€dlted permit procesq the followtnS must apply: <br />l. PV modules, utility-interactive invcners, and combiner boxes are identihed for use in PV systems. <br />2. The PV array is composed of 4 series strings or less per inve(er <br />5. The total inverter capacity has a conrinuous ac power ourput 13.440 Wafts or less <br />4. The ac interconnecrion point is on rhe load side of service disconnecting means (690.64(8)). <br />5. Oneo[the standard eleclrical diagrams(El.l,El.la,El.lb,orEl.lc)canbeusedtoaccuratelyrepresentlhePV <br />system. lnteractive PDF diagrams are available ar wwwsolarabcs.org/permirling <br />l:ill out the stundard electical diagrati completel]' A guide to the .lecn'ical diaqrom is lto|ided to help the applicant <br />ndtrstdnd etch blank toltll in Il th( electrt.'dl system is ntctre tornltler thdn the st.tnLfuirtl electrical didqratn cun elfectiveD' <br />(onnnunicdte. provide an alternatite diaqram with appropriate detoil <br />2 txrrDtt[D l)En,\ r I'ri()crss FC)R lV S\'\rtM\ - N4tcno. lN\,tr.lrF.
The URL can be used to link to this page
Your browser does not support the video tag.